| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹5.2 L+₹20,098 (4.02%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.7 L+₹70,915 (14.2%)Rejected-Finance MIRZAPUR MUMTAZ NAGAR AYODHYA AYODHYA UTTAR PRADESH 224001 | AYODHYA | UTTAR PRADESH | 224001 | L3 | Rejected-Finance L3 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
16 Sept 2024, 5:00 pmClosed
Superintending Engineer
se edc ayodhya
Replacement/Installation of 33 and 11 KV CT/PT combined Metering unit of large and havy Consumers Parisar at ETD Ayodhya and Cartage of Single Phase Meter Under Electricity Distribution Circle, Ayodhya
2024_MVVNL_948891_2
68 H(F)(W)/2024-25
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, EDC
₹5,000
24 Sept 2024
9 Sept 2024
17 Sept 2024
9 Sept 2024
16 Sept 2024
9 Sept 2024
Amount
Cartage of 33/11 KV CT/PT Combined metering unit from the store center Faizabad or from any other store under jurisdiction ETD Ayodhya to the outside premises of consumer under the jurisdiction of Electricity Test Divison Ayodhya (Distance 0 to 30Km.) including the cost work of loading and unloading at the respective end.
Installation of 33/11 KV CT/PT Combined Metering unit to proper alignment direction on the double pole Structure at out the premises of consumer to avoid possibility of theft of energy under the jurisdiction of Electricity Test Divison Ayodhya including the cost of 2 Nos. M.S. channel of size 100x50x6 mm of length 2100 mm, 2 Nos. M.S. angle of Size 65x65x6 mm length 2100 mm 2 Nos., for supporting metering unit, 4 Nos. P.G. Clamps and required M S Clamp both with nut bolt and washer and other associated item such as M Seal, PVC tape etc. Required for proper Completion of work to all respect. Unit shall also be earthed by connecting the same with M S strip of size 1/8x1'' to Earth rod of size 20x2540 mm.
Dismantling and removal of damaged CT/PT combined metering units installed at the outside of premises of the consumers under the Jurisdiction of Electricity Test Divison Ayodhya or from any other Store (Distance 0 to 30 Km.) including the cost work of loading and unloading at the respective end.
Installation of New CT-PT combined metering unit in place of above damaged CT-PT metering units as per direction of JE Concerning including the cost of arrangement M Seal and PVC tap etc.
Cartage of 11 KV/110V Sub-Station PT from Store Center to Sub- Station. Including the cost of loading and Unloading at the respective end.
Installation of New 11 KV/110V Sub- Station PT at Sub-Station in Place of Damage PT
Dismantling and removal of damaged Sub-Station PT Installed at respective Sub-Station under the Jurisdiction of ETD, Ayodhya. Including cost of loading and Unloading at respective end.
Safe loading and Unloading of Single Phase Meter.
Carraige of Single Phase Meter from Store Center Darshan Nagar to (AE Meter) IIIrd Milkipur, Office.
PRITHVI ENTERPRISES
Hindustan Electric Work
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .