Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,900
Closing Date
30 Sept 2026, 6:00 pm2d left
Executive Engineer
Jal Shakti (PHE) Division Doda
Repairing of Water Scheme Thub Nalla to Dewal Jodhpur A under DDC Grant District Capex Budget (JKSSR 2022).
2026_PHE_322944_27
e-NIT No. EE/JS(PHE)D/D/12 of 08/2026-27
Open Tender
Civil Works
Percentage
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Yes
Executive Engineer
₹5,900
25 Sept 2026
25 Sept 2026
1 Oct 2026
25 Sept 2026
30 Sept 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: in all kind of Soil. | 44.1 | Cum | 479.3 | ₹21,137.13 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: in ordinary Rocks | 18.9 | Cum | 924.8 | ₹17,478.72 |
| 3 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 70% All kinds of soil : 30% Ordinary Rock | 6.75 | Cum | 612.95 | ₹4,137.41 |
| 4 | Providing and fixing HDPE . pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) a) 63mm dia. nominal bore | 300 | mtr | 219 | ₹65,700 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.45 | Cum | 5,202.9 | ₹2,341.31 |
| 6 | Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (new work) a)50mm nominal bore | 4 | each | 611.25 | ₹2,445 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 11.25 | Cum | 6,591.25 | ₹74,151.56 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 100 | kg | 123.2 | ₹12,320 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 15 | sqm | 286.35 | ₹4,295.25 |
| 10 | Providing Steel rope Crossing including cost of steel Rope 20mm dia ,U Champ ,iron Clamp/hooks ,labour charges for stretching the steel rope in position,hire charges of chain pulley along with the operator ,laying and fitting of Gi pipes all complete job | 56 | mtr | 750 | ₹42,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_1102429.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .