Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 7A 7B GOVIND NAGAR GOPALPURA BYEPASS ROAD JAIPUR RAJASTHAN 302021 | JAIPUR | RAJASTHAN | 302021 | Admitted-Finance |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
11 Jan 2023, 6:00 pmClosed
COMMISSIONER
MUNICIPAL COUNCIL SIKAR
Dismantaling and reinstalation work medical gas pipe line, aluminium work, AC/Ductable split AC/AHU work in S. Kalyan Govt. hospital (Janana Hospital)
2022_DLB_311225_32
2022ENIB12
Open Tender
Civil Works
Percentage
120 days
MUNICIPAL COUNCIL SIKAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
COMMISSIONER, MD RISL
₹40,000
Yes
23 Jan 2023
29 Dec 2022
13 Jan 2023
29 Dec 2022
11 Jan 2023
29 Dec 2022
Hospital Work
MEDICAL GAS UNITS (GAS OUTLET POINTS) TERMINAL The Medical gas outlets shall confirm to NFPA99 standards. Front Loading Type Terminal Outlets should be designed to dispense medical gases (or an inlet for medical vacuum) to the secondary equipment (flow meters, Suction regulators, etc.) at the point of use and is gas specific so that secondary devices cannot be “attached” to the wrong gas. When not in use the gas in a non-flowing state within the Outlet (Terminal unit) sealed by “O” ring. The adapter when inserted pushes the poppet inside and the gas starts flowing and sealing is ensured by the “O” ring or a seat. The Outlets are Quick Connect Type and gas specificity is accomplished by "Pin indexing/Geometric indexing." The outlets should have following features: Push to insert or twist-to-release mechanism for probes. Allows plugging of probes from front. Self-sealing valve on disengaging the probe (Quick disconnect) Smooth quite action. Non return valve for on line servicing/ repairing Indexed to eliminate inter-changeability of gas services Color-coded gas specific front plate Totally leak proof, safe & easy to operate Configurations possible: surface, flush & Bead-head All outlets should have respective labels (i.e.O2/N2O/CO2/Air4/Air7/Vacuum/ AGSS/etc.) displayed accordingly.
Valve box Made of CRCA sheet duly powder coated with transparent window which is installed in the MGPS for oxygen and vaccum line and should comply with ENIS0521 l:2001 complete with ball type valves and gauses as required for oxygen. CE mark
Pipeline MaterialsThe Pipeline Design and Size must take care of following parameters for all gas services in this MGPS Installation. Desired flow rate The Diversity Factor The allowable friction loss for all positive pressure gases including Oxygen, Nitrous Oxide, Medical Air 4 & Carbon Dioxide will be Nil. The Equivalent Length of Piping will be derived by adding 50% of the measured run to account for bends, fittings, etc. free nitrogen with terminal flow rate of 2 litres per minute. Pipeline Layout Drawings :-The drawings as provided are indicative of Pipe Line Routes. All bidders are expected to visit the site and prepare their bids based on actual site conditions.Pipe Size. The following pipe specifications are mandated as per EN 13348. Wall Thickness Tolerance shall be ± 10% for tubes upto Outer Diameter of 54 mm and ± 15% for tubes upto Outer Diameter of 76 mm and 108 mm Outer diameter 12mm and wall thickness 0.7mm
Pipeline MaterialsThe Pipeline Design and Size must take care of following parameters for all gas services in this MGPS Installation. Desired flow rate The Diversity Factor The allowable friction loss for all positive pressure gases including Oxygen, Nitrous Oxide, Medical Air 4 & Carbon Dioxide will be Nil. The Equivalent Length of Piping will be derived by adding 50% of the measured run to account for bends, fittings, etc. free nitrogen with terminal flow rate of 2 litres per minute. Pipeline Layout Drawings :-The drawings as provided are indicative of Pipe Line Routes. All bidders are expected to visit the site and prepare their bids based on actual site conditions.Pipe Size. The following pipe specifications are mandated as per EN 13348. Wall Thickness Tolerance shall be ± 10% for tubes upto Outer Diameter of 54 mm and ± 15% for tubes upto Outer Diameter of 76 mm and 108 mm Outer diameter 15mm and wall thickness 0.9mm
Pipeline MaterialsThe Pipeline Design and Size must take care of following parameters for all gas services in this MGPS Installation. Desired flow rate The Diversity Factor The allowable friction loss for all positive pressure gases including Oxygen, Nitrous Oxide, Medical Air 4 & Carbon Dioxide will be Nil. The Equivalent Length of Piping will be derived by adding 50% of the measured run to account for bends, fittings, etc. free nitrogen with terminal flow rate of 2 litres per minute. Pipeline Layout Drawings :-The drawings as provided are indicative of Pipe Line Routes. All bidders are expected to visit the site and prepare their bids based on actual site conditions.Pipe Size. The following pipe specifications are mandated as per EN 13348. Wall Thickness Tolerance shall be ± 10% for tubes upto Outer Diameter of 54 mm and ± 15% for tubes upto Outer Diameter of 76 mm and 108 mm Outer diameter 22mm and wall thickness 0.9mm
Pipeline MaterialsThe Pipeline Design and Size must take care of following parameters for all gas services in this MGPS Installation. Desired flow rate The Diversity Factor The allowable friction loss for all positive pressure gases including Oxygen, Nitrous Oxide, Medical Air 4 & Carbon Dioxide will be Nil. The Equivalent Length of Piping will be derived by adding 50% of the measured run to account for bends, fittings, etc. free nitrogen with terminal flow rate of 2 litres per minute. Pipeline Layout Drawings :-The drawings as provided are indicative of Pipe Line Routes. All bidders are expected to visit the site and prepare their bids based on actual site conditions.Pipe Size. The following pipe specifications are mandated as per EN 13348. Wall Thickness Tolerance shall be ± 10% for tubes upto Outer Diameter of 54 mm and ± 15% for tubes upto Outer Diameter of 76 mm and 108 mm Outer diameter 28 mm and wall thickness 0.9mm
Pipeline MaterialsThe Pipeline Design and Size must take care of following parameters for all gas services in this MGPS Installation. Desired flow rate The Diversity Factor The allowable friction loss for all positive pressure gases including Oxygen, Nitrous Oxide, Medical Air 4 & Carbon Dioxide will be Nil. The Equivalent Length of Piping will be derived by adding 50% of the measured run to account for bends, fittings, etc. free nitrogen with terminal flow rate of 2 litres per minute. Pipeline Layout Drawings :-The drawings as provided are indicative of Pipe Line Routes. All bidders are expected to visit the site and prepare their bids based on actual site conditions.Pipe Size. The following pipe specifications are mandated as per EN 13348. Wall Thickness Tolerance shall be ± 10% for tubes upto Outer Diameter of 54 mm and ± 15% for tubes upto Outer Diameter of 76 mm and 108 mm Outer diameter 42mm and wall thickness 1.2 mm
Pipeline MaterialsThe Pipeline Design and Size must take care of following parameters for all gas services in this MGPS Installation. Desired flow rate The Diversity Factor The allowable friction loss for all positive pressure gases including Oxygen, Nitrous Oxide, Medical Air 4 & Carbon Dioxide will be Nil. The Equivalent Length of Piping will be derived by adding 50% of the measured run to account for bends, fittings, etc. free nitrogen with terminal flow rate of 2 litres per minute. Pipeline Layout Drawings :-The drawings as provided are indicative of Pipe Line Routes. All bidders are expected to visit the site and prepare their bids based on actual site conditions.Pipe Size. The following pipe specifications are mandated as per EN 13348. Wall Thickness Tolerance shall be ± 10% for tubes upto Outer Diameter of 54 mm and ± 15% for tubes upto Outer Diameter of 76 mm and 108 mm Outer diameter 54 mm and wall thickness 1.1 mm
Pipeline MaterialsThe Pipeline Design and Size must take care of following parameters for all gas services in this MGPS Installation. Desired flow rate The Diversity Factor The allowable friction loss for all positive pressure gases including Oxygen, Nitrous Oxide, Medical Air 4 & Carbon Dioxide will be Nil. The Equivalent Length of Piping will be derived by adding 50% of the measured run to account for bends, fittings, etc. free nitrogen with terminal flow rate of 2 litres per minute. Pipeline Layout Drawings :-The drawings as provided are indicative of Pipe Line Routes. All bidders are expected to visit the site and prepare their bids based on actual site conditions.Pipe Size. The following pipe specifications are mandated as per EN 13348. Wall Thickness Tolerance shall be ± 10% for tubes upto Outer Diameter of 54 mm and ± 15% for tubes upto Outer Diameter of 76 mm and 108 mm Outer diameter 76 mm and wall thickness 1.5 mm
OXYGEN FLOW METER WITH HUMIDIFIER. BPC Oxygen Flow Meter - Made from brass, chrome plated. It shall be back pressure compensated type having housing of Polycarbonate autoclavable reusable flow range 0-15 LPM. Fitted with matching adopter for oxygen outlet point and humidifier shall be compatible with flowmeter and reusable and as per specifications and as required. With suitable attachment steel adopter/prob. CE Mark Oxygen flow meters are used to control the flow-rate of Oxygen gas drawn from the central supply system or from a compressed gas cylinder. They are typically used in all types of wards, for adult, paediatric & neonates alike. They may also be used in other areas like anaesthesia administration stations and ambulances. This MGPS Installation will use “Ball and Pressure Dome” type flow meters. It shall provide a control knob to regulate gas flow control, within a range of 0 - 15 Litres per minute. The flow meter housing shall be powder coated Aluminium or Chrome plated Brass. The flow meter tube or Pressure dome shall be made from Polycarbonate. The Humidifier Bottle, Capacity 150 ml, will be re-usable type made of unbreakable polycarbonate material. It should be able to withstand autoclaving for its sterilisation. The procurement of Oxygen Flow Meters with Humidifier shall be as per the sample that is approved
MEDICAL GAS HOSES BPC Oxygen Flow Meter - Made from brass, chrome plated. It shall be back pressure compensated type having housing of Polycarbonate autoclavable reusable flow range 0-15 LPM. Fitted with matching adopter for oxygen outlet point and humidifier shall be compatible with flowmeter and reusable and as per specifications and as required. With suitable attachment steel adopter/prob. CE Mark Oxygen flow meters are used to control the flow-rate of Oxygen gas drawn from the central supply system or from a compressed gas cylinder. They are typically used in all types of wards, for adult, paediatric & neonates alike. They may also be used in other areas like anaesthesia administration stations and ambulances. This MGPS Installation will use “Ball and Pressure Dome” type flow meters. It shall provide a control knob to regulate gas flow control, within a range of 0 - 15 Litres per minute. The flow meter housing shall be powder coated Aluminium or Chrome plated Brass. The flow meter tube or Pressure dome shall be made from Polycarbonate. The Humidifier Bottle, Capacity 150 ml, will be re-usable type made of unbreakable polycarbonate material. It should be able to withstand autoclaving for its sterilisation. The procurement of Oxygen Flow Meters with Humidifier shall be as per the sample that is approved. rest as per given in attached detail in worsd file.
SPECIFICATIONS OF Fabrication Work- Aluminium/UPVC: Doors & Windows shall be of high quality of aluminium/UPVC sections.• Open Style- Sliding/Fixed.• Opening Pattern- Horizontal.• Surface Treatment- Powder Coated.
SPECIFICATIONS OF Antibacterial PVC Flooring (Gerflor/Jeoflor): Type Of Flooring- anti bacterial 2 mm thick homogeneous flooring.• Zero Gapping.•Self leveling (if required) shall be in bidders scope.
SPECIFICATIONS OF Split AC Work (Bluestar/Voltas/Dikan/equivalent: Adequate cooling shall be for the site.
SPECIFICATIONS OF Electrical and Plumbing Work: Work under this section consists of furnishing all labour, materials and appliances necessary and required to install and commission the water/Electrical supply systems. The work shall include but not limited to the following:• Water distribution system inside toilet blocks including supporting.•Valves in each riser and other ancillary items.•Connections to all plumbing fixtures etc.•Chasing of walls for pipes, making holes in walls/floors, making good the openings.•Materials shall be of the approved make & quality.•All equipment shall be complete with approved safety devices wherever a potential hazard to personnel exists and with provision for safe access of personnel to and around equipment for operation and maintenance functions.• Unless otherwise mentioned in the schedule of quantities, only single core PVC insulated / PVC insulated & sheathed cable consisting of multistrand / flexible copper conductor and of approved manufacturers conforming to relevant I.S. shall be used for wiring in conduit system.
SPECIFICATIONS OF PAINT WORK (ASIAN/NEROLAC/BERGER/INDIGO: Two Quotes Of Paint Must Be Apply On The Primer And putty Base. Preparation of all types of surfaces to be painted by removing all loose material / paint, dust, stain etc.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .