Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC R O VILLAGE CHAMERA P O RAWLAKIAR TEHSIL KOTKHAI DISTT SHIMLA H P | SHIMLA | HIMACHAL PRADESH | 171001 | ₹11.8 L Quoted ₹12.1 L | L1 | Accepted-AOC Lowest bidder to awarded the work |
| 2 | L2₹12.3 LRejected-Finance | ₹12.3 L | L2 | Rejected-Finance L2 bidder |
Tender Value
Refer Docs
EMD Value
₹11,800
Closing Date
20 Mar 2026, 10:00 amClosed
Executive Engineer
HPPWD DIVISION KOTKHAI
R/R Damages on Gumma Pujali Baghi Road Km 0/00 to 28/500 C/o R/wall at RD 7/314 to 7/324 and B/wall in wire crate and PCC at RD 7/675 to 7/690 and 7/690 to 7/720
2026_PWD_131256_28
PW-KD-E-Tender/25-26-15042-47 dated 5-3-2026
Open Tender
Civil Works - Roads
45 days
Kalbog
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
₹11,800
9 Jun 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads , dressing of sides and bottom and back filling in trenches with excavated suitable material in ordinary soil upto all depth. as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Providing and laying in position cement concrete of specified grade including the cost of form work in R/walls 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
Providing & making Gabion structure with mechanically woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012 ,MORTH Clause 2500, of requred size, Mesh Type 10x12 (D=100mm with tolerance of = 2%) Zinic+coated, Mesh wire diameter 2.7/3.7mm, Mechanically edged/selvedged with paritions at every 1 m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm (ID/OD), supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing , all complete as per direction of Engineer-in-charge.
Providing weep holes in brick/ stone / plain reinforced concrete abutment, wing wall, return walls with 100 mm dia PVC pipe extending through the full width of the structure with slope of 1V : 20H towards drawing face complete as per drawing and technical specifications clauses 614, 709 and 1204.3.7 including carriage of material within all leads and lifts and other incidentals. including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 with granular material. including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
22.pdf
Tender Documents • 4.66 MB
BOQ_194314.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid