Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹7.3 L+₹7,333.70 (1.02%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹7.8 L+₹58,268.40 (8.10%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Not Admitted-Finance CW 545 SANJAY GANDHI TRANSPORT NAGAR NEW DELHI 110042 | NORTH | DELHI | 110042 | - | Not Admitted-Finance Others-FDR/ EMD NOT RECEIVED | |
| 5 | Rejected-Technical | - | Rejected-Technical EMD/ FDR not submitted |
| Sl No | Description | Qty | Unit | JAI DURGA ENGINEERS AND CONTRACORS L1 | Mehar Enterprises L2 | Raj Engineering Co. L3 |
|---|---|---|---|---|---|---|
| 1.01 | Repair of M.S foundation for pump sets by disconnection of all electric connection decoupled the 300HP motor from pump and pump from suction and delivery line after cutting of all rusted nut bolts by the help of gas cutter at B P Station. | 2 | Jobs | 39,000 ₹46,020 Lowest | 40,300 ₹47,554 | 42,000 ₹49,560 |
| 1.02 | Dismantling of pump set with the M.S Base frame by cutting of all rusted nut bolts of base frame and take out the pump and motor and placing the safe place at ground as per site requirement with the help of chain pulley block/heavy labour. | 2 | Jobs | 29,500 ₹34,810 Lowest | 29,800 ₹35,164 | 31,000 ₹36,580 |
| 1.03 | Supply of nut bolts as per site requirement. | 80 | kgs | 7,520 ₹8,873.6 Lowest | 8,000 ₹9,440 | 8,000 ₹9,440 |
| 1.04 | Supply of neoprene rubber packing sheet 50% synthetic. | 90 | kgs | 22,230 ₹26,231.4 | 21,870 ₹25,806.6 Lowest | 22,950 ₹27,081 |
| 1.05 | Recasting the existing RCC foundation with steel bar and cement concrete. The job includes grouting the foundation bolts of 500 mm long and 30 mm dia. made out of SS410 etc. | 2 | Jobs | 29,400 ₹34,692 | 27,400 ₹32,332 Lowest | 30,900 ₹36,462 |
| 1.06 | Fabrication of new M.S base frame of size long 125" and width 40" by using M.S. channel 100x50 mm job includes welding, cutting, grinding of edges etc. | 2 | Jobs | 68,000 ₹80,240 Lowest | 69,000 ₹81,420 | 72,000 ₹84,960 |
| 1.07 | Fixing of base frame at proper level of the RCC foundation with grouted nut bolts as per site requirement. | 2 | Jobs | 19,000 ₹22,420 Lowest | 19,800 ₹23,364 | 20,500 ₹24,190 |
| 1.08 | Re fixing of pump & motor with alignment on the new fabricated base frame and reassembling with delivery and suction line by using of nut bolts and neoprene rubber packing. | 2 | Jobs | 47,800 ₹56,404 Lowest | 48,650 ₹57,407 | 51,800 ₹61,124 |
| 1.09 | Supply of Carbon Brush for 300HP Motor (As Per Sample) | 50 | Nos | 52,500 ₹61,950 Lowest | 52,500 ₹61,950 Lowest | 56,500 ₹66,670 |
| 1.10 | Providing Of Carbon Holder For 300HP Motor | 15 | Nos | 27,000 ₹31,860 Lowest | 27,975 ₹33,010.5 | 28,500 ₹33,630 |
Tender Value
Refer Docs
EMD Value
₹14,800
Closing Date
9 Sept 2026, 3:00 pmClosed
Executive Engineer (EM) M-13
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Repairing of foundation of pump set 2 and 4 and other allied work at Surajmal Vihar Booster Pumping station
2026_DJB_297971_1
NIT No-06 EE (EM) M-13/ (26-27)
Open Tender
Electrical Works
Works
30 days
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/c.5044833980
₹14,800
29 Sept 2026
4 Sept 2026
9 Sept 2026
4 Sept 2026
9 Sept 2026
4 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Repair of M.S foundation for pump sets by disconnection of all electric connection decoupled the 300HP motor from pump and pump from suction and delivery line after cutting of all rusted nut bolts by the help of gas cutter at B P Station. | 2 | Jobs | 80 | ₹160 |
| 1.02 | Dismantling of pump set with the M.S Base frame by cutting of all rusted nut bolts of base frame and take out the pump and motor and placing the safe place at ground as per site requirement with the help of chain pulley block/heavy labour. | 2 | Jobs | 80 | ₹160 |
| 1.03 | Supply of nut bolts as per site requirement. | 80 | kgs | 80 | ₹6,400 |
| 1.04 | Supply of neoprene rubber packing sheet 50% synthetic. | 90 | kgs | 80 | ₹7,200 |
| 1.05 | Recasting the existing RCC foundation with steel bar and cement concrete. The job includes grouting the foundation bolts of 500 mm long and 30 mm dia. made out of SS410 etc. | 2 | Jobs | 80 | ₹160 |
| 1.06 | Fabrication of new M.S base frame of size long 125" and width 40" by using M.S. channel 100x50 mm job includes welding, cutting, grinding of edges etc. | 2 | Jobs | 80 | ₹160 |
| 1.07 | Fixing of base frame at proper level of the RCC foundation with grouted nut bolts as per site requirement. | 2 | Jobs | 80 | ₹160 |
| 1.08 | Re fixing of pump & motor with alignment on the new fabricated base frame and reassembling with delivery and suction line by using of nut bolts and neoprene rubber packing. | 2 | Jobs | 80 | ₹160 |
| 1.09 | Supply of Carbon Brush for 300HP Motor (As Per Sample) | 50 | Nos | 80 | ₹4,000 |
| 1.1 | Providing Of Carbon Holder For 300HP Motor | 15 | Nos | 80 | ₹1,200 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_397185.xls
BOQ • 0.27 MB
C13.pdf
PDF • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .