Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹23.5 L+₹2.7 L (13.0%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹23.7 L+₹2.8 L (13.6%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
20 Nov 2023, 5:00 pmClosed
Superintending Engineer
EDC, Ayodhya
Giving Supply of I- Land for Infarstructure Guptarghat, Giving 425 KW Commerical Connection to Ayodhya Development Authority Connection Place back sie of Sulabh Sauchalay Near Yelo Zone office at Kaccha ghat for Electric Jalyaan Charging point Ayodhy
2023_MVVNL_862116_1
146 H(F)(W)/2023-24
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
As Per Tender Specification
2 documents required · 2 mandatory
₹3,540
Superintending Engineer, EDC
₹25,000
30 Nov 2023
14 Nov 2023
21 Nov 2023
14 Nov 2023
20 Nov 2023
14 Nov 2023
Amount
Carriage including loading,unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 20 Kms. (distance approx)
S.T. Pole 11 Mtr. long
11 KV XLPE Cable 3x120 sqmm
11 KV Out door Cable Jointing kit 3x120
11 KV Staight Through Cable Jointing kit 3x120
ACSR Weasel Conductor
ACSR DOG Conductor
Single Core XLPE insulated 3x120 for jumprng
11 KV Pilfer Proof Metring Cubical
11 KV TVM Meter
Other matching Materials
Dragging of ST Pole from dump site to pit site
Fabrication and Errection of Single Pole Support on ST/PCC Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Errection of Double Pole Support on ST/PCC Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Stringing, Sagging, Binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
Stringing, Sagging, Binding and jumpering of ACSR Dog Conductor as per RESSPO Norms
Grouting and Binding of Stay with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Laying of underground 11 KV 3x120 sq mm XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable)
Road Restoration Charge for Pakka Road Crossing by HDD (HORIZONTAL DRILL DIRECTION) Method by using suitable HDD Machine Complete in all Respect as per norms. (All the material will be supplied by the contractor .
Laying of 11 KV XLPE Cable 3x120 sqmm underground by HDD (HORIZONTAL DRILL DIRECTION) Method by using HDD Machine Complete in all Respect as per norms. (All the material will be supplied by the contractor .
Installation of Heat Shrinkable Type cable jointing kits Outdoor end Termination suitable for 11 KV XLPE cable 3x120 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 11 KV XLPE cable 3x185 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Hanginging of Cable 3x120 sqmm as per RESSPO Norms
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.)
Chemical Type Earthing (all the material will be supplied by the contractor.)
Installation of 11 KV Pilfer Proof Metring Cubical
Installation of 11 KV TVM Meter
Supply of G.I. Pipe 6'' Dia
M/s Shukla Enterprises
Hindustan Electric Work
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .