Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
7 Jul 2026, 3:00 pmDue tomorrow
Superintending Engineer, IVth Circle Irrigation Wo
Office of the Superintending Engineer, IVth Circle Irrigation Works, Jhansi
LOT-1, Restoration of Jalaun Inspection House under Betwa Canal Division-I, Orai, District Jalaun
2026_UPIDC_1164587_1
02/SE-IV/2026-27
Open Tender
Civil Works
330 days
Jalaun
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,320
₹2.3 L
30 Jun 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old and damaged brick / stone masony and plain concrete with lime or cement motar for proper completion of work as per direction of Engineer-in-Charge. | 40 | Cum | 469.2 | ₹18,768 |
| 2 | Dismantling rainforcement cement concrete or reinforcement brick work, including stacking of materials as directed by Engineer-in-Charge with in a distance of 60 mt. (200 feet) | 19.81 | Cum | 966 | ₹19,136.46 |
| 3 | Earth work in Mar ranker and kankar mixed soil in digging foundation including lead up to 30.00m and lift upto 1.50 m with manual compaction and dressing . | 492.33 | Cum | 108.2 | ₹53,270.11 |
| 4 | Providng and Laying of Brick Rora /Brick Bats in Foundation i/c all labour, material and T&P etc. complete. | 86.5 | Cum | 2,006.85 | ₹1,73,592.53 |
| 5 | Laying & spreading of Local sand in foundation for proper completion of work as per direction of Engineer-in-Charge. | 196.41 | Cum | 2,370 | ₹4,65,491.7 |
| 6 | Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. | 80.4 | Cum | 5,141.07 | ₹4,13,342.03 |
| 7 | Providing & laying Reinforced Cement Concrete (M20) 1:1.5:3 (1 cement :1.5 coarse sand : 3 Aggregate) with cement coarse sand and stone grit 20mm gauge including proper curing and compaction including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 230 | Cum | 7,005.18 | ₹16,11,191.4 |
| 8 | Cenetering & shuttering for Reinforced Cement Concrete work including cost of shuttering, material, Labour, T&P etc required for proper completion of work as per ID specification & direction as per Engineer-in -charge. | 1,406.62 | SQM | 939.6 | ₹13,21,660.15 |
| 9 | Providing and Laying Steel reinforcement(Fe-500) including cutting, bending, binding & placing in position including cost of all material, Labour T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 16.04 | M.T. | 74,616.35 | ₹11,96,846.25 |
| 10 | Brick work (M-150) with 1:4 cement motar including all cost material labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 184.71 | Cum | 6,095 | ₹11,25,807.45 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.24 MB
02SEIVNIT2026-27.pdf
Tender Documents • 2.78 MB
BOQ_2183820.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid