| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical LATEHAR | LATEHAR | JHARKHAND | 822111 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹57.5 L
EMD Value
₹1.2 L
Closing Date
2 Sept 2023, 3:00 pmClosed
Nodal Officer
e-Procurement Cell, Office of the Superintending Engineer, Building Construction Department, Circle- 2, Ranchi-834001
Construction of Fencing, Gate and Sitting Benches at Naspati Bagan, Neterhat, Jharkhand.
2023_BCD_75162_1
19/BCD/CIR-2/LATEHAR /2023-24
Open Tender
Civil Works - Buildings
Works
150 days
Latehar
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
EE, BCD, Building Division, Latehar
₹1.2 L
Yes
11 Sept 2023
28 Aug 2023
4 Sept 2023
28 Aug 2023
2 Sept 2023
28 Aug 2023
Amount
Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item - A0 and disposal of excavated earth as obtained to a distance upto 50M including all lifts levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of E/I.
Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B)
Providing coarse clean Sand in Filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:1.5:3 (1 Cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete
Suspended floors, roofs, landings, balconies and access platform
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
Carriage of material
Sand - 6 +2 km
Chips - 5 Km
FILLING IN FOUNDATION TRENCHES AND PLINTH in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level.
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size)
Providing T.M.T. Reinforcement of following dia Rods as per approved design and drawing including carriage of M.S. Rods of (Straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire removal of rust placing the rods in position all complete as per building specification and direction and direction of E/I.
Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/l.
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:
New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Providing two coats of synthetic enamel paint of approved shade and make over steel surface including cleaning the surface thoroughly, scaffolding and taxes all complete as per building specification and direciton of E/l
Cost of RCC Bench Gokuls lables bearing-type of material and brand name manufactureu's name precast concrete reinforced bench (Each Bench Cost Rs. 9322.03)
Add 18 % GST (in Basic Rate must fill 12)
Add 1% Labour Cess (in Basic Rate must fill 1)
ARVIND DUBEY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .