Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.2 LAccepted-AOC AT LAMTIBAHAL BRAJRAJNAGAR DIST JHARSUGUDA 768216 | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768216 | L-1 | Accepted-AOC L-1 BIDDER | |
| 2 | L-2₹2.6 L+₹37,903.81 (16.9%)Rejected-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | L-2 | Rejected-Finance L-2 BIDDER |
Tender Value
₹3.2 L
EMD Value
₹4,000
Closing Date
7 Dec 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
STAFF OFFICER(C),IB VALLEY AREA
SO(C), IB VALLEY AREA, MCL AT PO BRAJRAJNAGAR DIST JHARSUGUDA ODISHA. MOB NO 7632016882
Enumeration of trees on the western side of SOCP mines under IB Valley Area (1st Retender)
2023_MCL_294362_1
MCL/GM/IBV/SOC/2023-24/35 dt. 22.11.2023
Open Tender
Civil Works - Others
Item Rate
60 days
SOCP, IB VALLEY AREA
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
Yes
26 Dec 2023
22 Nov 2023
9 Dec 2023
23 Nov 2023
7 Dec 2023
23 Nov 2023
23 Nov 2023 - 26 Nov 2023
Amount
Enumeration of trees including chopping all round of trees the girth beyond 300 mm
Letter Writing and painting on trees with yellow colour Coat I/C all Labour & Materials etc complete Ref 143/195, P-181/209 Respectively of CPWD VOL III( 5000x0.20x0.150)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
RAJESH KUMAR
techsummary_304887.pdf
PDF • 0.11 MB
finsummary_304887.pdf
PDF • 2.11 MB
LOA-35.pdf
PDF • 0.40 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .