| 1 | L1₹3.1 LAccepted-AOC 174 LAJPAT NAGAR JAGATPURA JAIPUR JAIPUR RAJASTHAN 302029 UDYAM RJ 17 0110678 08BCYPJ8834N1ZG B R MSME STATUS AS NOT VERIFIED | JAIPUR | RAJASTHAN | 302029 | ₹3.1 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹3.1 LRejected-Finance ARIMELAM ARIYALUR TAMIL NADU | CUDDALORE | TAMIL NADU | 608703 | ₹3.1 L | L2 | Rejected-Finance L2 Reject |
| 3 | Not Admitted-Fee/PreQual/Technical RAYAGADA | ODISHA | 764062 | - | - | Not Admitted-Fee/PreQual/Technical Others-Withdraw |
| Sl No | Description | Qty | Unit | S. RAJESHKANNAN L2 | VR ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Maintaintance of the Amburani Karayappatti Road KM 0/0 - 2/400 | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete.. | 223.2 | Sqm | 6.5 ₹1,450.80 | 6.3 ₹1,406.16 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 125 | cum | 145 ₹18,125 | 140.4 ₹17,550 |
| 4.00Advance patchwork to an average thickness upto 50mm using premixed 45mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification No 501 | |||||
| 5.00 | Km 0/0 - 1/0 | 1.87 | cum | 4,150 ₹7,760.50 | 4,145 ₹7,751.15 |
| 6.00 | Km 1/0 - 2/0 | 3.82 | cum | 4,060 ₹15,509.20 | 4,155 ₹15,872.10 |
| 7.00Advance patchwork to an average thickness upto 25mm using premixed 13.2mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification No 501 | |||||
| 8.00 | Km 0/0 - 1/0 | 6.18 | cum | 4,840 ₹29,911.20 | 4,830 ₹29,849.40 |
| 9.00 | Km 1/0 - 2/0 | 3.74 | cum | 4,850 ₹18,139 | 4,840 ₹18,101.60 |
| 10.00Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification | |||||
Updated dates
Tender Value
₹3.1 L
EMD Value
₹3,140
Closing Date
23 Oct 2025, 3:00 pmClosed
Bdo,Arimalam
Panchayat Union Office, Arimalam
Maintainance of Amburani Karayapatti road Km 0/0 -2/4
2025_RDTN_613579_1
Arm/SFC/Work-3
Open Tender
Civil Works
Arimalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,140
7 Apr 2026
13 Oct 2025
23 Oct 2025
13 Oct 2025
23 Oct 2025
13 Oct 2025
stage.html
html • 0.04 MB
technical_733093.pdf
techsummary_733093.pdf
BOQ Comparative Chart
xlsx
finsummary_733093.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Arm-Doc-3.pdf
Tender Documents • 0.37 MB
BOQ_733093.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid