Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹4.2 LAdmitted-Finance | -15.50% | ₹4.2 L | H1 | Admitted-Finance |
| 2 | H2₹4.2 L−₹5,009.43 (1.18%)Admitted-Finance | -16.50% | ₹4.2 L−₹5,009.43 (1.18%) | H2 | Admitted-Finance |
| 3 | H3₹3.9 L−₹29,405.36 (6.95%)Admitted-Finance | -21.37% | ₹3.9 L−₹29,405.36 (6.95%) | H3 | Admitted-Finance |
| 4 | H4₹3.7 L−₹48,341 (11.4%)Admitted-Finance | -25.15% | ₹3.7 L−₹48,341 (11.4%) | H4 | Admitted-Finance |
| 5 | H5₹3.6 L−₹64,471.37 (15.2%)Admitted-Finance | -28.37% | ₹3.6 L−₹64,471.37 (15.2%) | H5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
4 May 2026, 6:00 pmClosed
Executive Engineer ED Budgam KPDCL
ED Budgam, KPDCL
Augmentation of 250 KVA Transformer at Sofi Mohalla Checkpora Kalan BK Pora under the jurisdiction of Electric Division Budgam KPDCL.
2026_PDD_308136_1
05 of 2026-27
Open Tender
Electrical and Maintenance Works
Percentage
30 days
ED Budgam, KPDCL
AS PER SBD
7 documents required · 7 mandatory
₹200
Executive Engineer ED Budgam KPDCL
₹10,000
6 May 2026
18 Apr 2026
5 May 2026
18 Apr 2026
4 May 2026
20 Apr 2026
18 Apr 2026 - 20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Supply, installation, testing and commisioning of 200 kVA ,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV
Cable Box having detachable Aluminium Gland plate 11/0.433KV, 3-phase(EE Level-II) complete in all respect as per Standards.. | 1 | No. | - | - |
| 2.01 | Supply, installation, testing and commisioning of 8 mtr(410 SP-15) long Steel Tubular Poles complete with base plate(350x350x5mm), top cap, Earthing Channel(75x40x6mm) positioning etc, complete in all respect as per Standards. | 1 | No. | - | - |
| 3.01 | Supply, laying, stringing, tensioning, binding of 50 Sqmm ACSR Conductor complete in all respects as per standards. | - | KM | - | - |
| 4.01 | Supply,Carraige upto site, fixing and installation of GI Channels /Angle /Flat of different sizes including clamps and braces. | 200 | Kg | - | - |
| 5.01 | Supply, Carraige upto site, installation, testing and Commissioning of 11 kV G.O AB Switch 3-phase, 3 pole 200-Amp, vertical Type with fittings complete in all respects as per standards. | 1 | Set | - | - |
| 6.01 | LT Fuse set comprising of requisite aluminium bus bar mounted on LT polymer insulator assembled on galvanized channel iron frame including necessary clamps
(Drawing no. CE/P&P/DRG/2023/LTFS/001) | 1 | Set | - | - |
| 7.01 | Supply, Carraige upto site, laying, stringing, tensioning, binding of 240mm² (1Ckt )1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type cable complete in all respects as per standards. | 55 | Mtr | - | - |
| 8.01 | Supply,Carraige upto site, fixing of Aluminium Thimbles of size 185 Sqmm. | 4 | No. | - | - |
| 9.01 | Supply,Carraige upto site, fixing and Commissioning of Aluminium Solderless Clamps of size 185 Sqmm. | 12 | No. | - | - |
| 10.01 | Earthing of substation-Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 25 mmx3 mm, for connection of transformer body,G.O set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover complete in all respects as per standards. | 1 | Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 1.68 MB
BOQ_998947.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .