Loading…
Loading…
Tender Value
Refer Docs
Closing Date
21 Jul 2023, 3:00 pmClosed
ANIL SASI
Miraj Depot, Bharat Petroleum Corporation Limited
The current design of CFS at Miraj Depot includes 2 nos. of mother foam tanks and 9 nos. of daughter foam tanks. It is proposed to operate the foam feeding system in auto mode which shall ensure timely foam replenishment and shall eliminate unsafe conditions for personnel while operating valves in foam line during emergency. Centralized Foam System Automation works to be completed and 100 percentage functionalities to be implemented as per automation philosophy of BPCL. CFS phase II automation project includes Modification of foam lines, installation of SOVs, Installation of level Switches in daughter foam tanks, Cabling and integration with the existing TAS- PLC provided by Honeywell Automation India Limited.
12392
1000405764
Limited Tender
Lump-Sum
Miraj Depot
6 Sept 2023
22 Jun 2023
21 Jul 2023
22 Jun 2023
21 Jul 2023
22 Jun 2023
22 Jun 2023 - 18 Jul 2023
ANNEXURE VI - TECHNICAL SPECIFICATIONS & SCOPE OF WORK
SUBJECT: TENDER FOR CENTRALIZED FOAM SYSTEM (CFS) PHASE II AUTOMATION AT BPCL MIRAJ DEPOT.
1. S/L/C of 12 core 1.5 sq. mm control cable for mother foam tank motors and SOVs (C/R to JB)
2. S/L/C of 2 core 1.5 sq. mm control cable for SOV's (from JB to SOV):
Qty: 775 Metre.
3. S/L/C of 12 pair 1.5 sq.mm signal cable from C/R to JB for Level Switch:
4. S/L/C of 2 pair 1.5 sq.mm signal cable- JB to Level switch:
Qty: 515 Metre.
5. S/I/C of FLP Solenoid Operated Valve (SOV) 1.5" & 2.0” 230 V AC for foamline:
Qty: SOV- 2 inch : 1 Nos.
SOV- 1.5 inch : 2 Nos
6. S/I/C of Level switch top mounted probe type for daughter foam tanks:
7. Explosion Proof/ Weather proof Junction Box:
JB Specification & Quantity Requirement
Size: 250mm X 250mm
Input Entry : Cable Size- 12P X1.5 Sq. MM
(25 mm - 2 Entries)
Output Entry: Cable Size- 2PX1.5 Sq. MM
Supply and installation of JB Glands will
be under the scope of successful bidder.
Gland, size 19mm = 35 Nos
Gland, size 25mm = 6 Nos
Blind, size 19mm = 10 Nos
Blind, size 25mm = 2 Nos
Location for installation of JB will be given by Engineering Officer.
8. S/F of GI cable trays for control cables:
9. Supply and erection of SS 304 Ball valve 1.5 " & 2.0” for SOV bypass and foam tank isolation:
Qty: SS Ball valve 1.5 inch - 15 Nos
SS Ball valve 2 inch - 2 Nos
CS Ball valve 2 inch - 6 Nos
10. Supply and laying of SS 304 1.5" & 2.0” pipe for bypass line at daughter tank.
Supply, fabrication including cutting; edge preparation; fit up; welding and erection of above ground
pipeline over existing pedestals; overheads on racks and at all elevations; connecting with equipment
nozzles; tapping for pressure gauges; sample connection; etc. using approved make and suitable
welding electrode.
11. Supply and fabrication of SS Elbow 1.5"& 2.0”
Qty: SS Elbow 1.5 inch - 30 Nos
SS Elbow 1.5 inch - 06 Nos
12. Supply and fabrication of CS Elbow 2.0”
Qty: CS Elbow 2.0 inch – 12 Nos
13. Supply and Installation of SS Non-Return (2.5”) Valve for foam line of HVLR (i.e., Foam line- AFFF & Foam
Qty: SS Non-Return (2.5”) Valve – 4 Nos
14. Supply and fabrication of SS Flange 1.5" & 2” for fixing, ball valve, NRV, SOV and Radar Gauge:
Qty: SS Flange 1.5” - 60 Nos (1.5” SOV, 1.5” Ball valve)
SS Flange 2.0“ - 12 Nos (2”SOV, 2” Ball valve, Radar Gauge)
SS Flange 2.5” - 08 Nos (NRV)
15. Fabrication, welding of the supplied 3" SORF (free issue material by BPCL)
16. Supply and fabrication of CS Flange 2.0" for ball valve & SOV:
17. Charges for making flanged joints 1.5” & 2.0”
Qty: 1.5” Flanged Joints - 30 Nos
2.0” Flanged Joints - 18 Nos
18. Painting Specification:
Surface Preparation:
Heavy Scrapping and surface preparation up to SSPC SP2 or St.3. (External surface of Pipeline as specified).
Mechanical Cleaning manually shall be done by brass wire brush, emery/sandpapers etc as instructed by
Engineer-in-charge. Removing oil, dust, grease, mill scale and moisture and making the surface dry including all
materials, consumables, labour; scaffolding; equipments etc. complete. Rate shall be paid in M2 basis of the
scrapped surface
(Note : Scaffolding shall be paid separately).
Supplying and applying primer on the prepared surface including all labor; scaffolding; consumables; equipments;
primer etc. complete as per specifications (primer shall be applied within 8 hours of surface preparation). Paint
shall be as per attached list of BPCL recommended manufacturers. Two coat of surface tolerant epoxy mastic
coating at 125 microns per coat. Rate shall be paid in M2 basis of the painted surface.
(Note : Scaffolding shall be paid separately).
Supplying and applying finish paints on the prepared pipe surface including all labor; scaffolding; consumables;
equipments; primer etc. complete as per specifications. Paint shall be as per attached list of BPCL recommended
Finish Coat: Two coats of acrylic aliphatic polyurethane at 30 microns/coat in Yellow/golden yellow shade as per
IS : 5. Rate shall be paid in M2 basis of the painted surface.
19. Pipelines supports with PCC for pipeline/SOVs/JBs/cable trays etc.:
Providing and laying PLAIN CEMENT CONCRETE for all depths below and up to plinth level in foundations, drains,
fillings, non-suspended floors, pavements & ramps or any other works etc. including the cost of position cement
concrete of specified grade including the cost of centering and shuttering, tamping, ramming, vibrating, curing,
in any shape, position, thickness and finishing the top surface rough or smooth, etc. all complete as per directions
of Engineer-in-charge.1:2:4 (1 Cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size)
20. Structural steel support work pipeline/SOVs/JBs/cable trays etc:
Supply, fabrication and erection in position; bolted and/or welded structural steel works at all levels; including all
built-up sections /compound sections made out of rolled sections and / or plates in trusses; rafters; purlins; wind
ties; columns; portals; platforms; staircases; (excluding chequered plates, swing ladders, foundation bolts and
gratings) ladders; stoppers; brackets sag rods; supports for equipment and accessories; hand railings posts cutting
to required size as per approved drawings; straightening if required bolting/ welding of joints (including sealing
the joints of the box sections with continuous welding wherever specified) finishing edges by grinding; fixing in
line and level with temporary staging and removal of same after erection; grouting with ordinary grout or non-
shrink grout as specified; including preparation of detailed fabrication drawings, cost of painting as specified
below, complete in all respect as directed by Engineer-in-charge. Cost of nut & bolts to be borne by contractor.
21. Supplying & Fixing 150 # CS Butterfly valve of size 3”, 4” & 6”
Qty: Butterfly valve 3”- 2 Nos
Butterfly valve 4”- 2 Nos
Butterfly valve 6”- 2 Nos
22. Supply and fixing of acrylic tubing for daughter foam tank level indicator (1/2")
The functionality of control panel to be programmed is described as below:
a. Shall host power supply to field instruments (230V in case of SOVs, 24V DC if required in case
of liquid level switches)
b. Shall have option for mother tank selection and pump selection (main + standby) to be used for
auto foam feeding.
c. Shall give audio/visual alarm on reaching the low level in any of the mother tanks
d. Receive feedback from liquid level switches of daughter foam tanks
e. Shall give open command to the SOV of the selected mother tank and that of daughter tank in
which foam level drops below low level (as per feedback from liquid level switch).
f. Based on SOVs opened for daughter tanks, the panel shall give a visual indication for the
daughter foam tanks being topped up.
g. Shall give start command to pump for foam pumping.
h. Shall give stop command to the SOV of daughter tank when foam level reaches high level (as
per feedback from liquid level switch).
i. Shall give stop command to pump once all the SOVs of daughter tanks to be topped up
has closed/high level reached in all daughter tanks.
j. Shall give close command to the SOV of mother tank, once close command to pump of mother
# The basic setup for auto foam feeding system is depicted by the block diagram below:
# The basic setup for auto foam induction system for HVLRM is depicted by the block diagram below:
Supply & Fabrication works Qty UoM
Supply and fabrication of SS 304 1.5" pipe for bypass line at
daughter foam tank CFS and HVLR
Supply and fabrication of SS 304 2" SS pipe for bypass line at
mother foam tank and stub for fixing RADAR Gauge.
Supply and fabrication of 2" MS pipe for bypass line at
daughter tank (Water line SOV bypass HVLR)
S/I/C of FLP solenoid operating valve (SOV) 1.5" 230 V AC for
daughter foam tanks
S/I/C of FLP solenoid operating valve (SOV) 2.0" 230 V AC for
mother foam tanks
Supply and erection of SS ball valve 1.5 " for SOV bypass and
foam tank isolation
Supply and erection of SS ball valve 2.0 " for SOV bypass and
foam tank isolation.
Supply and erection of CS ball valve 2.0 " for SOV bypass and
foam tank isolation.
Supply and fabrication of SS Flange 1.5" SS for ball valve &
Supply and fabrication of SS Flange 2.0" for SS for ball valve &
10 SOV, 10 Nos and for mounting RADAR Gauge on Mother 12 24 IND
foam tank: 2 Nos
Supply and fabrication of CS Flange 2.0" for ball valve & SOV,
12 Supply and fabrication of SS Flange 2.5" for NRV fixing 8 20 IND
Charges for making flanged joints/fixing blind flanges class
13 150 lb including supplying and fixing of metallic spiral gasket, 30 45 IND
Charges for making flanged joints/fixing blind flanges class
14 150 lb including supplying and fixing of metallic spiral gasket, 18 36 IND
15 Supply and fabrication of SS Elbow 1.5" , 30 Nos 30 90 IND
16 Supply and fabrication of SS Elbow 2.0", 6 Nos 6 24 IND
17 Supply and fabrication of CS Elbow 2.0" , 12 Nos 12 48 IND
Supply and Installation of SS NON RETURN VALVE as per BPCL
enclosed specifications including supplying of 3mm CAF
gasket; studs / bolts (ASTM A 193 Gr B7) & nuts ( ASTM
Gr 2H) of recommended brands
Supplying & Fixing 150 # CS Butterfly valve with
19 wheel/handle including supplying of 3mm CAF gasket; studs / 2 6 IND
Supplying & Fixing 150 # CS Butterfly valve with
20 wheel/handle including supplying of 3mm CAF gasket; studs / 2 8 IND
Supplying & Fixing 150 # CS Butterfly valve with
21 wheel/handle including supplying of 3mm CAF gasket; studs / 2 12 IND
S/I/C of Level switch top mounted probe type for daughter
S/L/C of 12 core 1.5 sq. mm control cable for mother foam
S/L/C of 12 core 1.5 sq. mm control cable for SOV's (from C/R
S/L/C of 2 core 1.5 sq. mm control cable for SOV's (from JB to
S/L/C of 12 pair 1.5 sq.mm signal cable from C/R to JB for
27 S/L/C of 2 pair 1.5 sq.mm signal cable- JB to Level switch 515 515 RM
S/F of GI cable trays for signal cables & control cables (if no
trays running for existing TAS equipments)
S/I of FLP junction box including glands, blinds, no. of entires,
29 TBs as per the technical specifications mentioned in 4 4 NO
Pipelines supports with PCC for pipeline/SOVs/JBs/cable trays
Structural steel support work pipeline/SOVs/JBs/cable trays
SS foam pipeline & Foam tank painting (epoxy+yellow enamel)
Heavy Scrapping and surface preparation, shall be done by
32 brass wire brush, emery/sand papers etc as instructed by 50 50 M2
Engineer-in-charge.
Supplying and applying primer on the prepared surface
33 including all labour; scaffolding; consumables; equipments; 50 50 M2
Supplying and applying finish paints on the prepared pipe
34 surface including all labour; scaffolding; consumables; 50 50 M2
equipments; primer etc. complete as per specifications
Modifications in Daughter foam tank manhole/ cover for fixing
Fabrication, welding of the supplied 3" SORF (free issue
material by BPCL), 150# on the pipelines / fittings using
approved make / size of welding electrode.(For mounting
level switches on daughter foam tanks)
Fabrication of 3" pipe/stub for fixing level switch on daughter
Supply and fixing of Acrylic tubing for daughter foam tank
level indicator (1/2")
Note: The quantity mentioned above is calculated on theoretical basis and may vary after the completion
of work. However, final payment shall be made based on actual work done at site.
The above services/works including supply, installation, commissioning has to be completed within the
stipulated time period (21 days) as mentioned in the tender documents. Delay in completion of the subject
jobs/ services/ works will be subjected to penalties or even termination of the contract without any prior
PPEs should be worn by contract workmen during work execution.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
12392.pdf
pdf • 0.64 MB
BUDGETDOC_12392.pdf
pdf • 2.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .