Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical MOHANPUR GURGAIN BURMU RANCHI | RANCHI | JHARKHAND | 829205 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 01 PADUMPUKHRI NEAR BUS STAND NEAR BUS STAND SONITPUR ASSAM 784001 | SONITPUR | ASSAM | 784001 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical VILLAGE CHANDANDIH PO PS LATEHAR DISTRICT LATEHAR JHARKHAND 829206 | LATEHAR | JHARKHAND | 829206 | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
21 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ZILA ABHIYNTA, LATEHAR
ZILA ABHIYNTA OFFICE LATEHAR
Construction of Boundary wall, Two No of Main gate, Ticket Counter room and Land Levelling for propose Astro Park at Netarhat GP Netarhat Block Mahuadnar District Latehar.
2026_ZPLAT_120330_1
ZP/LATEHAR/32/2026-27/ Group_68
Open Tender
Civil Works - Buildings
Percentage
210 days
NETARHAT MAHUADANR
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.8 L
23 Nov 2026
28 Oct 2026
23 Nov 2026
28 Oct 2026
21 Nov 2026
28 Oct 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in hard soil (vide classification of soil item-A+B) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. | 472.25 | M3 | 263.44 | ₹1,24,409.54 |
| 2 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 4.69 | M3 | 239.02 | ₹1,121 |
| 3 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royaly and taxes all complete as per building specification and direction of E/l. | 41.35 | M3 | 697.24 | ₹28,830.87 |
| 4 | Providing designation 75Bbrick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints costs of screening materials, scaffolding, raking out joints to 15mm depth curing taxes and royalty all complete as per building specification and direction of E/I. | 1.6 | M3 | 7,329.9 | ₹11,727.84 |
| 5 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes, royalty all complete as per building specification and direction of E/I. | 543.01 | M2 | 475.78 | ₹2,58,353.3 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 36.85 | M3 | 6,033 | ₹2,22,316.05 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 0.29 | M3 | 5,874.03 | ₹1,703.47 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
B.C.D. S.O.R. Item No. 5.3.11 | 46.27 | M3 | 8,546.89 | ₹3,95,464.6 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
B.C.D. S.O.R. Item No. 5.3.9.1 | 138.72 | M3 | 6,836.13 | ₹9,48,307.95 |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size)
B.C.D. S.O.R. Item No. 5.3.10 | 87.14 | M3 | 8,140.27 | ₹7,09,343.13 |
stage.html
html • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Group_68.pdf
Tender Documents • 1.02 MB
BOQ_162809.xls
BOQ • 0.31 MB
NIT32CO.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .