Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical CIVIL LINE THANA KOTWALI DISTRICT BASTI | GONDA | UTTAR PRADESH | 271305 | Accepted-Technical As per Uploaded |
| 2 | Rejected-Technical GRAM DERE RRAJA POST PANAPUR TEHSIL GAUSPUR DISTRICT BARABANKI UTTAR PRADESH | GAUSPUR | BARABANKI | UTTAR PRADESH | Rejected-Technical As per Uploaded |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
25 Sept 2026, 3:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
Restoration between Km 0.000 to 5.430 and CC Linnig between Km 0.000 to 0.421, Km 1.500 to 2.050, Km 2.800 to 3.600 and Brick Soling work between Km 0.160 to 0.700, Km 1.190 to 1.550 Km 3.650 to 5.000 and Km 5.100 to 5.500 of Hariharpur Dy.
2026_UPIDC_1186318_1
04/S.E/2026-27
Open Tender
Civil Works
Item Rate
180 days
Khalilabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,300
₹5.6 L
8 Oct 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in constructing channel of mannualy or by tractor where ever and applicable for escapes/channels with discharge below 1 cumec including hard, hard clay charri, bajri upto 5% lead upto 30 meters. Lift upto 1.5 meters excluding mechanical compaction but inclusive of manual compaction and dressing to profiles.i/c cost of all Material, labour & T&P etc. | 19,486 | M3 | - | - |
| 2 | Earth work by power Transport for a lead of upto 1Km. including Excavation Loading, Unloading. Stacking & manual compaction and dressing including all lift shall be applicable for lead beyond 630M and upto 1Km, excluding Royalty. i/c cost of all Material, labour & T&P etc. | 8,026.15 | M3 | - | - |
| 3 | Dry brick soling on Service Road including preparation of sub grade and filling joints with local sand including cost of sand.for proper completion of work i/c cost of all Material, labour & T&P etc. | 7,950 | M2 | - | - |
| 4 | E/W in lip cutting for proper disposal, compaction and dressing i/c cost of all lead lift T &P material labour etc complete as per direction of engineer-in-charge. | 1,526.7 | M3 | - | - |
| 5 | E/W in foundation for longitudinal and cross sleeper with proper dressing and manual compaction in all type of soil including of lead, lift T&P etc. complete as per direction of engineer-in-charge. | 459.1 | M3 | - | - |
| 6 | Centering and Shuttering for sleeper including cost of all material labour T&P etc.complete as per direction of engineer-in-charge. | 733.5 | M2 | - | - |
| 7 | Laying CC in 1:1.5:3 with dala crust stone grit size 4.75 to 20 mm and C-sand for sleeper 7 200x150 including cost of all material, lead, lift, labour, T&P etc.complete as per direction of engineer-in-charge. | 146.7 | M3 | - | - |
| 8 | Preparation of sub grade for lining work including cost of all material labour T&P etc.complete as per direction of engineer-in-charge. | 13,315.64 | M2 | - | - |
| 9 | Laying local sand as filler material in bed and side slope with cost of material, labour etc. As per required for proper completion of work.complete as per direction of engineer-in-charge. | 998.68 | M3 | - | - |
| 10 | Supply and laying LDPE film 200 micron thick in bed and side slope over filler material including cost of all material, labour ete, required for proper completion of work. | 13,315.64 | M2 | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
Lot_1.pdf
Tender Documents • 3.49 MB
BOQ_2232730.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .