| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹33.7 LAccepted-AOC MOHSINPUR MANSURPUR AKBARPUR AMBEDKAR NAGAR | ₹33.7 L | L-1 | Accepted-AOC L1 |
| 2 | L-2₹33.8 L+₹17,095.39 (0.51%)Rejected-AOC BHADOHI | UTTAR PRADESH | 221301 | ₹33.8 L+₹17,095.39 (0.51%) | L-2 | Rejected-AOC L2 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
13 Mar 2024, 3:00 pmClosed
SUPERINTENDING ENGINEER XVTh Circle Irrigation Wor
SUPERINTENDING ENGINEER XVTh Circle Irrigation Work Gonda (U.P.)
Construction of V.R.B (R.C.C Box culvert) at km 67.850 of Tarabganj Branch
2024_UPIDC_912908_1
08/SE/2023-24
Open Tender
Civil Works
Item Rate
270 days
Construction of V.R.B (R.C.C Box culvert) at km 67
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹70,000
Yes
22 Aug 2024
7 Mar 2024
13 Mar 2024
7 Mar 2024
13 Mar 2024
7 Mar 2024
Amount
Earth work in making diversion including all lead& lift,with manual compaction and dressing to profile.
Earth work in excavation of foundation in all type of soil with all lead ,lift & proper disposal of earth and back filling etc. required for proper completion of the work.
Centering & shuttering for R.C.C. Work including cost of materials, upto 3M Span
Laying C.C. 1:3:6 in foundation with 20-40 mm size Stone ballast & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Laying C.C. in 1:2:4 with 4.75 to 20 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Laying R. C.C. in 1:1:2 (M-25) in wall & slab with 4.75 to 20 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
1st class Brick work in 1:4 CM with Ist class bricks and coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
S/F of 100 mm dia ( Length = 0.50 m)drainage spout pipe including cost of material, labour & T&P required for proper completion of the work.
Cutting, bending, binding and placing steel reinforcement including cost of binding wire and cost of steel, labour,T&P etc. required for proper completion of the work.
S/Laying stone boulder 20-40 kg including cost all material ,carriage up to site ,loading unloading ,staking etc. required for proper completion of the work.
E/W In exacavation for correcting of internal section & removing Diversion with all type of soil including all lead & lift , manual compaction for complete work
Laying C.C. in 1:1:2 (M-25) in Wearing Coat with 4.75 to 10 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Boring with 15 cm casing pipe including lowering of assembly and extracting casing pipe with contractors,cost of pipe , labour T& P and equipment up to 10 m.
Hirring diesel pump 5.0 HP including operator and P.O.L. for running hours including maintenance also
M/S KRISHNA CONSTRUCTION
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .