Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
10 Mar 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PR & CC
TENDER FOR CARRYING OUT HOT REPAIR OF 14.2KG AND 19KG LPG CYLINDERS FOR NORTH
20000961-HD-10157
20000961-HD-10157
Open Tender
Two Bid
Unknown (Unspecified Location)
₹0
Exempted
10 Mar 2021
18 Feb 2021
10 Mar 2021
10 Mar 2021
18 Feb 2021 - 25 Feb 2021
25 Feb 2021
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | HOT REPAIR- 14.2KG | HOT REPAIR- 14.2KG — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 14.2 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. | - | Each |
| 2 | HOT REPAIR- 19KG | HOT REPAIR- 19KG — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 19 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. | - | Each |
| 3 | HOT REPAIR- 14.2KG UNNAO | HOT REPAIR- 14.2KG UNNAO — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 14.2 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. | - | Each |
| 4 | HOT REPAIR- 19KG UNNAO | HOT REPAIR- 19KG UNNAO — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 19 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. | - | Each |
| 5 | HOT REPAIR- 14.2KG PATNA | HOT REPAIR- 14.2KG PATNA — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 14.2 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. | - | Each |
| 6 | HOT REPAIR- 19KG PATNA | HOT REPAIR- 19KG PATNA — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 19 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. | - | Each |
| 7 | HOT REPAIR- 19KG PURNEA | HOT REPAIR- 19KG PURNEA — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 19 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. 8 HOT REPAIR- 14.2KG 42663- Each 12194 No CHAMPARAN JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 14.2 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. 9 HOT REPAIR- 19KG 42663- Each 2354 No CHAMPARAN JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 19 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000961-HD-10157.pdf
TENDER_DOCUMENT • 10.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .