| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC 1191 ARDEVOK ROAD BARASAT 24 PGS N KOL 700125 | BARASAT | NORTH 24 PARGANAS | WEST BENGAL | 700125 | L1 | Accepted-AOC AOC | |
| 2 | L2₹6.2 L+₹20,099.87 (3.35%)Rejected-Finance BID ID 6511296 | L2 | Rejected-Finance QUOTED HIGER THAN L1 | |
| 3 | L3₹6.3 L+₹30,599.80 (5.10%)Rejected-Finance 87 31 BOSEPUKUR ROAD KOLKATA 700042 | KOLKATA | KOLKATA | WEST BENGAL | 700042 | L3 | Rejected-Finance QUOTED HIGER THAN L2 |
Tender Value
₹6.0 L
EMD Value
₹12,000
Closing Date
13 Feb 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
OFFICE OF EE(CIVIL)
THE KOLKATA MUNICIPAL CORPORATION 97 AND 98 GARFA MAIN ROAD
DEVELOPMENT AND BEAUTIFICATION OF PATHWAY AND FENCING AROUND A POND IN 7 NO. MUKUNDAPUR IN WARD NUMBER 109 UNDER JADAVPUR AC.
2026_KMC_999135_1
KMC/DG(C)/BR-XII/109/050/25-26
Open Tender
CIVIL WORKS
Percentage
120 days
BOROUGH XII
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹12,000
14 Nov 2026
4 Feb 2026
16 Feb 2026
4 Feb 2026
13 Feb 2026
4 Feb 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 8. Pumping out water from ponds or tanks .(Payment if permitted will be made on the quantity of water calculated on the basis of initial water level and final level on consideration being made for any water that may have been added through percolation or otherwise). | 1,170 | %M3 | 10.44 | ₹12,214.8 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 31.68 | %M3 | 119.27 | ₹3,778.47 |
| 3 | Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. (Diameter of pile to be measured at a distance of 1.5m from the thicker end.) (iii) 150mm diameter ( Ref :PWD (Rds & Brdgs)- 2018, Page No. 334, It. No. 18.18) | 640 | MTR | 217 | ₹1,38,880 |
| 4 | Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (iii) 150mm diameter ( Ref :PWD (Rds & Brdgs)- 2018, Page No. 334, It. No. 18.17) | 640 | MTR | 105 | ₹67,200 |
| 5 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-4) | 1.15 | M3 | 1,172.6 | ₹1,348.49 |
| 6 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | 11.52 | SQM | 361 | ₹4,158.72 |
| 7 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10) | 2.42 | M3 | 4,761 | ₹11,521.62 |
| 8 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%. | 58.61 | SQM | 335 | ₹19,634.35 |
| 9 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 58.61 | SQM | 24 | ₹1,406.64 |
| 10 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.I. SAIL/ TATA/RINL. | 710.41 | MT | 58.25 | ₹41,381.38 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
FORM-109_50.pdf
Tender Documents • 0.58 MB
BOQ_2446889.xls
BOQ • 0.30 MB
PREQUE.pdf
Additional Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .