Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-Finance | L1 | Accepted-Finance Rate as per BSR |
Tender Value
₹11 L
EMD Value
₹22,000
Closing Date
22 Sept 2026, 1:00 pmClosed
VDO GP Bhadera
GP Bhadera
Ward No. 07 Park me Vachnalay Nirmaan kary Bhadera
2026_PRD_596856_1
151-154/2026/Bhadera
Open Tender
Miscellaneous Works
Percentage
as per tender document
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Sarpanch GP Bhadera, MD RISL
₹22,000
Yes
22 Sept 2026
12 Sept 2026
22 Sept 2026
12 Sept 2026
22 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | work detial | - | - | - | - |
| 1.01 | Earthwork in foundation excavation up to1.5m, ramming bressing both sides backfilling and
dosposal of surplus soil within lead of 50m | 30.4 | Cum | 178.46 | ₹5,425.18 |
| 1.02 | Cement concrete in 1:4:8 mix including curing and compaction etc. | 5.18 | Cum | 3,531.8 | ₹18,294.72 |
| 1.03 | Brick work in foundation and plinth using brick of class designation 75 in CM 1:6 | 57.67 | Cum | 4,698.68 | ₹2,70,972.88 |
| 1.04 | Brick work in Superstructure using brick of class
designation 75 in CM 1:6 | 29.7 | cum | 248.61 | ₹7,383.72 |
| 1.05 | Reinforced cement concrete work includingcuring compaction, finishing with rendering incement sand mortar 1:3 and making good andjoints excluding cost of centering, shutteringand reinforcement in 1:1.5:3 (1cement:1.5course sand: 3-graded stone
aggregate20mm nominal size) | 5.59 | Cum | 5,582.69 | ₹31,207.24 |
| 1.06 | Providing and fabricating reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) in foundationand super structure up to
4.5m height aboveplinth level hot rolled deformed
(IS: 1139) cold twisted (IS: 1786) bars | 466.81 | Kg | 97.94 | ₹45,719.37 |
| 1.07 | Centering and shuttering with plywood or steelsheets including strutting, propping, bracingboth ways with wooden members
andremoval of from work | 36.78 | Sqm | 319.04 | ₹11,734.29 |
| 1.08 | girder | 828.06 | sqm | 92.52 | ₹76,612.11 |
| 1.09 | stone sirwan | 4.62 | sqm | 1,669.52 | ₹7,713.18 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.84 MB
BOQ_1058917.xls
BOQ • 0.30 MB
committeeLKS.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .