Block Development Officer (B.Pt)
BDO Office Kodavasal Block
Repairs to PUE School building and Toilet at Killiyur Panchayat in Kodavasal block Tiruvarur District Under the Scheme of SIDS - 2022-23 - Package No 1
2023_RDTN_357709_1
1221/2023/A2/16.08.23
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kodavasal Block
As Per Tender Document
3 documents required · 3 mandatory
₹0
₹5,825
BDO Office Kodavasal Block
24 Aug 2023
17 Aug 2023
23 Aug 2023
17 Aug 2023
23 Aug 2023
17 Aug 2023
22 Aug 2023
Amount
1. Repairs to PUE School North Facing at Killiyur in Killiyur Panchayat
Dismandling the existing damaged plastered surface and clearaway the debreases all charges etc complete
Dismandling the existing damaged Ceiling plastered surface and clearaway the debreases all charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Dismandling the existing damaged flooring concrete clearaway the debreases all charges etc complete
Providing Granolithic Flooring including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering Two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Blackboard Painting two coats over old cement plastering surface with best approved best quality of black board paint of approved colour over the existing priming coat etc., completed
Towards cost of Provision for Bala Painting including cost of painting materials and all labour charges etc complete
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC Light point SD 21
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC plug point SD 37
Supply and fixing of CFL Blub with guard ( Philips / Bajaj / Crompton / K Lite ) suitable for incandescent lamp with 60 W bulb.SD 80
Supply and fixing of Tube light Fittings SD 89
Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 112
Provision for Repair to Window and Door
Window
Provision for Name board
2. Repairs to PUE School East Facing at Killiyur in Killiyur Panchayat
Dismandling the existing damaged plastered surface and clearaway the debreases all charges etc complete
Dismandling the existing damaged Ceiling plastered surface and clearaway the debreases all charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Dismandling the existing damaged flooring concrete clearaway the debreases all charges etc complete
Providing Granolithic Flooring including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering Two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Blackboard Painting two coats over old cement plastering surface with best approved best quality of black board paint of approved colour over the existing priming coat etc., completed
Towards cost of Provision for Bala Painting including cost of painting materials and all labour charges etc complete
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC Light point SD 21
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC plug point SD 37
Supply and fixing of CFL Blub with guard ( Philips / Bajaj / Crompton / K Lite ) suitable for incandescent lamp with 60 W bulb.SD 80
Supply and fixing of Tube light Fittings SD 89
Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 112
Provision for Repair to Window and Door
Window
Provision for Name board
3. Repairs to PUE School Toilet East Facing at Killiyur in Killiyur Panchayat
Dismandling the existing damaged plastered surface and clearaway the debreases all charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Paving the floor with ceromic tiles including cost of materils and all labour charges etc., completed
Distembering Two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Provision for Septic Tank Work
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,
Supplying and erecting centering for sides h soffits including supports and strutting up to 3.29m height for plane surfaces in all floors with all cross bracing using mild steel sheets of size 90cm x 60cm and 10 gauge stiffened welded with mild steel an gies of size 25mm x 25mm x 3 mm for boarding laid over country wood poists of size 1Ocm x 6.5cm dia spaced at about 90cm center to center etc., complete complying with std. Specifications
RCC 1: 1 1/2:3 mix using 20 mm ISS HBG metal for RCC items of works excluding cost of reinforcement a rid fabricating charges and centering and shuttering charges but including curing providing fixtures like fan clamps in the RCC floor or roof level wherever neccessary and bearing surfaces of walls, sides and bottom of sla b, beams etc., complete
Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x23/4" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Supply and Fixing of Manhole covers including all charges
Provision for Name board
4. Repairs to PUE School Toilet South Facing at Killiyur in Killiyur Panchayat
Dismandling the existing damaged plastered surface and clearaway the debreases all charges etc complete
Dismandling the existing damaged Ceiling plastered surface and clearaway the debreases all charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering Two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Repairs to Door
Provision for Name board
5. Repairs to PUE School Urinal North Facing at Killiyur in Killiyur Panchayat
Dismandling the existing damaged plastered surface and clearaway the debreases all charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Repairs to Door
Provision for 900 mm dia Rings and Covers
Rings
Covers
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M/s. VP Infra Projects
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .