| 1 | L1₹665.8 CrAdmitted-Finance PLOT NO B1 INFOCITY 122004 | REWARI | REWARI | HARYANA | 122004 | L1 | Admitted-Finance | |
| 2 | L2₹747.5 Cr+₹81.7 Cr (12.3%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AYYAPPA INFRA PROJECTS PVT.LTD L2 | Subhash Infraengineers Pvt. Ltd. L1 |
|---|---|---|---|---|---|
| 1.01 | Augumentation/Up-gradation of existing capacity of 20 MGD Sewage Treatment Plant at Pappan Kalan Ph I to achieveing treatment effluent parameter BOD/TSS<10 ppm/10 ppm along with operation and maintenance for 12 years. (Fixed @1.5 Crore per MGD) | 30 | MGD | 45,00,00,000 ₹45,00,00,000 Lowest | 45,00,00,000 ₹45,00,00,000 Lowest |
| 1.02 | Interim O& M Charge | 12 | Months | 51,41,53,665.12 ₹51,41,53,665.12 | 43,94,47,577.04 ₹43,94,47,577.04 Lowest |
| 1.03 | O & M charges for the Pappan Kalan STP and Associated Infrastructure. | 132 | Months | 1,77,94,66,227 ₹1,77,94,66,227 | 1,49,53,49,771.52 ₹1,49,53,49,771.52 Lowest |
| 1.04 | Gaurantee Energy Consumption for Pappan Kalan STP for Treatment Purpose . Per MGD cost for BOD from 100mg/l and upto 150 mg/l . Gauranteed Energy Consumption for the Pappan Kalan STP(Note : - Bidder is required to quote the Gauranteed Energy Cosumption in kvah/MGD).The value shown is quantity is computed as :-(365*15 year X(Power Unit Rate)( 365*15*8.0) | 43,800 | kvah/MGD | 7,11,92,520 ₹7,11,92,520 | 6,33,94,806 ₹6,33,94,806 Lowest |
| 1.05 | Per MGD cost for BOD from 150mg/l and upto 200 mg/l | 43,800 | kvah/MGD | 7,20,97,428 ₹7,20,97,428 | 6,40,86,408 ₹6,40,86,408 Lowest |
| 1.06 | Per MGD cost for BOD from 200mg/l and upto 250 mg/l | 43,800 | kvah/MGD | 7,28,61,738 ₹7,28,61,738 | 6,45,93,612 ₹6,45,93,612 Lowest |
| 1.07 | Gaurantee Energy Consumption for Pappan Kalan STP associated Infrastructure(12*15*8) | 1,440 | kvah/Month | 81,56,160 ₹81,56,160 | 72,75,787.2 ₹72,75,787.2 Lowest |
| 1.08 | Augumentation/Up-gradation of existing capacity of 40 MGD Sewage Treatment Plant at Nilothi to achieveing treatment effluent parameter BOD/TSS<10 ppm/10 ppm along with operation and maintenance for 12 years. (Fixed @1.5 Crore per MGD) | 60 | MGD | 90,00,00,000 ₹90,00,00,000 Lowest | 90,00,00,000 ₹90,00,00,000 Lowest |
| 1.09 | Interim O& M Charges | 12 | Months | 62,94,13,906.56 ₹62,94,13,906.56 | 53,79,60,603.96 ₹53,79,60,603.96 Lowest |
| 1.10 | O & M charges for the first month for Nilothi STP and Associated Infrastructure. | 132 | Months | 2,79,50,20,295.76 ₹2,79,50,20,295.76 | 2,47,34,69,288.4 ₹2,47,34,69,288.4 Lowest |
Tender Value
₹465.3 Cr
EMD Value
₹2.7 Cr
Closing Date
29 Apr 2022, 3:00 pmClosed
EE(SDW)VIII
SEWAGE TREATMENT PLANT (WSTP), DWARKA SECTOR 16D.
Augmentation/ up-gradation of various existing STPs in Delhi (package-1)
2022_DJB_216643_1
Press NIT NO. 19 (2021-2022) EE(SDW)VIII
Open Tender
Miscellaneous Works
Works
4380 days
SEWAGE TREATMENT PLANT (WSTP), DWARKA SECTOR 16D.
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
As per NIT
₹2.7 Cr
Yes
CE(SDW)NW WSTP Keshopur New Delhi - 110018
17 May 2022
11 Feb 2022
29 Apr 2022
11 Feb 2022
29 Apr 2022
11 Feb 2022
25 Feb 2022
Augumentation/Up-gradation of existing capacity of 20 MGD Sewage Treatment Plant at Pappan Kalan Ph I to achieveing treatment effluent parameter BOD/TSS<10 ppm/10 ppm along with operation and maintenance for 12 years. (Fixed @1.5 Crore per MGD)
Interim O& M Charge
O & M charges for the Pappan Kalan STP and Associated Infrastructure.
Gaurantee Energy Consumption for Pappan Kalan STP for Treatment Purpose . Per MGD cost for BOD from 100mg/l and upto 150 mg/l . Gauranteed Energy Consumption for the Pappan Kalan STP(Note : - Bidder is required to quote the Gauranteed Energy Cosumption in kvah/MGD).The value shown is quantity is computed as :-(365*15 year X(Power Unit Rate)( 365*15*8.0)
Per MGD cost for BOD from 150mg/l and upto 200 mg/l
Per MGD cost for BOD from 200mg/l and upto 250 mg/l
Gaurantee Energy Consumption for Pappan Kalan STP associated Infrastructure(12*15*8)
Augumentation/Up-gradation of existing capacity of 40 MGD Sewage Treatment Plant at Nilothi to achieveing treatment effluent parameter BOD/TSS<10 ppm/10 ppm along with operation and maintenance for 12 years. (Fixed @1.5 Crore per MGD)
Interim O& M Charges
O & M charges for the first month for Nilothi STP and Associated Infrastructure.
Gaurantee Energy Consumption for Nilothi 40 MGD STP for Treatment Purpose . Per MGD cost for BOD from 100mg/l and upto 150 mg/l . Gauranteed Energy Consumption for the Narela MGD STP(Note : - Bidder is required to quote the Gauranteed Energu Cosumption in kwh/MGD).The value shown is quantity is computed as :-(Flow (MGD) In the STP)X365*15X(Power Unit Rate)( 365*15*8.0)
Per MGD cost for BOD from 150mg/l and upto 200 mg/l
Per MGD cost for BOD from 200mg/l and upto 250 mg/l
Gaurantee Energy Consumption for Narela 15 MGD STP associated Infrastructure
AYYAPPA INFRA PROJECTS PVT.LTD
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.08 MB
BOQ_278421.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .