Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.6 LAccepted-AOC RZ A2 2 CHANAKYA PLACE PART I OPP C 1A BLOCK JANAK PURI NEW DELHI 110059 | NEW DELHI | WEST DELHI | DELHI | 110059 | L1 | Accepted-AOC Lowest tenderer | |
| 2 | L2₹47.7 L+₹11.7 L (32.6%)Rejected-Finance 205 PARSHAV VIHAR PLOT NO 50 1 P EXTN PATPARGANJ DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | L2 | Rejected-Finance Not the lowest tender | |
| 3 | L3₹48.7 L+₹12.7 L (35.4%)Rejected-Finance WZ 409 0 B 1ST FLOOR PLOT NO 12 JANAK PARK HARI NAGAR NEW DELHI 110064 | NEW DELHI | WEST DELHI | DELHI | 110064 | L3 | Rejected-Finance Not the lowest tender | |
| 4 | Rejected-Technical 403 GH MANSADEVI COMPLEX PANCHKULA 134109 HARYANA | PANCHKULA | HARYANA | 134109 | - | Rejected-Technical MOU not submitted | |
| 5 | Rejected-Technical | - | Rejected-Technical Not enlisted in Cat c(v), MOU not submitted, Propritor of firm banned due to diciplinary action |
Tender Value
₹48.7 L
EMD Value
₹97,400
Closing Date
16 Dec 2019, 6:00 pmClosed
GE E/M BASE HOSP DELHI CANTT
GE E/M BASE HOSP DELHI CANTT
REP/REPLACEMENT OF UNSV SPARES OF DRYING TUMBLER-60KG, WASHRER EXTRACTOR-120KG, FLAT BED PRESS, GEN UTILITY PRESS, FLAT WORK IRONER AND COMPRESSOR OVERHAULING AT MECHANICAL LAUNDARY PLANT AND REP/MAINT OF COLD CHAMBERS AT MAIN MEDICAL STORE AT BASE H
2019_MES_299337_1
GE/BH-44/2019-20
Open Tender
Electrical and Maintenance Works
Item Rate
334 days
GE E/M BASE HOSP DELHI CANTT
Meeting enlistment criteria of MES with regard to having satisfactory completed requisite value works annual turnover, working capital, fixed assets. No recovery outstanding in any govt dept security clearance etc.
7 documents required · 7 mandatory
₹500
GE E/M BASE HOSP DELHI CANTT
₹97,400
Yes
7 Feb 2020
20 Nov 2019
18 Dec 2019
20 Nov 2019
16 Dec 2019
2 Dec 2019
Amount
Disconnecting electric/Steam connection of Drying Tumbler 60 kg capacity/ Dry Cleaning Machine, Make- fabcare from press to carry out day to day/ breakdown maintenance of the press and remove all dust and sand particles, providing oil and grease to all moving parts including greasing of motors bearings etc checking all loose electrical connections and tightening all electrical connection with thimble and commissioning after refixing it at original position and put equipment in fully functional conditions all as specified and directed by Engr-in-Charge. Note :- All major spares and material required to fix in General Utility Press for put it functional will provide against respective items.
Taking down of unserviceable spare parts of Drying Tumbler- 60Kg capacity, Make- FABCARE, comprising, dismantling of the equipments using adequate labour and T&P for disconnecting steam / water connection and electrical connection, defective spare parts / items and carrying out necessary Major overhauling as required, including cleaning, servicing, oiling, greasing, weilding work, polishing etc, making all water/ steam connection and electrical connection, leak testing at desired pressure, with and including testing, commissioning of each equipment suitable for Drying Tumbler, Make- FABCARE, Model-DTS 60, capacity-60kg at optimum efficiency as per the standard. Note:- (1) Spare parts to be replaced shall be measured and paid under the following respective parts. ( Sr no. 2.01 to 2.24) (2) Contactor should produce OMU of agreement between OEM & contractor firm from whom contractor should carried out the major overhauling of Drying Tumbler which is fabcare (3) Contractor should arrange necessary T & P and Man power to take out unsv Drying Tumbler major overhauling and refixing the same a existing position after overhauling all as specified and directed by Engr-in-charge. The quoted rate inclusive of all and no extra cost admissible in this regard.
Supply only Steam Heating Coils Copper Tube Alu. FINS
Supply only Main Drive V.Belts, Make - FENNER/DUNLOP/NAVYUG
Supply only Main Idler V.Belts, Make - FENNER/DUNLOP/NAVYUG
Supply only Steam Trape
Supply only Bye Pass Assembly S.S. Ball valves
Supply only Automatic Steam inlet valve
Supply only Main Drive 2 Bearing + 2 pcs Sleeves
Supply only Main IDLER Bearing + 4 pcs
Supply only Pneumatic Pipes & Fittings
Supply only Alu. Blowers for Suction
Supply only Glass with rubber Packing and S.S. screws
Supply only Rubber Packing for lint screen
Supply only Door Latches for lint screen
Supply only Door Limit Switch
Supply only MCB Make- HAVELLS/L&T/STANDARD.
Supply only Timer 0 - 60 , MAKE- L&T/ HAVELLS/
Supply only Timer Rev - Fwd
Supply only contactor
Supply only MPD
Supply only DTC (Digital Temp. Controller)
Supply only Thermo Couple
Supply only Push Button Green
Supply only Ind. Light
Supply only Red push button
Disconnecting electric/Steam connection of Flat Work Ironer, Size-830MM X 3300MM, Make- fabcare from press to carry out day to day/ breakdown maintenance of the press and remove all dust and sand particles, providing oil and grease to all moving parts including greasing of motors bearings etc checking all loose electrical connections and tightening all electrical connection with thimble and commissioning after refixing it at original position and put equipment in fully functional conditions all as specified and directed by Engr-in-charge. Note:- All major spares and material required to fix in Flat Work Ironer, Size-830MM X 3300MM for put it functional will provide against respective items.
Taking down of unserviceable spare parts of Flat Work Ironer, Size-830MM X 3300MM, Make-FABCARE comprising, dismantling of the equipments using adequate labour and T&P for disconnecting steam / water connection and electrical connection, defective spare parts / items and carrying out necessary Major overhauling as required, including cleaning, servicing, oiling, greasing, weilding work, polishing etc, making all water/steam connection and electrical connection, leak testing at desired pressure, with and including testing, commissioning of each equipment suitable for Flat Work Ironer, Make- FABCARE at optimum efficiency as per the standard. Note:- (1) Spare parts to be replaced shall be measured and paid under the following respective parts. ( Sr. no. 4.01 to 4.33) (2) Contactor should produce OMU of agreement between OEM & contractor firm from whom contractor should carried out the major overhauling of Flat work Ironer which is fabcare. (3) Contractor should arrange necessary T & P and Man power to take out unsv Flat work Ironer major overhauling and refixng the same a existing position after overhauling all as specified and directed by Engr-in-charge. The quoted rate inclusive of all and no extra cost admissible in this regard.
Supply only Polyester Padding
Supply only Flannel Cloth
Supply only Final Cover
Supply only Conveyor Belts Imported with hook & pin as spare
Supply only Guide Tape
Supply only Main Bearing Set Roller (2 Pcs. = 1 Set)
Supply only Flexible S.S. Hose Pipes (3 Pcs. = 1 Set)
Supply only VFD, Make- DELTA/L&T/YASHKAWA
Supply only V-Belts, Make - FENNER/DUNLOOP/NAVYUG
Supply only FRL
Supply only Pneumatic Fitting & Pneumatic Pipe
Supply only MCB, 32 Amp TPN, 10KA 415Volt, Make- L&T/HAVELLS/STANDARD
Supply only Push Button
Supply only Ind. Light
Supply only Temp. Meter
Supply only Thermo Couple
Supply only Gripper for Duffle Roll
Supply only Steam Trape
Supply only Ball Valve for Steam Trape
Supply only Limit Switch
Supply only Pressure Guage
Supply only Air Regulator Front Side
Supply only Contactor
Supply only Single Phase Preventer
Supply only O/L Relay
Supply only 4" Flexible pipe blower Exhaust
Supply only Solenoid Valve
Supply only Main Pneumatic Air Cylinder
Supply only Main Motor
Supply only Blower Motor
Supply only Gear Box
Supply only Main Gear + Pinion Set
Supply only Angle Valve for Steam Inlet
Disconnecting electric/Steam connection of Vacuum steam Ironing Finishing Table machine, Make- fabcare from press to carry out day to day/ breakdown maintenance of the press and remove all dust and sand particles, providing oil and grease to all moving parts including greasing of motors bearings etc checking all loose electrical connections and tightening all electrical connection with thimble and commissioning after refixing it at original position and put equipment in fully functional conditions all as specified and directed by Engr-in-charge. Note:- All major spares and material required to fix in Vaccum steam Ironing Finishing Table machine for put it functional will provide against respective items.
Taking down of unserviceable spare parts of Vaccum steam Ironing Finishing Table machine, Make FABCARE, comprising, dismantling of the equipments using adequate labour and T&P for disconnecting steam / water connection and electrical connection, defective spare parts / items and carrying out necessary Major overhauling as required, including cleaning, servicing, oiling, greasing, weilding work, polishing etc, making all water/steam connection and electrical connection, leak testing at desired pressure, with and including testing, commissioning of each equipment suitable for Vaccum steam Ironing finishing table machine, Make- FABCARE, MODEL- FIB 42 at optimum efficiency as per the standard. Note:- (1) Spare parts to be replaced shall be measured and paid under the following respective parts. ( Sr no. 6.01 to 6.28) (2) Contactor should produce OMU of agreement between OEM & contractor firm from whom contractor should carried out the major overhauling of Vaccum steam Ironing Finishing Table Machine which is fabcare (3) Contractor should arrange necessary T & P and Man power to take out unsv Vaccum steam Ironing Finishing Table Machine major overhauling and refixng the same a existing position after overhauling all as specified and directed by Engr-in-charge. The quoted rate inclusive of all and no extra cost admissible in this regard.
Supply only SINGLE SOLENOID VALVE 1/4 CEME FOR TABLE
Supply only HAND IRON 2128 MODEL
Supply only HEAVY IRON OF TI 125
Supply only CONTACT BLOCK 1NO+1NC , Make- L&T / SIEMENS/LEGRANDS
Supply only CONTACT BLOCK 2NO+2NC , Make- L&T / SIEMENS/LEGRANDS
Supply only CONTACTOR 9A , Make- L&T / SIEMENS/LEGRANDS
Supply only CONTACTOR 18A , Make- L&T / SIEMENS/LEGRANDS
Supply only CONTACTOR 25A , Make- L&T / SIEMENS/LEGRANDS
Supply only CONTACTOR 32 A , Make- L&T / SIEMENS/LEGRANDS
Supply only CONTACTOR 40 A , Make- L&T / SIEMENS/LEGRANDS
Supply only DOOR GASKIT , Make- L&T / SIEMENS/LEGRANDS
Supply only FRL 1/4
Supply only FRL 1/2"
Supply only INDGATING LIGHT
Supply only INDGATING LIGHT CLEAR
Supply only LIMIT SWITCH
Supply only MPD 0-10
Supply only MPD 7-20
Supply only PNEUMATIC ACTUATOR FITTED BUTTER FLY VALVE 2" ROTEX
Supply only PRESSURE SWITCH
Supply only PUSH BUTTON
Supply only REVERSING TIMER ANALOG TYPE
Supply only SINGLE SOLENOID VALVE 1/4
Supply only SS CASTING BALL VALVE FOR STEAM INLET 1/2"
Supply only SS CASTING BALL VALVE FOR STEAM INLET 3/4"
Supply only TEMPRATURE METER 72 X 72
Supply only THERMO CUPLE 3MTR
Supply only THERMO CUPLE 5MTR
Disconnecting electric/Steam connection of Flat Bed Press,, Make- Fabcare from press to carry out day to day/ breakdown maintenance of the press and remove all dust and sand particles, providing oil and grease to all moving parts including greasing of motors bearings etc checking all loose electrical connections and tightening all electrical connection with thimble and commissioning after refixing it at original position and put equipment in fully functional conditions all as specified and directed by Engr-in-charge. Note:- All major spares and material required to fix in Flat Bed Press, for put it functional will provide against respective items.
Taking down of unserviceable spare parts of Flat Bed Press, Make FABCARE, comprising, dismantling of the equipments using adequate labour and T&P for disconnecting steam / water connection and electrical connection, defective spare parts / items and carrying out necessary Major overhauling as required, including cleaning, servicing, oiling, greasing, weilding work, polishing etc, making all water/steam connection and electrical connection, leak testing at desired pressure, with and including testing, commissioning of each equipment suitable for Flat Bed Press, Make - FABCARE, Model-FBS 30 at optimum efficiency as per the standard. Note:- (1) Spare parts to be replaced shall be measured and paid under the following respective parts. (Sr no. 8.01 to 8.16) (2) Contactor should produce OMU of agreement between OEM & contractor firm from whom contractor should carried out the major overhauling of Flat Bed Press which is fabcare (3) Contractor should arrange necessary T & P and Man power to take out unsv Flat Bed Press major overhauling and refixng the same a existing position after overhauling all as specified and directed by Engr-in-charge. The quoted rate inclusive of all and no extra cost admissible in this regard.
Supply only Temp. Meter
Supply only Thermo Couple for Temp. Meter
Supply only Toggle Switch
Supply only Contactor
Supply only GIC Timer
Supply only Solenoid Valve 1/2"
Supply only Flow Control Valve
Supply only Silencer
Supply only Silencer with Flow Control Valve
Supply only FRL 1/2"
Supply only Padding with final cloth
Supply only Air Flexible Pipe
Supply only Steam Angle Valve
Supply only Solenoid Valve for Angle Valve
Supply only Spring
Supply only Oil Seal for Air Cylinder
Disconnecting electric/Steam connection from General Utility Press Make- fabcare from press to carry out day to day/ breakdown maintenance of the press and remove all dust and sand particles, providing oil and grease to all moving parts including greasing of motors bearings etc checking all loose electrical connections and tightening all electrical connection with thimble and commissioning after refixing it at original position and put equipment in fully functional conditions all as specified and directed by Engr-in-charge. Note:- All major spares and material required to fix in General Utility Press, for put it functional will provide against respective items.
Taking down of unserviceable spare parts of General Utility Press, Make FABCARE, comprising, dismantling of the equipments using adequate labour and T&P for disconnecting steam / water connection and electrical connection, defective spare parts / items and carrying out necessary major overhauling as required, including cleaning, servicing, oiling, greasing, weilding work, polishing etc, making all water/steam connection and electrical connection, leak testing at desired pressure, with and including testing, commissioning of each equipment suitable for General Utility Press, Make- FABCARE, Model- FUPS at optimum efficiency as per the standard. Note:- (1) Spare parts to be replaced shall be measured and paid under the following respective parts.(Sr. no. 10.01 to 10.19) (2) Contactor should produce OMU of agreement between OEM & contractor firm from whom contractor should carried out the major overhauling of General Utility Press which is fabcare. (3) Contractor should arrange necessary T & P and Man power to take out unsv General Utility Press major overhauling and refixng the same a existing position after overhauling all as specified and directed by Engr-in-charge. The quoted rate inclusive of all and no extra cost admissible in this regard.
Supply only Temp. Meter
Supply only Thermo Couple For Temp. Meter
Supply only Green Push Button
Supply only Red Push Button
Supply only Indicating Light
Supply only Toggle Switch
Supply only Contactor Make- L&T / SIEMENS/LEGRANDS
Supply only GIC Timer
Supply only Solenoid Valve 1/2"
Supply only Flow Control Valve
Supply only Silencer
Supply only Silencer with Flow Control Valve
Supply only FRL 1/2"
Supply only Padding with Final Cloth
Supply only Air Flexible Pipe
Supply only Steam Angle Valve
Supply only Solenoid Valve for Angle Valve
Supply only Spring
Supply only Oil Seal for Air Cylinder
Disconnecting electric/Steam connection of Washer Extractor-120 Kg Make- fabcare from washer extractor to carry out day to day/ breakdown maintenance of the press and remove all dust and sand particles, providing oil and grease to all moving parts including greasing of motors bearings etc checking all loose electrical connections and tightening all electrical connection with thimble and commissioning after refixing it at original position and put equipment in fully functional conditions all as specified and directed by Engr-in-charge. Note:- All major spares and material required to fix in Washer Extractor-120 Kg for put it functional will provide against respective items.
Taking down of unserviceable spare parts of Washer Extractor-120 Kg, Make FABCARE, comprising, dismantling of the equipments using adequate labour and T&P for disconnecting steam / water connection and electrical connection, defective spare parts / items and carrying out necessary Major overhauling as required, including cleaning, servicing, oiling, greasing, weilding work, polishing etc, making all water/steam connection and electrical connection, leak testing at desired pressure, with and including testing, commissioning of each equipment suitable for Washer Extractor, Model- AWXS 120, capacity-120kg at optimum efficiency as per the standard. Note:- (1) Spare parts to be replaced shall be measured and paid under the following respective parts ( Sr. no. 12.01 to 12.32) (2) Contactor should produce OMU of agreement between OEM & contractor firm from whom contractor should carried out the major overhauling of Washer Extractor which is fabcare. (3) Contractor should arrange necessary T & P and Man power to take out unsv Washer Extractor capacity -120 kg major overhauling and refixng the same a existing position after overhauling all as specified and directed by Engr-in-charge. The quoted rate inclusive of all and no extra cost admissible in this regard.
Supply only V Belt, Make - FENNER/DUNLOP/NAVYUG
Supply only VFD, Make- DELTA/L&T/YASHKAWA
Supply only Display Controller (AXW Controller)
Supply only Single Solenoid Valve
Supply only Main Water Inlet Valve (Actuator Butterfly Valve), MAKE- SANT/AUDCO/KARTAR
Supply only Main Drain Valve (Actuator Butterfly Valve), MAKE- SANT/AUDCO/KARTAR
Supply only Main Steam Inlet Valve Automatic
Supply only S.S Flexible Hose (For Steam Inlet)
Supply only S.S Flexible Hose 2" (For Water Inlet for back side of M/c at the time of tilting)
Supply only Main Drive Alu.Pulley
Supply only Main Bearing Set
Supply only Main Bearing Seal Set
Supply only Main Bearing Circlip
Supply only Pneumatic Fitting (Tee , Elbow , Connector)
Supply only Pneumatic Pipe
Supply only Hose Pipe ( JK pipe 4"
Supply only Hose Pipe ( JK pipe 2 ¼")
Supply only Clamps 4" Heavy Fabricated S.S
Supply only Clamps 2"
Supply only Air Vent Pipe (JK pipe 2 ¼")
Supply only FRL Set
Supply only S.S Screws (For Main Cover)
Supply only Teflon Tape
Supply only Pneumatic Cylinder Door LOCK
Supply only L N Key Bolt for main Housing
Supply only Main Shocker
Supply only Main Springs heavy
Supply only Main Door Glass Toughned
Supply only Door Lock Latch Handle
Supply only MCB 40 Amp, TPN , 10KA 415 Volt, Make- L&T/HAVELLS/STANDARD
Supply only Thermo Couple
Supply only Door Gasket
M&L for repairing/servicing (rewinding) of three phase induction motor/ blowers motor, capacity-1HP, single phase motor, Make- ABB or existing motor make & Including the following jobs:- (a) Rewinding of electric motor of washing Calendaring machine/flat bed press etc. Using super enamelled copper winding wire Of gauge equal to or more than existing Vanishing the same after rewinding. (b) Cleaning washing ball bearing with kerosene Oil, greasing with new grease of make Castrol Refixing to its original position, testing and Commissiong complete all as specified.
M&L for repairing/servicing (rewinding) of three phase induction motor, Cap- 5HP, 415 Volts, Make- existing motor make and using Super enamelled copper winding wire of gauges equal to or more than existing. Including Replacement of sheet ‘E’ class insulation and sleeve Including the following jobs: (a) Reassembling the motor & refixing (b) Cleaning washing ball bearing with kerosene Oil, greasing with new grease of make Castrol Refixing to its original position testing and Commission complete all as specified and Directed
M&L for repairing/servicing (rewinding) of three phase induction motor, Cap- 2 HP, Make- existing motor make and using Super enamelled copper winding wire of gauges equal to or more than existing. Including Replacement of sheet ‘E’ class insulation and sleeve Including the following jobs:- (a) Reassembling the motor & refixing (b) Cleaning washing ball bearing with kerosene Oil, greasing with new grease of make Castrol Refixing to its original position testing and Commission complete all as specified and Directed
M&L for repairing/servicing (rewinding) of three phase induction /squirrel cage motor, Cap-10 HP 1400RPM 3 phase. using super enamelled copper winding wire of gauge equal to Or more than existing including Replacement of sheet ‘E’ class insulation and sleeve Including the following:- (a) Reassembling the motor & refixing. (b) Greasing of ball bearing with ball bearing after Cleaning of old grease with kerosene oil, reinstalling in the respective machine and testing/commission All as specified and directed.
M&L for repairing/servicing (rewinding) of three phase induction /squirrel cage motor, Cap-20 HP 1400RPM 3 phase. using super enamelled copper winding wire of gauge equal to Or more than existing including Replacement of sheet ‘E’ class insulation and sleeve Including the following:- (a) Reassembling the motor & refixing. (b) Greasing of ball bearing with ball bearing after Cleaning of old grease with kerosene oil, reinstalling in the respective machine and testing/commission All as specified and directed.
M&L for repairing/servicing (rewinding) of three phase induction /squirrel cage motor, Cap-25HP 1400RPM 3 phase. using super enamelled copper winding wire of gauge equal to Or more than existing including Replacement of sheet ‘E’ class insulation and sleeve Including the following: (a) Reassembling the motor & refixing. (b) Greasing of ball bearing with ball bearing after Cleaning of old grease with kerosene oil, reinstalling in the respective machine and testing/commission All as specified and directed.
Supply & fixing in repair/replacement of automatic hand iron cap- 18lbs, 1.2KW with sponged ironing including heating element, cord cord socket complete all as per specified and directed by Engr-in-Charge.
Dismantling of the equipments using adequate labour and for repairing, welding and replacement of defective wheels, nut and bolts suitable for Washroom Trolley, Dry Linen Trolley, Shelf Trolley and Mobile Table of Make FABCARE. Note:- Spare parts to be replaced shall be measured and paid under the following respective parts.
Supply and fixing in Repair/replacement Wheel Size 6" with brake, MAKE- ROLIN/SENSON/SATYAM
S &F in repair 63A four pole TPN, 10KA, 415Volt C curve type all as per specified &directed by Engr-in-Charge. Make- L&T/ HAVELLS/ LEGRAND
S &F in repair 25A four pole TPN, 10KA, 415Volt C curve type all as per specified &directed by Engr-in-Charge. Make- ABB/ HAVELLS/ LEGRAND
S &F in repair 63A MCCB 4 pole all as per specified & directed by Engr-in-Charge., Make- L&T/ HAVELLS/ LEGRAND
S & F in repair sheet metal enclosures 8 way SPN double door DB with fittings all as per specified and directed by Engr-in-Charge. Make- LEGRAND/HAVELLS/STANDARD
M & L for rewinding Air compressor three phase motor of capacity 4 kw/ 5 Hp , Make-ELGI equipments limited/ Bharat bijlee, 1435RPM speed by dismantling the electric supply, removing the burnt copper winding and rewinding the motor with appropriate gauge of super enamelled superior quality of copper wire, varnishing, heating, replacement of both ball bearing, reassembling the same and testing complete all as specified and directed by Engr-in-Charge.
M & L for overhauling of the compressor of capacity 5 HP, Max working pressure -12KG/CM2, HYD test pressure -(19.8 or 20)KG/CM2, AIR tank capacity-220 Ltr, Make- Kirloskar/ ELGI by disconnecting the compressor from motor, opening and replacing following worn out spare parts reassembling complete compressor & refixing in same position & connecting including control panel repair, replacing the rusted nuts, bolts, washers etc and testing complete all as specified and directed by Engr-in-Charge. (a) gear wheel- 02 Set (b) Distance ring-01 Nos (c) Injection rings -04 Nos (d) Piston rings - 16 Nos (e) Pressing bush- 04 Nos (f) O- ring -01 Nos (g) Oil Seal -01 Nos (h) Tensioning element- 02 Nos (i) Upper and lower rotor et- 02 Nos (j) Gasket packing- 02 Nos (k) Oil level sight glass - 02 Nos (l) Bearing set- 01 Set
M & L for repairing weighing machine including display plate with minor defects and minor spare parts, sensor etc complete all as per specified and directed by Engr-in- Charge.
Supply and fixing, in repair, installation, testing and commissioning complete set of out outdoor unit kit working on R-22/404a of 3 ton, company made consist of condenser coil, wiring kit, condenser fan motor, condenser fan or blower, contactor, terminal etc with compresser and making plateform for outdoor unit with suitable size of fastener and MS frame work and making good the disturb surface complete all as specified and directed. Make- Model no- RAUH02012KP-O of bluestar/ice make/Carrier. Note- (i) Old taking out dismanteled unit shall be deposited to MES store yard from existing location .The rate include necessary transportation & Manpower for dismantling and transporting the unit. (ii) Old and dismantled MS frame will be considered in sch of credit Srl No 87.
Supply and fixing, in repair, installation, testing and commissioning complete set of indoor unit kit working on R-22/404a of cap 3 ton, consist of blower motor, blower, wiring kit with cooling coil with housing with bracket frame etc, including making plateform for indoor unit with suitable size of fastener and MS frame work and making good the disturb surface, interlocking control wiring, timer, sub zero all as required complete all as specified and directed. Make- Model no- RAUH02012KP-I of bluestar/ice make/Carrier. Note- (i) Old dismanteled indoor unit shall be deposited to MES store yard from existing location. The rate include necessary transportation & Manpower to dismantling and transporting the unit. (ii) Old and dismantled MS frame will be considered in sch of credit Srl No 87.
S&F in repair sandwich type PUF panel having ceiling size 224"x166", panel thickness 60mm and PUF density 40+2 kg/m3, panel surfess material GI PP sheet with pvc film complete all as per requirement at site complete all as specified and directed. Make-Bluestar.
S&F in repair sandwich type PUF panel having ceiling size 209"x151", panel thickness 60mm and PUF density 40+2 kg/m3, panel surfess material GI PP sheet with pvc film complete all as per requirement at site complete all as specified and directed. Make-Bluestar.
S&F in repair copper tubing 5/8" dia & wall thickness-0.035 mm with required nitrile rubber insulation for connection of indoor and outdoor unit as per site requirement complete all as specified and derected. Make:- Totaline/Godrej or equivalent.
S&F in repair copper tubing 3/8" dia & wall thickness-0.032 mm with required nitrile rubber insulation for connection of indoor and outdoor unit as per site requirement complete all as specified and derected. Make:- Totaline/Godrej or equivalent.
S&F in repair timer Electronic type, starting time range 3-60 sec rated voltage :- 200-240V, 50HZ including connecting complete.
Supply and fix in repair Controller Suitable for Cold Chamber complete all as specified and directed. Make:- Item Code CBCL-B027-00 of Blue Star or Equivalent model of Carrier/ Ice Make.
M & L for shifting of outdoor units of cold chamber from inside to outside at suitable location with making plateform of PCC of 1:2:4 type B-1 using 20 mm Graded stone aggregate of suitable size for each outdoor unit with suitable size of fastener and MS frame work and making good the disturb surface and recharging the outdoor unit with R-22 Refrigerant complete all as specified and directed.
M&L for fabrication of stand from MS Frame work of suitable size for supporting the copper tubing from indoor unit to outdoor unit including cutting, Jointing, welding & necessary fabricationcl incl necessary protection to be adopted while carrying out the job all as specified and as directed by Engr-in-Charge.
Outsource services of Data Entry Operators (04 Nos) under GE (E/M) Base Hospital for following:- (i) Data Entry & Preparation of reports & returns (ii) Other official typing work (iii) Maintenance of office records (iv) Filing & linking of correspondences for case of reference. (v) Taking direction & Putting up drafts accordingly. (vi) Compilation & Collection of data. Note:- (a) All outsourcing pers to have biometric attendance in all contracts. (b) In case biometric machine is off rd, Contractor to repair/replace the same within 24 hrs, otherwise same will be marked "Absent". (c) The Data Entry Operator(s) must be qualified Graduates/ Ex-Serviceman and knowledge of Computer. (d) The contractor will install and maintain a Biometric Based Attendance Monitoring System (BBAMS) and enroll their employed staff in it. (e) Contractor shall be bond to implementation to minimum wages as per gov policy, EPF and ESIC payment and quoted rate shall deemed to include these factors. Contractors shall made payment to the staffs throught RTGS/ RTS in account of individual and submit the details of proof, EPF & ESIC of each staffs before asking of any payment (RAR or Final Bill). (f) Any absence of deployed personnel shall invite a compensation of Rs 1000/- per day per individual. Contractor is to provide alternate arrangement if personnel is absent continuously for 7 days. No payment shall be admissible to contractor, when personnel is absent on duty.
(i) The estimated cost of the work in respect of BOQ Sr iterm No 38 (as based on minimum wages rates issued vide central/state) is Rs 1245312. If the quoted amount is found less than the estimated cost of Sr item No 38 of BOQ and tender of lowest bidder is considered for acceptance, then the lowest bidder will have to deposit FDR in favour of Accepting officer for the difference in estimated cost and Accepted amount in respect of BOQ Sr item No 38 within 30 days from date of acceptance. In case the said FDR is not submitted within 30 days the amount in question shall be recovered from contractor’s first RAR/Final bill whichever is earlier. However the FDR/recovered amount shall be released to the contractor after satisfactory completion of work. Attention is further invited added that when the amount of said recovery mentioned herein above is less than the amount of performance security as indicated under Clasue 02 on page 04 of CA and Clause 12 on page 11 of CA, no FDR is required to be submitted for quoting less rate against BOQ Srl Item No 38. However if the amount of performance security is less than the FDR to be submitted for less quoting rate, the difference of performance security amount and FDR amount(for less quoting rates) shall be deposited by the lowest bidder (whose tender is accepted) in the form of FDR for difference amount over and above performance security within 30 days from the date of Acceptance.
SANJEEV ENTERPRISES
Flint India
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .