| 1 | L1₹11.4 CrAccepted-AOC | ₹11.4 Cr Quoted ₹12.1 Cr | L1 | Accepted-AOC ok |
| 2 | L2₹13.9 Cr+₹1.8 Cr (14.9%)Rejected-Finance 411 URBAN ESTATE SECTOR 8 PART 2 KARNAL KARNAL HARYANA 132001 KARNAL HARYANA 132001 | KARNAL | HARYANA | 132001 | ₹13.9 Cr+₹1.8 Cr (14.9%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | sk,mittal L1 | Ram Narain Jain Contractor L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in open cutting by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms including removal of water (from seepage and all other sources etc.), slush and wet earth to give a dry bed, including construction and removal of earthfilled cement bags bandh (minimum bandh cross section = 1.5 x 1 m (height and L=6812m approx.)) where ever necessary including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 5,200 | Metre | 1,000 ₹52,00,000 Lowest | 2,439 ₹1,26,82,800 |
| 2.00 | Earth filling for making pathways (6 paths - 10 m wide and 58 m average length each) x bandh areas including watering, loading unloading and carriage of good earth from a lead of 5 km. | 1,590 | cum | 300 ₹4,77,000 | 230 ₹3,65,700 Lowest |
| 3.00 | For Jointing (1: 1 ½) RCC NP3 1800 mm pipe | 1,914 | Each | 1,000 ₹19,14,000 | 108 ₹2,06,712 Lowest |
| 4.00 | Soil Investigation, checking SBC, designing drawing (Auto Cad ) and other misc. items | 8 | Job | 1,25,000 ₹10,00,000 | 75,000 ₹6,00,000 Lowest |
| 5.00 | Boring providing and installing board cast-in-situ reinforced cement concrete pile of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of concrete and steel reinforcement (The rates of concrete and steel reinforcement are to be taken for respective item of chapter No.10 and 18 respectively ) but including the cost of boring with manual auger (without bentonite solution ) and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all compete as pr BIS specifications/ codes including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured up to bottom of pile cap) Extra for providing under reamed bulb as per BIS specifications/ codes. Extra for using bentonite slurry with Bentonite pump in case of unstable bore boring and drilling of pile complete in all respect.. | 480 | NO. | 12,000 ₹57,60,000 | 2,046 ₹9,82,080 Lowest |
Tender Value
₹12.9 Cr
EMD Value
₹25.9 L
Closing Date
14 May 2026, 6:55 pmClosed
NITIN KADIAN
Municipal Corporation Faridabad
Providing and laying of 1800mm master sewer line along Agra Canal from Khedi Pul to STP Mirzapur (Recall)
2026_HRY_517020_1
20261A20523B F3AE 4B5B 890A 569EAABF5FE6284ULB
Open Tender
Civil Works
Works
365 days
Faridabad (MC)
2 documents required · 2 mandatory
₹20,000
₹25.9 L
Yes
9 Jul 2026
23 Apr 2026
15 May 2026
23 Apr 2026
14 May 2026
23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in open cutting by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms including removal of water (from seepage and all other sources etc.), slush and wet earth to give a dry bed, including construction and removal of earthfilled cement bags bandh (minimum bandh cross section = 1.5 x 1 m (height and L=6812m approx.)) where ever necessary including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | Metre | - | - |
| 2 | Earth filling for making pathways (6 paths - 10 m wide and 58 m average length each) x bandh areas including watering, loading unloading and carriage of good earth from a lead of 5 km. | - | cum | - | - |
| 3 | For Jointing (1: 1 ½) RCC NP3 1800 mm pipe | - | Each | - | - |
| 4 | Soil Investigation, checking SBC, designing drawing (Auto Cad ) and other misc. items | - | Job | - | - |
| 5 | Boring providing and installing board cast-in-situ reinforced cement concrete pile of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of concrete and steel reinforcement (The rates of concrete and steel reinforcement are to be taken for respective item of chapter No.10 and 18 respectively ) but including the cost of boring with manual auger (without bentonite solution ) and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all compete as pr BIS specifications/ codes including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured up to bottom of pile cap) Extra for providing under reamed bulb as per BIS specifications/ codes. Extra for using bentonite slurry with Bentonite pump in case of unstable bore boring and drilling of pile complete in all respect.. | - | NO. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_595887.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .