Loading…
Loading…
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
28 Aug 2026, 9:00 pmClosed
Barrier Protective Coverall
Aluminized Heat Protection Coverall
Disposable Coverall
Chemical Protective Coverall
Back open sleeve apron
Chemical Splash Gown
Apron BIB type standard
Supply & Installation of Cabinet Safety Shower
Supply & Installation of Safety Shower and eyewash SS
Supply & Installation of Safety eyewash
Large Oil Absorbent Roll
Spill Containment Pallet
Chemical Spill Kit 120 Ltrs
Oil Spill Kit 90 Ltrs
Chemical resistant and superior Nitrile Flock lined Chemical Resistant Gloves
Nitrile coated hand gloves cut level 1
Nitrile coated hand gloves cut level 3
Nitrile coated hand gloves cut level 5
Full Sleeve para aramid gloves 12 inch
Full Sleeve para aramid gloves 16 inch
Full Sleeve Nitrile Gloves
Aluminized Heat Protection Gloves Full Sleeved
Heat resistant Kevlar hand gloves
Nitrile Examination Gloves 5.5 mil
Insulating Resue Stick - 45 Kv
Face shield with rachet headband
9725586
GEM/2026/B/7891095
Two Packet Bid
Barrier Protective Coverall,Aluminized Heat Protection Coverall,Disposable Coverall,Chemical Protec
Bengaluru Urban, Karnataka
Item wise evaluation
PRODUCT_CUSTOM
6 documents required · 6 mandatory
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Barrier Protective Coverall | - | - | - |
| Aluminized Heat Protection Coverall | - | - | - |
| Disposable Coverall | - | - | - |
| Chemical Protective Coverall | - | - | - |
| Back open sleeve apron | - | - | - |
| Chemical Splash Gown | - | - | - |
| Apron BIB type standard | - | - | - |
| Supply & Installation of Cabinet Safety Shower | - | - | - |
| Supply & Installation of Safety Shower and eyewash SS | - | - | - |
| Supply & Installation of Safety eyewash | - | - | - |
| Large Oil Absorbent Roll | - | - | - |
| Spill Containment Pallet | - | - | - |
| Chemical Spill Kit 120 Ltrs | - | - | - |
| Oil Spill Kit 90 Ltrs | - | - | - |
| Chemical resistant and superior Nitrile Flock lined Chemical Resistant Gloves | - | - | - |
| Nitrile coated hand gloves cut level 1 | - | - | - |
| Nitrile coated hand gloves cut level 3 | - | - | - |
| Nitrile coated hand gloves cut level 5 | - | - | - |
| Full Sleeve para aramid gloves 12 inch | - | - | - |
| Full Sleeve para aramid gloves 16 inch | - | - | - |
| Full Sleeve Nitrile Gloves | - | - | - |
| Aluminized Heat Protection Gloves Full Sleeved | - | - | - |
| Heat resistant Kevlar hand gloves | - | - | - |
| Nitrile Examination Gloves 5.5 mil | - | - | - |
| Insulating Resue Stick - 45 Kv | - | - | - |
| Face shield with rachet headband | - | - | - |
Exempted
Yes
7 Aug 2026
7 Aug 2026
28 Aug 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9725586.pdf
GEM_BID • 0.27 MB
technical_compliance_statement_2026-08-07-13-59-49_f27fee894ac7ce1e8f1d737aa60d50b9.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-13-59-49_1127504518dc72467fb7b473c371be16.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-02-08_d9344b75fcdbb5067e00a8134db36508.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-02-08_c3ca9db4c90b00f5891c192bcd5a43a6.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-03-35_dcec88351a3067fb1029eb83784a91ae.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-03-35_1a4730ef114a1bee102d5101629f180c.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-05-01_63b5abc72adfd1035c3f53dcd48fc0e7.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-05-01_d6ebfc3ad1e637ec3e9a3be130edbd5b.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-06-40_9dc659e1048c3e7380e18cf37ee77d5e.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-06-40_e095912d58095fa58273573d37a1054c.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-07-59_caf5d9e7dd59f2222d0d07b4d9cc7d29.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-07-59_88229e57070cb0d6bc8425fa597cb9f2.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-09-16_e3e8dc56c768ce7ad9af27e9f5dc69a9.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-09-16_8d324828c802ea62eeaf753518fe8510.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-10-42_57976693c89e9d091e260c0b3d3e14d4.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-10-42_9763a7784ab44d7de74efdb7981efed6.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-12-01_0f7c4d45f73baccb92513e1320a577fb.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-12-01_5284d265ece11c359e42ad140a5650ec.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-13-27_fd2c5ae546a3d35e273fa7c135c0ceb4.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-13-27_5a3367e99f2fda517d93a4037a919d4b.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-14-48_dd344107e8998744207f730e593d765c.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-14-48_18b86eddb7845c9019d6187da9bb131a.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-16-11_ab482facfc380a73c2d4da2e2baa352a.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-16-11_77be8707a72041835a39867698f334df.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-17-28_17abd232163f869e3172a8802b9fd5b7.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-17-28_49a0b3c2918fc4edec1cfc782c87cc15.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-18-59_f9e2a73a63370d12c6ab694cc5004904.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-18-59_454d12fd8bde75133ac62bd9219b19bf.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-20-54_fb03f2fe4db2d92bdd9a2fccd6d08aec.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-20-54_1ab62a382e049718914cd0184bc940a0.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-25-21_eb8dba0fa8e13edff09264e8e9d91369.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-25-21_bc4fb361d7902e3d2b31740d22f1e91c.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-26-49_6942b24099e7ea0be4385eb3490b58d7.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-26-49_533ef8376f14732b325d7432b53ae826.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-28-11_b86dd035426852126ec5b24143316603.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-28-11_d24e328c3e01161ae609ddc31cf9ddab.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-29-27_1feea82b74fa1da4cb52ed179a0f227f.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-29-27_f200c5a08f8024d3e55559b5d643be1a.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-30-41_62c17ae86e9f2672d2f9a5f3e39e8fd1.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-30-41_fbc87b44042e401c538f3fbba479a5bf.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-31-58_5a8523e13ce8efe1f868370b2bb993f5.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-31-58_f5332e8eb4d77f6f4e690aed5a70a6a3.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-33-11_f54fadc1549c3f3a227ef303be08da5f.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-33-11_f752ff427d3de864d3a7f275b7655250.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-36-37_761d091606e115146def58aea1181b0e.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-36-37_93ec832f45f5f6cbc6bef856f1866a11.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-37-56_a11c5fd8ae2873bf0c94c0cc12760c95.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-37-56_496dcfa57ac14a3b60104688ee3c5ecc.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-39-05_36317f425fa8533a6347a05213ab0776.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-39-05_14ddc92f998841e536813a5c4a16d591.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-40-30_e5eb467a6ff633477d708c2571737693.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-40-30_b388fb3031acab9af442d3a6a208308d.pdf
GEM_SPEC • 12.55 MB
technical_compliance_statement_2026-08-07-14-41-49_4441ccbed872ada0b5b40f57770392ce.pdf
GEM_SPEC • 0.51 MB
additional_technical_specification_2026-08-07-14-41-49_83939a20dbdd4cc63c7523d1283f3837.pdf
GEM_SPEC • 12.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-13-59-49_07e3bd06299903a9938fe177ffa380ce.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-13-59-49_dc08ba0ec0b8771973c2894b704e2663.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-02-08_9cce9f2aabd94d0dc81ae2884d5ec11c.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-02-08_c84805b4cb2be7397962cd54858c3be3.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-03-35_0195d713d92b177aec36f0e0ce429a22.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-03-35_a5cf072540f16ba315307f4e45e84ce5.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-05-01_4dd3eb3ecd44f4ddf0512908cf1d041e.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-05-01_016a6724cd4c811097b9ac683194d4f2.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-06-40_5d2fdac256c440143d78aa09b4ff094b.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-06-40_908206e2ea1e5745a8ca64ba6fee1dbb.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-07-59_ca13f346e00f66ba9123d42350dfd1aa.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-07-59_13a7495b0c1c777ec61d75513d525fd8.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-09-16_4c3b33fefa75d150592c7322a40eb604.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-09-16_f33b42dc014a0ca18324a0c23dca409a.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-10-42_16370c3f7a88080ec33b7391e360c0f4.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-10-42_74d8fe8f4e8bb0a562ca15fc7b45cbcf.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-12-01_dd2d3a9c1fa550a212d4f05956583b04.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-12-01_e4fcdadb9306881bb6246b2e7d017508.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-13-27_d4bd607d4a59a0e1125b666d7d8c1cb1.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-13-27_f5b17fdb70abdde152bedf4a54ddf31f.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-14-48_e8bcc7494c8fe3a75591d815fb5577e1.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-14-48_02c6fa95817df5e3fc81dcd0b4f76172.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-16-11_fcfbfb92c019c930124328d6d4f5c373.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-16-11_847f7e145fcb747188419d79e17217e4.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-17-28_ab89b0a8051776c3c55081a5a9807b5d.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-17-28_96192c55c54a2e58769c1ee33b4db74c.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-18-59_227edf4c41c37bc82d60b5726b811168.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-18-59_d5ef1511a2effdf04871eb325030b205.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-20-54_6d15bc3bb7b357885b40e2566a410c04.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-20-54_5ffcec3740168c9dec7015f321f9f7cf.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-25-21_fd88a9f030255790157d52df10285f78.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-25-21_00464cf95a3156f8fd6d80da85b24d01.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-26-49_2293aa9e219307ddbb986de27c0fc43c.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-26-49_889fc254564642f3c44ba79bce561ebb.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-28-11_fe5f0119b735f1edf5d51aaf6d6126ab.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-28-11_fc18fba87ff69048381f46c0e26291b2.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-29-27_d0de8afb8567e00f2b810df70ed93a78.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-29-27_b93ebc59b75106ca0ca5e890089d6671.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-30-41_b05e9c52dddeb1da8f4574b10b562a15.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-30-41_c3d8b008d2b067edaae3c1e8f5bdeab1.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-31-58_df5772c4ed0244d88dfca4254a086a68.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-31-58_c46f0bcd7f3ef262f18ecc381425ce57.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-33-11_e702ba206c4edfb843bbac5d2222d9f9.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-33-11_d038afcaafe76044cc8d897aefe1c8c5.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-36-37_69feb4dcac7fe719bfca29c20f102009.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-36-37_23344bfa485c3ad84f8e3bf28d25a9dd.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-37-56_d8090ee6fd2d3e8009f7dca5a205a3f7.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-37-56_932b3688dbbbb6387ae8005d1d3f9c40.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-39-05_7b405c5b61662d278a42942508b86813.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-39-05_689dd8253fe8149bdc19ef98d3c4d6e3.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-40-30_bd2369fee7b8473511aa7a31e7bccd1f.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-40-30_484ee85dc34e40584c1d012fa457ed8d.pdf
GEM_OTHER • 0.55 MB
1a_-_annexure-a_tender_terms_and_conditions_2026-08-07-14-41-49_dd31151770c95feedf594a971012a71a.pdf
GEM_OTHER • 0.78 MB
tender_notice_2026-08-07-14-41-49_669d6bd6f4c7f17ea26e67843c354fd6.pdf
GEM_OTHER • 0.55 MB
1786098818.pdf
GEM_OTHER • 0.75 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].