| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC L1 |
Tender Value
₹6.5 L
EMD Value
₹6,500
Closing Date
5 Mar 2024, 3:00 pmClosed
Executive Officer, Chettiyarpatti Town Panchayat
108, Naidu North Street, Chettiyarpatti Town Panchayat
Construction of Storm water Drainage at ward no 10 Kasiraja nadar street in Chettiyarpatti Town panchayat
2024_DTP_435939_1
22-1/2024 15th IInd Untied
Open Tender
Civil Works
Works
90 days
Chettiyarpatti
Clsss II
2 documents required · 2 mandatory
₹6,500
₹6,500
Yes
26 Mar 2024
2 Mar 2024
5 Mar 2024
2 Mar 2024
5 Mar 2024
2 Mar 2024
Amount
Earth work excavation and depositing on the bank with initial lead and lift of 10 metres and initial lift of 2 metres in hard stiff stiff clay stiff block cotton hard red earth murram, gravel stoney earth and earth mixed with small size boulders and hard gravelly soils (SS 20 B) etc., complete as per standard specification - 1m3 For Drainage
Plain Cement Concrete 1:4:8 (One Part of cement, Four Part of sand, and Eight Part of Aggregate) mix using 40mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete to site and other incidental charges etc., complete. as per standard specification 28 V,VI S25
Steel shuttering with MS Sheets and MS angels including fixing in position with country wood scantlings for drain side walls including cost and conveyance of all materials and all labour charges to site and other incidental charges etc., complete. asper standard specification 86K, 86A
Vibrated Plain Cement Concrete 1:2:4 (One Part of cement, Two Part of sand, Four Part of Aggregate) mix using 20mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete to site and other incidental charges etc., complete. as per standard specification 28 V,VI S25
Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.
Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3.
Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.(Using Vibrator) TNDSS NO: 30 V, VI (S3), VII-3.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_518413.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .