Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 CrAdmitted-Finance | ₹13.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹14.0 Cr+₹69.0 L (5.16%)Admitted-Finance | ₹14.0 Cr+₹69.0 L (5.16%) | L2 | Admitted-Finance |
| 3 | L3₹15.6 Cr+₹2.2 Cr (16.5%)Admitted-Finance 184 MAIN STREET NASIRABAD AJMER RAJASTHAN 305601 | ₹15.6 Cr+₹2.2 Cr (16.5%) | L3 | Admitted-Finance |
| 4 | L4₹15.9 Cr+₹2.6 Cr (19.2%)Admitted-Finance 11 JAMES HICKEY SARANI 2ND FLOOR KOLKATA 700069 | KOLKATA | KOLKATA | WEST BENGAL | 700069 | ₹15.9 Cr+₹2.6 Cr (19.2%) | L4 | Admitted-Finance |
| 5 | L5₹16.3 Cr+₹2.9 Cr (21.9%)Admitted-Finance PARISHRAM MADAN MAHAL CHOWK NAGPUR ROAD JABALPUR 248001 | JABALPUR | DEHRADUN | UTTARAKHAND | 248001 | ₹16.3 Cr+₹2.9 Cr (21.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SKB Project India Private Limited L2 | SATYA PRAKASH BUILDERS LTD L5 | Narayandas Phoolchand Mishra Infrastructures Pvt. Ltd. L7 | M/S.J.BIJAYA KUMAR PATRO L8 | D R STEEL CONSTRUCTION COMPANY PRIVATE LIMITED L4 | Agarwal Jagdish Construction Company Private Limited L3 | Umang Infrastructure L1 | CMRGS Infrastructure Projects Ltd L6 | SNG BUILDERS AND ENGINEERS L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the tenderer) | ||||||||||||
| 2.00 | Item No 01 : Design (Architechtural, structural drawings) and Construction of New Buildings of Adm office for GEs & CWE Jabalpur (G+3 Storey) including Parking complete all as shown in Line Plan drawings and all as specified in soil bearing capacity report, design basis report, Schedule of Finishe and tender documents. | 1 | Lump sum | 9,46,00,000 ₹9,46,00,000 | 10,87,00,000 ₹10,87,00,000 | 10,50,00,000 ₹10,50,00,000 | 10,70,00,000 ₹10,70,00,000 | 7,40,49,170.12 ₹7,40,49,170.12 Lowest | 9,80,00,000 ₹9,80,00,000 | 7,71,00,000 ₹7,71,00,000 | 11,00,00,000 ₹11,00,00,000 | 13,65,00,000 ₹13,65,00,000 |
| 3.00 | Item No 02 : Design (Architechtural, structural drawings) and Construction of Sub station Buildings complete all as shown in Line Plan drawings and all as specified in soil bearing capacity report, design basis report incl tender documents. | 1 | Lump sum | 15,06,960 ₹15,06,960 Lowest | 21,00,000 ₹21,00,000 | 40,50,000 ₹40,50,000 | 40,70,000 ₹40,70,000 | 2,06,00,000 ₹2,06,00,000 | 20,00,000 ₹20,00,000 | 21,54,025 ₹21,54,025 | 40,00,000 ₹40,00,000 | 25,00,000 ₹25,00,000 |
| 4.00 | Item No 03 : Construction of Sentry Box Bldg complete all as per shown in TD drawing incl with tender documents. | 3 | Lump sum | 1,35,000 ₹4,05,000 Lowest | 2,87,000 ₹8,61,000 | 15,60,000 ₹46,80,000 | 17,60,000 ₹52,80,000 | 2,45,000 ₹7,35,000 | 7,50,000 ₹22,50,000 | 20,00,000 ₹60,00,000 | 15,00,000 ₹45,00,000 | 3,00,000 ₹9,00,000 |
| 5.00 | Item No 04 : Design (Architechtural, structural drawings) and Construction of Gate office cum night duty room Bldg complete all as shown in Line Plan drawings and all as specified in soil bearing capacity report, design basis report incl tender documents. | 1 | Lump sum | 7,52,000 ₹7,52,000 | 7,70,000 ₹7,70,000 | 30,68,000 ₹30,68,000 | 30,65,000 ₹30,65,000 | 1,05,10,000 ₹1,05,10,000 | 5,00,000 ₹5,00,000 Lowest | 60,00,000 ₹60,00,000 | 30,00,000 ₹30,00,000 | 12,51,000 ₹12,51,000 |
| 6.00 | Item No 04A : Design of RCC underground water sump of Cap 50000 Lit having approx 5 m dia and all other dimensions matching with capacity all as specified and directed by GE. Note: (a) Sufficient Nos of opening on semi circular top with cover.
(b) SS ladder provided for internal approch up to bottom
(c) Water proofing treatment as per relevant IS Code
(d) Design as per relevant IS Code duly vetted from IIT and accepted by Rep of CE Jabalpur Zone. | 1 | Lump sum | 7,50,000 ₹7,50,000 Lowest | 8,17,000 ₹8,17,000 | 15,68,000 ₹15,68,000 | 15,65,000 ₹15,65,000 | 12,55,000 ₹12,55,000 | 25,00,000 ₹25,00,000 | 7,57,300 ₹7,57,300 | 15,00,000 ₹15,00,000 | 8,10,000 ₹8,10,000 |
| 7.00 | Item No 04B : Construction of incinerator complete all as per shown in TD drawings incl with tender documents. | 1 | Lump sum | 90,000 ₹90,000 | 5,00,000 ₹5,00,000 | 1,05,000 ₹1,05,000 | 1,05,700 ₹1,05,700 | 1,15,000 ₹1,15,000 | 1,80,000 ₹1,80,000 | 54,200 ₹54,200 | 1,00,000 ₹1,00,000 | 51,000 ₹51,000 Lowest |
| 8.00 | Sch 'A' Part-II (External Electric supply) Lump sum price worked out by the contractor for (External Electric supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | 28,81,103.27 ₹28,81,103.27 Lowest | 37,00,000 ₹37,00,000 | 35,00,000 ₹35,00,000 | 35,07,000 ₹35,07,000 | 37,00,000 ₹37,00,000 | 37,99,257.06 ₹37,99,257.06 | 31,00,000 ₹31,00,000 | 30,00,000 ₹30,00,000 | 44,95,788 ₹44,95,788 |
| 9.00 | Sch 'A' Part-III (External Water supply) Lump sum price worked out by the contractor for (External Water supply) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | 1,22,200.89 ₹1,22,200.89 | 1,51,070 ₹1,51,070 | 1,15,000 ₹1,15,000 | 1,15,700 ₹1,15,700 | 1,10,654.36 ₹1,10,654.36 | 1,25,087.53 ₹1,25,087.53 | 96,000 ₹96,000 Lowest | 1,00,000 ₹1,00,000 | 1,16,428 ₹1,16,428 |
| 10.00 | Sch 'A' Part-IV (Road Path Culvert) Lump sum price worked out by the contractor for (Road Path Culvert) as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum | 35,31,314.24 ₹35,31,314.24 Lowest | 41,70,000 ₹41,70,000 | 41,60,000 ₹41,60,000 | 41,67,000 ₹41,67,000 | 46,14,785.67 ₹46,14,785.67 | 46,14,785.66 ₹46,14,785.66 | 40,00,000 ₹40,00,000 | 40,00,000 ₹40,00,000 | 46,14,786 ₹46,14,786 |
Tender Value
₹13.8 Cr
EMD Value
₹10.2 L
Closing Date
29 Aug 2026, 6:00 pmClosed
Chief Engineer Jabalpur Zone
HQ Chief Engineer Jabalpur Zone Ridge Road Jabalpur Cantt 482001
PROVN OF ADM BLOCK FOR HQ CWE AND GE(W) IN JABALPUR MIL STATION
2026_MES_756665_1
753041 A PROVN OF ADM BLOCK FOR HQ CWE AND GE W IN JABALPUR MIL STATION
Open Tender
Civil Works
Lump-sum
365 days
JABALPUR
AS PER NIT
8 documents required · 8 mandatory
₹3,000
GE (P) 01 Jabalpur
₹10.2 L
Yes
18 Sept 2026
30 Mar 2026
5 Sept 2026
30 Jun 2026
29 Aug 2026
22 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the tenderer) | |||||
| 2Item No 01A : Design and Construction of Adm office for GEs & CWE JBP (G+3 Storey) including Parking complete all as specified in soil bearing capacity report, design basis report, drawings and tender documents. | |||||
| 3Item No 02 : Design and Construction of Sub Station Building complete all as specified in soil bearing capacity report, design basis report, drawings and tender documents. | |||||
| 4Item No 03 : Design and Construction of _______________________ complete all as specified in soil bearing capacity report, design basis report, drawings and tender documents. | |||||
| 5Item No 04 : Design and Construction of _________________________complete all as specified in soil bearing capacity report, design basis report, drawings and tender documents. | |||||
| 6Sch 'A' Part-II (External Electric supply) Lump sum price worked out by the contractor for (External Electric supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | |||||
| 7Sch 'A' Part-III (External Water supply) Lump sum price worked out by the contractor for (External Water supply) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | |||||
| 8Sch 'A' Part-IV (Road Path Culvert) Lump sum price worked out by the contractor for (Road Path Culvert) as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | |||||
| 9Sch 'A' Part-V (Sewage Disposal) Lump sum price worked out by the contractor for (Sewage Disposal) as listed in Schedule 'A' Part-V against the lump sum price inserted by the MES. | |||||
| 10Sch 'A' Part-VI (Area Drainage) Lump sum price worked out by the contractor for (Area Drainage) as listed in Schedule 'A' Part-VI against the lump sum price inserted by the MES. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.81 MB
BOQ_848880.xls
BOQ • 4.21 MB
1Tender.pdf
Tender Documents • 8.14 MB
C13.pdf
PDF • 0.10 MB
C12.pdf
PDF • 0.10 MB
drgs_CEJZ-JA-EPC-867- SHT NO 1R-4.pdf
PDF • 0.19 MB
drgs_CEJZ-JA-EPC-867- SHT NO 2R-4.pdf
PDF • 0.19 MB
drgs_CEJZ-JA-EPC-867- SHT NO 3R-4.pdf
PDF • 0.17 MB
drgs_CEJZ-JA-EPC-867- SHT NO 4A-4.pdf
PDF • 0.17 MB
drgs_CEJZ-JA-EPC-867- SHT NO 4R-4.pdf
PDF • 0.17 MB
drgs_CEJZ-JA-EPC-E&M-867-SHT NO 4A-4.pdf
PDF • 0.13 MB
drgs_CEJZ-JA-EPC-SOF-867- SHT NO 1-3.pdf
PDF • 0.41 MB
drgs_CEJZ-JA-EPC-SOF-867- SHT NO 2-3.pdf
PDF • 0.41 MB
drgs_CEJZ-JA-EPC-SOF-867- SHT NO 3-3.pdf
PDF • 0.40 MB
drgs_CEJZ-JA-EPC-SOF-867- SHT NO 3A-3.pdf
PDF • 0.35 MB
drgs_CEJZ-LIST-EPC-247- SHT NO 1R-1.pdf
PDF • 0.35 MB
drgs_CEJZ-TD-002-2026- SHT NO 1-1.pdf
PDF • 0.73 MB
C9.pdf
PDF • 0.10 MB
C8.pdf
PDF • 0.10 MB
C7.pdf
PDF • 0.10 MB
C6.pdf
PDF • 0.11 MB
C5.pdf
PDF • 0.11 MB
753041.pdf
PDF • 0.18 MB
c3_drawing.pdf
PDF • 3.76 MB
753041.pdf
PDF • 0.18 MB
753041_01.pdf
PDF • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .