Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | ₹16.0 L | L1 | Accepted-AOC Accept |
| 2 | L2₹16.2 L+₹18,187.26 (1.14%)Rejected-AOC | ₹16.2 L+₹18,187.26 (1.14%) | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | BSA ASSOCIATES L1 | SRI PUGAZH CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged Cement mortar brick work as per the instruction of Departmental officers. | 1 | m3 | 330 ₹330 Lowest | 333.26 ₹333.26 |
| 2.00 | Dismantling the damaged Cement Concrete flooring as per the instruction of Departmental officers. | 1 | m3 | 570 ₹570 Lowest | 570 ₹570 Lowest |
| 3.00 | Providing Pile Foundation of size 300mm dia using augur including labour charges and all other tools and plants charges etc., as per direction of departmental officers | 68 | m | 310 ₹21,080 | 300 ₹20,400 Lowest |
| 4.00 | Brick work in cement mortor 1:5 mix (one cement,five sand) using II class table moulded bricks to a size of 9"x4 3/8"x2 3/4" including cost and conveyance of all materials and labour charges for mixing the mortor, constructing, curing to required period and wherever the masonry projection is necessary for elevation shall be done with out extra cost etc complete as per std spn.upto basement | 15 | m3 | 8,500 ₹1,27,500 | 7,460 ₹1,11,900 Lowest |
| 5.00 | Earth work excavation in all soils and Sub Soils with initial lead and lift including all Labour Charges as per the Direction of the Departmental officers etc. complete. | 9 | m3 | 219 ₹1,971 Lowest | 219 ₹1,971 Lowest |
| 6.00 | Cement concrete 1:4:8 mix, using 40mm HBG jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete | 5 | m3 | 5,990 ₹29,950 | 5,780 ₹28,900 Lowest |
| 7.00 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification | 17.5 | Qtl | 9,600 ₹1,68,000 | 9,340 ₹1,63,450 Lowest |
| 8.00 | Cement Concrete 1:2:4, one part of cement, two parts of m.sand , four parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., | 17 | m3 | 7,265 ₹1,23,505 | 7,166 ₹1,21,822 Lowest |
| 9.00 | Providing centering using M.S.Sheet sides and soffits for R.C.C column raising including all cost and conveyance etc complete | 240 | m3 | 1,480 ₹3,55,200 | 1,407 ₹3,37,680 Lowest |
| 10.00 | Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 13.4 | m3 | 9,800 ₹1,31,320 | 8,850 ₹1,18,590 Lowest |
Tender Value
₹20.5 L
EMD Value
₹20,500
Closing Date
9 Jun 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Improvement works to the Amma Unavagam at Maniyakaranpalayam in ward no.19, North Zone.
2026_MAWS_678404_6
e35/2026 (Amma unavagam)
Open Tender
Civil Works
Works
60 days
Coimbatore corporation
As Per Tender Document
4 documents required · 4 mandatory
₹0
₹20,500
25 Aug 2026
27 May 2026
10 Jun 2026
27 May 2026
9 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the damaged Cement mortar brick work as per the instruction of Departmental officers. | 1 | m3 | - | - |
| 2 | Dismantling the damaged Cement Concrete flooring as per the instruction of Departmental officers. | 1 | m3 | - | - |
| 3 | Providing Pile Foundation of size 300mm dia using augur including labour charges and all other tools and plants charges etc., as per direction of departmental officers | 68 | m | - | - |
| 4 | Brick work in cement mortor 1:5 mix (one cement,five sand) using II class table moulded bricks to a size of 9"x4 3/8"x2 3/4" including cost and conveyance of all materials and labour charges for mixing the mortor, constructing, curing to required period and wherever the masonry projection is necessary for elevation shall be done with out extra cost etc complete as per std spn.upto basement | 15 | m3 | - | - |
| 5 | Earth work excavation in all soils and Sub Soils with initial lead and lift including all Labour Charges as per the Direction of the Departmental officers etc. complete. | 9 | m3 | - | - |
| 6 | Cement concrete 1:4:8 mix, using 40mm HBG jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete | 5 | m3 | - | - |
| 7 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification | 17.5 | Qtl | - | - |
| 8 | Cement Concrete 1:2:4, one part of cement, two parts of m.sand , four parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., | 17 | m3 | - | - |
| 9 | Providing centering using M.S.Sheet sides and soffits for R.C.C column raising including all cost and conveyance etc complete | 240 | m3 | - | - |
| 10 | Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 13.4 | m3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_815068.xls
BOQ • 0.35 MB
TenderDocumentSingle.pdf
Tender Documents • 0.92 MB
ITB.pdf
Additional Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .