Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.6 L+₹10,156.69 (6.74%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.7 L+₹22,234.37 (14.8%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹1.7 L+₹23,092.68 (15.3%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹1.8 L+₹31,737.10 (21.1%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹4,100
Closing Date
18 Jul 2026, 2:00 pmClosed
Executive Engineer
Office of the Executive Engineer Mechanical and Hospital Division Anantnag
Repairs and Maintenance of boundary wall of Sub Divisional Office at Mechanical and Hospital Division Anantnag.
2026_PWDJK_315551_1
MHDA/TS/2026-27/24
Open Tender
Miscellaneous Works
Percentage
10 days
Mechanical and Hospital Division Anantnag
Refer NIT
6 documents required · 6 mandatory
₹200
Accounts Officer M and H Engg. Deptt. Kashmir
₹4,100
29 Jul 2026
11 Jul 2026
20 Jul 2026
11 Jul 2026
18 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto
1.5 m in -All kinds of soil. | 752.51 | Cum | 24.95 | ₹18,775.12 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil | 11.8 | Cum | 495.86 | ₹5,851.15 |
| 3 | Providing and Laying of stone soling hand picked incld all carraiges, loading, unloading etc complete job | 2.21 | Cum | 850 | ₹1,878.5 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | 5,382.66 | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 9.38 | Cum | 6,818.98 | ₹63,962.03 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Rafts , Columns, piers, abutments, pillars, posts and struts complete job as directed by eic | 42.59 | Sqm | 296.24 | ₹12,616.86 |
| 7 | Providing and fixing HI-Rib sheet in angles for vertical partition (JSW , Tata Dura Shine or Equivalent) 0.5 MM thick, fixed with polymer coated J or L hooks bolts & nuts 8mm dia with bitumen & GI limpet washers all accessories complete job as directed by EIC | 66.89 | Sqm | 1,250 | ₹83,612.5 |
| 8 | Engagement of Labour for fixing of angles in concrete in Line and level all complete job as directed by eic | 6 | Labour | 700 | ₹4,200 |
| 9Carriage | |||||
| 9.1 | Sand 45% Sum of the qty. 5&6 for 10 km distance | 4.99 | Cum | 288.68 | ₹1,440.51 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_1024154.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .