Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.7 LAdmitted-Fee/PreQual/Technical/Finance | -34.90% | ₹9.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.6 L+₹1.9 L (19.9%)Admitted-Fee/PreQual/Technical/Finance | -21.93% | ₹11.6 L+₹1.9 L (19.9%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.8 L
EMD Value
₹29,640
Closing Date
14 Sept 2026, 4:00 pmClosed
Executive Engineer PD 3rd Sgr
Executive Engineer PD 3rd Sgr
Up-gradation / Renovation of Central furniture store at S.K Park.
2026_PWDJK_322189_7
e-NIT No. 14-P of 08/2026 Dated -24- 08-2026
Open Tender
Civil Works
Percentage
50 days
Executive Engineer PD 3rd Sgr
As per NIT
2 documents required · 2 mandatory
₹600
Executive Engineer PD 3rd Sgr
₹29,640
18 Sept 2026
25 Aug 2026
15 Sept 2026
25 Aug 2026
14 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearance of ground for new block cutting tree braches, removing of tree roots etc incld ground also. | 12 | No | 650 | ₹7,800 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: from cutting edge 50 meter beyond 1m from cutting edge All kinds of soil. | 16.99 | Cum | 673.3 | ₹11,439.37 |
| 3 | Providing and laying dry stone soling in the Trenches/ feilds duly hand packed in level including ramming with iron rammers for foundation including all carriages up to 15 kms, Loading and unloading. | 5.46 | Cum | 950 | ₹5,187 |
| 4 | Supplying and filling in plinth with stone dust under floors incld watering and compacting , consolidation and carriage of materials upto site all complete. | 13.59 | Cum | 950 | ₹12,910.5 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring andshutterin work upto plinth level with:1:4:8 (1cement: 4coarses and: 8graded stone aggregate 40mmnominal size) | 5.46 | Cum | 5,202.9 | ₹28,407.83 |
| 6 | P/L in position cement conc. of specified grade excluding the cost of centering and shuttering. All work upto plinth level. 1:2:4 (1cement:2 coarse sand : 4 crushed graded stone agg. 20 mm size crushed) including all carriages of material involved. | 32.97 | Cum | 6,591.25 | ₹2,17,313.51 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 211.16 | Kg | 123.2 | ₹26,014.91 |
| 8Carriage of material by mechanical transport from source up to site of work. | |||||
| 8.01 | Sand /Stone aggregate below 40mm nominal size. (15 Kms) | 52 | Cum | 344.49 | ₹17,913.48 |
| 9 | 20 mm cement plaster finished with a floating coat of neat cement of mix 1:4 (1 cement : 4 fine sand) | 27.88 | Sqm | 459.4 | ₹12,808.07 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1078594.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .