Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC VILLAGE BUDMAJRA NEAR BALONGI SALES TAX BARRIER DISTRICT MOHALI PUNJAB | MOHALI | MOHALI | PUNJAB | ₹1.1 Cr | L1 | Accepted-AOC Being L1 firm |
| 2 | L2₹1.2 Cr+₹2.1 L (1.88%)Rejected-AOC 155 SHAMPURA COLONY BELA ROAD RUPNAGAR 140001 | RUPNAGAR | RUPNAGAR | PUNJAB | 140001 | ₹1.2 Cr+₹2.1 L (1.88%) | L2 | Rejected-AOC Being L2 firm |
| 3 | L3₹1.1 Cr+₹1.2 L (1.04%)Rejected-AOC FLAT NO 10 2ND FLOOR SODDHI TERRECSES RAYKAR NAGAR DHAYARI PUNE 411041 | PUNE | PUNE | MAHARASHTRA | 411041 | ₹1.1 Cr+₹1.2 L (1.04%) | L3 | Rejected-AOC Being L3 firm |
| 4 | L4₹1.2 Cr+₹4.3 L (3.80%)Rejected-AOC 1 VISHVAS NAGAR GONIANA ROAD P O NFL BATHINDA 151 003 | BATHINDA | BATHINDA | PUNJAB | 151003 | ₹1.2 Cr+₹4.3 L (3.80%) | L4 | Rejected-AOC Being L4 firm |
| 5 | Not Admitted-Fee/PreQual/Technical KRIPA BHAWAN SALT LAKE SECTOR V EP BLOCK PLOT NO Y20 KOLKATA WEST BENGAL 700091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
1 Jun 2021, 11:30 amClosed
Dy. Chief Engineer/EMC/O and M
GHTP, Lehra Mohabbat
main plant area, 16.50 KV, 15.75 KV, 6.6 KV and 415 V Bus ducts, EOT Cranes/ Hoists (Electrical Works) and/or etc. and operation and general cleanliness of Lifts/ Elevators of GHTP Stage-I an II as per detailed scope mentioned in tender specification
2021_POWER_63765_1
539/GHTP/EMC/GMMC/27 VOL-33
Open Tender
Power/Energy Projects/Products
Tender cum Auction
365 days
Dy. Chief Engineer/EMC/OandM, GHTP, Lehra Mohabbat
Firms should have valid registration for bid participation
2 documents required · 2 mandatory
₹2,360
₹3 L
Yes
8 Jul 2021
15 Apr 2021
3 Jun 2021
15 Apr 2021
1 Jun 2021
15 Apr 2021
Periodical, preventive, breakdown and shutdown maintenance and annual overhauling of 2x210MW & 2x250MW Turbogenerator (Electrical Works), HT & LT Motors in main plant area, 16.50 KV, 15.75 KV, 6.6 KV & 415 V Bus ducts, EOT Cranes/ Hoists (Electrical Works), etc. and operation & general cleanliness of Lifts/ Elevators of GHTP Stage-I & II as per detailed scope mentioned in Tender Specifications (Section-VIII).
On lump-sum basis at GHTP, Lehra Mohabbat as per scope of work , considering any one unit running and keeping balance three units available for running as and when required
On lump-sum basis at GHTP, Lehra Mohabbat as per scope of work for running of all the four units
CHOPRA ENGINEERING WORKS
M/S SODHI ERECTORS
Gill Engineering Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .