| 1 | L-1₹2.0 CrAccepted-Finance | ₹2.0 Cr | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹2.3 CrRejected-Finance ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | ₹2.3 Cr | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹2.4 CrRejected-Finance | ₹2.4 Cr | L-3 | Rejected-Finance L-3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical not coconfirming to clause 19(XI) |
| 5 | Rejected-Technical | - | - | Rejected-Technical not coconfirming to clause 19(XI) |
| Sl No | Description | Qty | Unit | rupendra kumar bhardwaj L1 | M/s Kanha Construction L2 | M/S PRABHAT TRADERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Brick on edge pavement with straight overbrunt brick on parties with bricks, laid dry joints filled with fine sand including prepartion of base to proper slope and its ramming, spreading layer of 1 cm.(3/8") depth of local sand over the sub-grade and including supply of all material labours, T&P. etc required for proper completion of the work. | 40,650 | Sqm | 439 ₹1,78,45,350 | 520 ₹2,11,38,000 | 520 ₹2,11,38,000 |
| 2.00 | E/W in closing cuts and Strenthening of Bank at Weaker Section of service Patri with Proper dressing and Mannual Compaction including Lead up to 195 m and Lift up to 1.5 m for Proper Completion of Work.including all T&P etc required proper completion of work. | 15,458.2 | CUM | 30 ₹4,63,746 | 30 ₹4,63,746 | 80 ₹12,36,656 |
| 3.00 | Laying C:C work in 1:3:6 including all cost of material, labour and T&P.etc required for proper completion of the work. | 86.4 | CUM | 4,000 ₹3,45,600 | 5,000 ₹4,32,000 | 8,500 ₹7,34,400 |
| 4.00 | Laying dry stone Pitiching 0.50 m thick on slope including all cost of material, labour and T&P.etc required for proper completion of the work. | 352 | CUM | 2,000 ₹7,04,000 | 2,300 ₹8,09,600 | 1,500 ₹5,28,000 |
| 5.00 | Supply & Filling of HDPE Woven bags Confirming to BIS No. 11652-2014 of cement bags size with local sand/ Local RBM in nylon crate including Machine sewing and placing in position within 60 mtr i/c cost of material labour, royalty, T&Petc required for proper completion of the work.. | 34,000 | Nos. | 15 ₹5,10,000 | 5 ₹1,70,000 | 15 ₹5,10,000 |
| 6.00 | Supply & fixing of information board including writing , material ,Labour etc completion of work | 2 | Nos. | 5,000 ₹10,000 | 500 ₹1,000 | 5,000 ₹10,000 |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
21 Feb 2026, 3:00 pmClosed
S.E. Drainage Circle, Aligarh
Office Of S.E.Drainage Circle. Aligarh
Construction of Kharanja work on Anoopshahar Branch from Km. 144.000 to Km. 145.600 and Km. 148.700 to Km.157.940 Under Jurisdiction of Aligarh Division Ganga Canal, Aligarh
2026_UPIDC_1108476_2
25/SE/DCA/2025-26
Open Tender
Civil Works - Canal
90 days
ALIGARH
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,837
₹5.8 L
7 Mar 2026
16 Feb 2026
21 Feb 2026
16 Feb 2026
21 Feb 2026
16 Feb 2026
Brick on edge pavement with straight overbrunt brick on parties with bricks, laid dry joints filled with fine sand including prepartion of base to proper slope and its ramming, spreading layer of 1 cm.(3/8") depth of local sand over the sub-grade and including supply of all material labours, T&P. etc required for proper completion of the work.
E/W in closing cuts and Strenthening of Bank at Weaker Section of service Patri with Proper dressing and Mannual Compaction including Lead up to 195 m and Lift up to 1.5 m for Proper Completion of Work.including all T&P etc required proper completion of work.
Laying C:C work in 1:3:6 including all cost of material, labour and T&P.etc required for proper completion of the work.
Laying dry stone Pitiching 0.50 m thick on slope including all cost of material, labour and T&P.etc required for proper completion of the work.
Supply & Filling of HDPE Woven bags Confirming to BIS No. 11652-2014 of cement bags size with local sand/ Local RBM in nylon crate including Machine sewing and placing in position within 60 mtr i/c cost of material labour, royalty, T&Petc required for proper completion of the work..
Supply & fixing of information board including writing , material ,Labour etc completion of work
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Tendernotice_2.pdf
PDF • 1.61 MB
BOQ_2071098.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid