| 1 | L1₹9.0 LAccepted-Finance | L1 | Accepted-Finance OK | |
| 2 | L2₹9.1 L+₹9,460 (1.05%)Accepted-Finance | L2 | Accepted-Finance OK |
Tender Value
₹9.1 L
EMD Value
₹10,000
Closing Date
2 May 2024, 12:00 pmClosed
SE EDC BIJNOR
AVAS VIKAS COLONY, BIJNOR
the work of setting up additional distribution transformer of various capacity under EDD-Ist Chandpur in BP 2024-25
2024_PVVNL_923454_1
94/2023-24/EDC BIJNOR
Open Tender
Electrical Works
Item Rate
90 days
SE EDC BIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC BIJNOR
₹10,000
Yes
14 May 2024
27 Apr 2024
2 May 2024
27 Apr 2024
2 May 2024
27 Apr 2024
Amount
Safe carriage of following material from store center PVVNL to site of work with loading and unloading at both ends.
PCC pole 9 meter long
PCC pole 8.5 meter long
250 KVA transformer
100 KVA transfromer.
63 KVA transfromer.
25 KVA transfromer.
10 KVA transfromer.
11 KV V type X arm
ACSR weasel conductor
LT ABC 3x120 sq.mm.
LT ABC 3x95 sq.mm.
11 KV Disc insulator with fitting
11 KV pin insulator with pin
Earthing set complete (MS earth rod 20x2500 mm and 06 SWG earthing wire etc.)
Stay Rod set complete (Stay rod 16x1800 mm, stay wire 5 Kg 7/10 SWG, stay clamp, bolt and nut with grouting etc.)
M.S. Channel T-off 125x65x1300 mm
M.S. Top channel 125x65x2240 mm.
M.S. Dropper channel 100x50x2028 mm.
Distribution box 3 phase
Transformer base angle 75x75x6x2028 mm with clamp and bolts and nut.
11 KV TPMO set.
11 KV Fuse set.
Erection/Fixing & laying/Installation of following materials as per RESPO manual/Norms and as per direction to Supervising Engineer (complete in all respect). Work includes the cost of labour,T&P by providing 11 KV F-Bracket, X Arm holding clamps, Clamp for 10 KVA TF, Suspension clamp, J-hook clamp, nuts & bolts etc. and all other acessaries/material for proper completion of work.
Double pole structure with PCC Pole 9 mtr with grouting by providing sand, cement and bricks etc. complete work as per RESPO norms.
Double pole structure with PCC Pole 8.5 mtr with grouting by providing sand, cement and bricks etc. complete work as per RESPO norms.
Single line support with PCC 8.5 meter long pole with grouting by providing sand, cement and bricks etc. complete work as per RESPO norms.
11 KV disc insulator with fitting on pole as per norms.
11 KV pin insulator with pin & nut on pole as per norms.
Fixing of dropper channel on pole as per norms.
Filling stone pad in pits for pole as per norms.
Fixing of MS Channel T-off 125x65x1300 mm on pole as per norms.
Fixing of Top channel on pole as per norms.
Earthing of pole by MS Earthing rod of 20x2500 mm and 6 swg earthing wire etc.
Fixing o f11 KV X arm on pole with clamp and nut & bolts.
Fixing of Stay Rod set complete work with concreting by providing sand, cement and bricks etc. complete work as per RESPO norms.
Construction of plinth of size 2x2x1.5 meter by providing fine sand, cement and brick ballast, 1st class bricks, stone ballast 40 mm and all type of material and T&P complete work as per norms.
Safe installation of 250 KVA transformer on plinth, making H.T./L.T. connections and all other work as per norms.
Fencing around 250 KVA transformer plinth by providing MS angle and mesh and and all type of material and T&P complete work as per norms.
Laying, spreading, sagging of ACSR weasel conductor on pole.
Laying, spreading, sagging L.T. AB cable of size 3x120 sq.mm. on pole.
Laying, spreading, sagging L.T. AB cable of size 3x95 sq.mm. on pole.
Fixing of distribution box on pole with clamp nut and bolts. Complete work as per RESPO norms.
Providing and fixing of danger board on double pole at standard height with clamps, nuts & bolts. Complete work as per RESPO norms.
Transformer base angle 75x75x6x2028 mm with clamp and bolts and nut.
Installation of 10 KVA transformer on pole at standard height and making proper connection as per norms.
Installation of 25 KVA transformer on double pole at standard height and making proper connection as per norms.
Installation of 63 KVA transformer on double pole at standard height and making proper connection as per norms.
Installation of 100 KVA transformer on double pole at standard height and making proper connection as per norms.
Installation of 11 KV fuse set on double pole at standard height and making proper connection as per norms.
Installation of 11 KVTPMO set on double pole at standard height and making proper connection as per norms.
Received back of the following material from site of work to store center Bijnor with loading and unloading on both ends.
Weasel scrap
AB cable old and used.
M/S SHRI BALAJI ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .