Tender Value
₹3.1 Cr
EMD Value
₹3.2 L
Closing Date
30 Mar 2022, 3:00 pmClosed
Project Director, DRDA, Virudhunagar
DRDA, Collectorate, Virudhunagar
Construction of High Level Bridge at Meenakshipuram to Vedanayagapuram road in Rajapalayam Block of Virudhunagar District under NABARD RIDF-XXVII-2021-22-Tranche
2022_RDTN_223983_1
DIPR/751/Tender/2022
Open Tender
Civil Works - Bridges
Works
365 days
Rajapalayam Block
Two cover system. Refer tender document.
5 documents required · 5 mandatory
₹0
₹3.2 L
DRDA, Collectorate, Virudhunagar
16 Jun 2022
4 Mar 2022
30 Mar 2022
4 Mar 2022
30 Mar 2022
18 Mar 2022
18 Mar 2022
Amount
Earth work excavation in soft rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for dressing the bed upto sill level.
Earth work excavation in soft disintegrated rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Foundation of abutments, piers and wings.
Vibrated Cement Concrete of grade M 15 Nominal Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For levelling course, below abutments, piers footing.
Vibrated Reinforced cement concete of Grade M35 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For Footing under abutment, Wing wall & piers below sill level
Vibrated Reinforced cement concete of Grade M35 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For substructure of abutment and Wings below sill level
Vibrated Reinforced cement concete of Grade M35 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For structure of abutment and Wings above sill level
Vibrated Reinforced cement concete of Grade M35 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For Circular column pier below sill level
Vibrated Reinforced cement concete of Grade M35 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For Circular column pier above sill level
Vibrated Reinforced cement concete of Grade M35 (Design mix) using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For RCC capping beam above column pier
Vibrated Reinforced cement concete of Grade M35 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For Dirt wall cum bed block over abutments and bed block over piers.
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill in between the abutments and returns.
Providing and fixing Kraft paper for full width of seating of deck slab including cost and conveyance to work site labour for fixing the same in correct position and all other incidental charges et.c, complete.
Vibrated Reinforced cement concete of Grade M35 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For Deck slab
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Filling behind Abutment and Wings with clean gritty gravel of Ø value not less than 350 including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete as per standard specifications.
Providing and fixing PVC EXPANSION JOINT in between Deck Slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including Shalimar pad and joint sealent etc,complete.
Vibrated Reinforced cement concete of Grade M15 using 20mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For base course below approach slab.
Vibrated Reinforced cement concete of Grade M35 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For approach slab
Vibrated cement concete of Grade M35 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For wearing coat of 75mm thickness over deck slab and approach slab
Vibrated Reinforced cement concete of Grade M40 (Design mix) using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For crash barrier
Vibrated cement concete of Grade M20 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For Parapet over wings
Supplying and fixing Cast iron Drainage Spouts 100 mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements and 100 mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc.,
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 2008, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
Approach Road
Excavation for Road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per Technical Specification Clause 302.3
98% Compaction
100% Compaction
Construction of gravel/soil-aggregate base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 401 Grading III (GSB)
Providing,laying,spraeding & compacting stone aggregates of specific sizes to water bound mecadam specification including spreading uniform thickness, hnd packing, rolling with three wheel 80 - 100 KN static roller in stages o proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per technical specification clause 405 ( Grading II )
Providing,laying,spraeding & compacting stone aggregates of specific sizes to water bound mecadam specification including spreading uniform thickness, hnd packing, rolling with three wheel 80 - 100 KN static roller in stages o proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per technical specification clause 405 ( Grading III )
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.4 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing and laying premix carpet of 20 mm compacted thick using 0.18 cum of 13.20 mm IRC size HBG machine crushed chips and 0.09 cum of 11.20 mm IRC HBG machine crushed chips with 14.60 kg of Bitumen for 10 sqm of premix carpet including laying of seal coat type A over the permix carpet using 0.09 cum of 6.7 mm IRC size HBG machine crushed chips with 9.80kg of Bitumen per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for premeasurements including cost of bitumen which will be recovered as per special condition appended including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant power roller 80 - 100 KN capacity and all incidental charges etc completed.
Diversion Road
Excavation for Road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per Technical Specification Clause 302.3
98% Compaction
Construction of gravel/soil-aggregate base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 401 Grading III (GSB)
Providing,laying,spraeding & compacting stone aggregates of specific sizes to water bound mecadam specification including spreading uniform thickness, hnd packing, rolling with three wheel 80 - 100 KN static roller in stages o proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per technical specification clause 405 ( Grading II )
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Retaining Wall - PCC
Earth work excavation in all calsses of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation under retaining wall.
Vibrated Cement Concrete of grade M 15 Nominal Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For levelling course.
Vibrated cement concete of Grade M20 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For footing
Vibrated cement concete of Grade M20 (Design Mix) using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For stem of retaining wall
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill in between the abutments and returns.
Retaining Wall - RCC
Earth work excavation in all calsses of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation under retaining wall.
Vibrated Cement Concrete of grade M 15 Nominal Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For levelling course.
Vibrated Reinforced cement concete of Grade M35 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For footing
Vibrated Reinforced cement concete of Grade M35 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For stem of retaining wall
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill in between the abutments and returns.
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 2008, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
Apron
Earth work excavation in all calsses of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation for regid apron
Vibrated Cement Concrete of grade M 15 Nominal Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications.For regid apron
Vibrated cement concete of Grade M20 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For regid apron
Vibrated cement concete of Grade M20 using 20mm, 12mm ISS Graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For cut off wall
Supply and fixing of Sign board as per departmental specifications
Supply and fixing of Name board as per departmental specifications
Supply and fixing of Reflectors as per departmental specifications
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
LAKSHMI CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .