| 1 | L1₹14.4 LAccepted-Finance | L1 | Accepted-Finance ACCEPTED | |
| 2 | L2₹14.4 L+₹2,920 (0.20%)Accepted-Finance | L2 | Accepted-Finance ACCEPTED | |
| 3 | L3₹14.6 L+₹25,610 (1.78%)Accepted-Finance | L3 | Accepted-Finance ACCETED | |
| 4 | L4₹16.8 L+₹2.5 L (17.2%)Accepted-Finance | L4 | Accepted-Finance ACCETED |
| Sl No | Description | Qty | Unit | MS.SUNIL KUMAR PRADHAN L2 | BIBEKANANDA PATRA L1 | PRAKASH CHANDRA HOTA L4 | SOUMYA RANJAN MOHAPATRA L3 |
|---|---|---|---|---|---|---|---|
| 1.00Sub-Head : Earth Work | |||||||
| 2.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | |||||||
| 2.01 | All kinds of soil | 306 | One Cubic Metre | 220 ₹67,320 | 150 ₹45,900 Lowest | 243 ₹74,358 | 230 ₹70,380 |
| 3.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-Charge. | |||||||
| 3.01 | Ordinary rock | 24 | One Cubic Metre | 280 ₹6,720 | 50 ₹1,200 Lowest | 244 ₹5,856 | 150 ₹3,600 |
| 4.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||||
| 4.01 | All kinds of soil. | 4 | One Cubic Metre | 220 ₹880 | 75 ₹300 Lowest | 248 ₹992 | 250 ₹1,000 |
| 5.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 252 | One Cubic Metre | 420 ₹1,05,840 | 50 ₹12,600 Lowest | 98 ₹24,696 | 180 ₹45,360 |
| 6.00Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. | |||||||
| 6.01 | All kinds of soil. | 166 | One Cubic Metre | 155 ₹25,730 | 10 ₹1,660 Lowest | 190 ₹31,540 | 80 ₹13,280 |
Tender Value
₹15.6 L
EMD Value
₹31,300
Closing Date
19 Dec 2024, 3:00 pmClosed
Nodal Officer (Tender)
OFFICE OF THE CHIEF ENGINEER CIVIL, BSNL CIVIL ODISHA ZONE, 3rd FLOOR, DOOR SANCHAR BHAWAN, BHUBANESWAR,
Construction of foundations for 2 nos 40M NBLW Ground Based tower including DG set platform, OD plinth and ring earth at back side of Community Centre and CISF Colony, NALCO, Angul under Dhenkanal BA
2024_BSNL_218803_1
50/CE(C)/2024-25/BCD/Cuttack
Open Tender
Civil Works
Item Rate
60 days
NALCO, Angul.
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
AO(Cash) ,BSNLO/o PGMTD,Cuttack
₹31,300
Yes
30 Sept 2025
10 Dec 2024
20 Dec 2024
10 Dec 2024
19 Dec 2024
10 Dec 2024
10 Dec 2024 - 19 Dec 2024
Amount
Sub-Head : Earth Work
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge.
All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-Charge.
Ordinary rock
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.
All kinds of soil.
Ordinary or hard rock.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Sub-Head : Concrete Work
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Sub-Head : Reinforced Cement Concrete
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size derived fro natural resources)
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).
Sub-Head : Masonry Work
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 5.0 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 Coarse sand)
Sub-Head : Flooring
52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete.
Sub-Head : Finishing
12 mm cement plaster of mix :
1:6 (1 cement: 6 coarse sand)
Sub-Head : Tower Work
Carriage of anchor bolts,templates, nuts, guide angle and base plate as required as per direction of Engineer-in-charge from place of store at BHUBANESWAR to work site. Rate includes sorting, labour charges in loading and unloading, safe handling etc all complete.
Galvanising of MS high density tower anchor nuts, washers & bolts (32 nos top 0.20m length) etc as per requirement all complete as per direction of Engineer-in-charge, for protecting against corrosion in coastal & extreme weather conditions area.
Labour charges for arranging and fixing the anchor bolts of 32mm dia @ 9.00 nos in each column (Total 36 nos) including nuts and base plate etc. in position as per direction of Engineer-in-charge. (Templates and anchor bolts, nuts and washers will be supplied by the department)
Providing and fixing ring earth consisting of specified and required ring size at site and laying of G.I. Flats of size 50 x 6 mm laid at the bottom of the tower foundation pit, one metre away from the tower base. The G.I. flats shall be connected with each other with G.I. nuts and bolts after placing lead strips/ lead wool of 90x50x1mm thick in between and with legs of tower with G.I. nuts and bolts with spring washers. All the joints shall be properly wrapped and sealed by water proof tape to avoid ingress of moisture. The G.I flats shall be covered with fine and cohesive good earth all around and duly compacted. The G.I. flats shall be bent in such a way that curves are smooth having radius not less than one metre. The rate shall be inclusive of all materials and labour including tools and plants, incidental cost etc. all complete and nothing extra shall be paid on any account except earthwork in excavation, filling available excavated earth or good earth brought from outside as the case may be. (Note: Payment shall be made only if the ohmic value of the earth resistance is 0.5 ohms or less. Security deposit for the whole work will be released only after completion of A/T Any rectification required to make earth resistance to 0.5 ohms or less is to be carried out by the agency. If the A/T is not done in one year after completion of work 75% of S.D. will be released. Remaining part of S.D. will be released after completion of A/T).
MS.SUNIL KUMAR PRADHAN (BID ID -791908)
SOUMYA RANJAN MOHAPATRA (BID ID -791322)
PRAKASH CHANDRA HOTA (BID ID -790478)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .