| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹33.8 LAccepted-AOC 00 NEAR POLICE POST JIND BYE PASS KAITHAL 136027 | KAITHAL | KAITHAL | HARYANA | 136027 | 1 | Accepted-AOC Work allotted | |
| 2 | 2₹34.1 L+₹38,767.82 (1.15%)Rejected-Finance | 2 | Rejected-Finance Not lowest | |
| 3 | 3₹35.0 L+₹1.2 L (3.65%)Rejected-Finance | 3 | Rejected-Finance Not lowest |
Tender Value
₹30.0 L
EMD Value
₹30,000
Closing Date
19 Apr 2021, 5:00 pmClosed
Executive Engineer Provn Divisn PWD BandR Jind
Executive Engineer Provn Divisn PWD BandR Jind
Construction of Boundary wall in the campus of HAMETI at jind in Jind Distt. (Only for Society)
2021_HRY_166919_1
PWD/Jind/Boundary wall in the campus of HAMETI
Open Tender
Civil Works
Works
90 days
Jind
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹30,000
Yes
Executive Engineer Provn Divisn PWD BandR Jind
26 Jul 2021
31 Mar 2021
20 Apr 2021
31 Mar 2021
19 Apr 2021
31 Mar 2021
15 Apr 2021
Amount
Earth work in excavation in foundations, trenches etc. in all kinds of soil, not exceeding 2 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 Mtrs. (HSR 6.6)
Earth filling under floors with surplus soil excavated from foundation and taken only from outside the building plinth, in 15 cm layers including ramming watering and consolidating lead upto 30 meters. (HSR 6.13 a)
Cement concrete 1:4:8 with stone aggregate 20 mm nominal size in foundation and plinth (HSR 10.38)
Cement concrete 1:2:4 with stone aggregate 20 mm nominal size in first storey upto 4 metres above plinth level (HSR 10.59)
Cement concrete 1:11/2:3 with stone aggregate 20 mm nominal size for reinforced concrete work for walls exceeding 20 cm thickness (straight and curved) beams, girders, stairs, columns, (square or rectangular) battens and lintels etc. excluding steel reinforcement but including centering and shuttering, laid in position complete in all respects. (HSR 10.86 + 10.95 (a))
Cement concrete 1:11/2:3 with stone aggregate 20 mm nominal size for reinforced concrete work in footings, strips, foundations, beams, rafts, pedestals and approach slabs of bridges etc. excluding steel reinforcement and including centering and shuttering, laid in position, complete in all respects. (For works upto 1.5 meters below ground level (HSR 10.90 + 10.95 a)
First class brick work laid in cement sand mortar 1:4 in foundation and plinth (HSR 11.4)
First class brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level (HSR 11.9)
Plastering on wall 12 mm thick cement plaster 1:6 (HSR 15.7)
Providing and applying priming coat with cement primer in all shades on newly plastered or concrete exterior surface. (Note:- First quality paint of reputed make firm such as Goodlass-Nerolac, Berger, Garware, Jenson, Nicholson, Asian & Shalimar Shalimar shall be used as approved by Engineer-in-Charge in writing, Drum of paint shall be opened in presence of Engineer-in-Charge) (HSR 16.25) Through Rate
Finishing walls with exterior decorative cement based paints such as snowcem Robbiacem etc on new work, two coats to give an even shade (HSR 16.61) Through Rate
Providing two coats of exterior acrylic emulsion paint. (Note:- First quality paint of reputed make firm such as Goodlass-Nerolac, Berger, Garware, Jenson, Nicholson, Asian & Shalimar Shall be used as approved by Engineer-in-charge in writing, Drum of paint shall be opened in presence of Engineer-in-charge). [HSR 16.79 (b)]. 1st Quality Through Rate
Providing and applying two coats white cement based putty over plastered surface and grindling the surface smooth with sand paper to get an even and smooth finish including cost and carriage of all material, labour charges, scaffolding, sundries etc. complete. (Note:- reputed make Putty such as J.K./ Birla shall be used as approved by Engineer-in-charge). (HSR 16.81) Through Rate
Steel reinforcement TMT bars FE-550/EQR/FE-500 D grade or more for RCC work, where no included in the complete rate or RCC including straightening, bending, binding wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. and placing in position complete in all respects for all heights/depths/storeys/basements etc. (HSR 18.22) Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps, wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement.
Providing and fixing concertina coil fencing with punched tape concertina coil 600mm dia 10 metre openable length (total length 90 m), having 50 nos. rounds per 6 metre length, upto 3m height of wall with existing angle iron ‘Y’ shaped shaped placed 2.4m or 3.00m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-ibn-charge, with reinforced barbed tape (R.B.T.)/spring core (2.5mm thick) wire of high tensile strength of 165 kg/sq.mm with tape (0.52mm thick) and weight 43.478 gm/metre (cost of M.S. angle, C.C. blocks shall be paid separately) (DSR 16.53)
The Ved Ashri Gate Pindara Ghati Coop LandC Society Ltd
The Khokheri Coop LandC Society Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .