| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | ₹5.6 L Quoted ₹3.4 L | L1 | Accepted-AOC Financial bid is accepted at the price Rs 564720.80 the Employer |
| 2 | L2₹3.7 LRejected-Finance MOH DAULATPUR NEAR LAKDI MANDI MISHRIKH SITAPUR | SITAPUR | UTTAR PRADESH | 261001 | ₹3.7 L | L2 | Rejected-Finance Being higher rate rejected |
Tender Value
Refer Docs
EMD Value
₹52,000
Closing Date
25 Mar 2026, 12:00 pmClosed
Executive Engineer PD PWD Sitapur
Office of the Executive Engineer PD PWD Sitapur
Work of construction of non-residential building and toilet for disabled people of Superintending Engineer Sitapur Kheri Circle PWD Sitapur in Sitapur district.
2026_CEUCZ_1127379_1
823/E.TENDER/25-26 Dt. 10.03.2026
Open Tender
Civil Works - Buildings
60 days
SITAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹860
₹52,000
Yes
Office of the Executive Engineer PD PWD Sitapur
4 May 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by engineer in charge. All kinds of soil 0 to 0.30 m | |||||
| 2earth filling by Available earth | |||||
| 3Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | |||||
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | |||||
| 5Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | |||||
| 6Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | |||||
| 7Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 8Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil. | |||||
| 9Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the coloumn pitswall tench basement excavation top surface if plinth filling junction of wall and floor along the external perimer of binding expansion joints,surrounding of pipes and conduits etc.complete(plinth area of the building at ground floor only shall be measured as per I.S.6313(Part ll 1981) aldrine emulsifiable concrete or any other approved material such as hepthachlor or chlordance will be used.The rate of application of chemical emulsion shall be as follows:- (1)treatment for masonary & foundation 5 litres per sq.m. (2)back fill in immediate contract with foundation 7.5 litre per sq.m (3)treatment of top surface of plinth filling 5 liters per sq.m. (4)treatment of soil along external parameter of building 7.50 lire per sqm. (For payment plinth area to be measured as per IS Code). Brick Work with common burnt clay ( non modular) bricks of class - 150 in foundation and plinth in: Cement mortar 1:6 ( 1 cement : 6 coarse sand) | |||||
| 10Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the coloumn pitswall tench basement excavation top surface if plinth filling junction of wall and floor along the external perimer of binding expansion joints,surrounding of pipes and conduits etc.complete(plinth area of the building at ground floor only shall be measured as per I.S.6313(Part ll 1981) aldrine emulsifiable concrete or any other approved material such as hepthachlor or chlordance will be used.The rate of application of chemical emulsion shall be as follows:- (1)treatment for masonary & foundation 5 litres per sq.m. (2)back fill in immediate contract with foundation 7.5 litre per sq.m (3)treatment of top surface of plinth filling 5 liters per sq.m. (4)treatment of soil along external parameter of building 7.50 lire per sqm. (For payment plinth area to be measured as per IS Code). G.F. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 0.67 MB
BOQ_2102722.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid