Loading…
Loading…
Tender Value
₹43.6 L
EMD Value
₹87,200
Closing Date
14 Oct 2026, 6:00 pm
GE North Bangalore
GARRISON ENGINEER NORTH BANGALORE T 64 MEANEE LINESMEG AND CENTRE BANGALORE 560042
PROVISION OF RAIN WATER HARVESTING AT PCTC AND PROVISION OF RADIATION PROTECTION TILES FOR ORTHO PANTOMOGRAM OPG X RAY MACHINE ROOM AT MDC UNDER GE NORTH BANGALORE
2026_MES_782961_2
8374
Open Tender
Civil Works
Item Rate
180 days
Bangalore
Class D Category a(i)
9 documents required · 9 mandatory
₹500
Yes
GARRISON ENGINEER NORTH BANGALORE
₹87,200
Yes
23 Sept 2026
23 Sept 2026
17 Oct 2026
23 Sept 2026
14 Oct 2026
7 Oct 2026
23 Sept 2026 - 7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating over areas n exe 1.50m deep in hard and dense soil and getting out complete all as specified and as directed | 157 | CUBIC METRE | 100 | ₹15,700 |
| 2 | Excavation in trenches not exceeding 1.5 m depth and not exceeding 1.5m width and getting out in hard/dense soil for laying of pipe lines. | 205 | CUBIC METRE | 100 | ₹20,500 |
| 3 | Excavating over areas exe 1.50m deep and n exe 3.00m in hard and dense soil and getting out complete all as specified and as directed | 148 | CUBIC METRE | - | - |
| 4 | Excavating Excavating over areas, Exc 3.0m but not exc 4.50 mtr deep and getting out in hard / dese soil etc complete all as specified and as directed | 134 | CUBIC METRE | - | - |
| 5 | Excavating Excavating over areas, Exc 4.50m but not exc 6.00 mtr deep and getting out in hard / dese soil etc complete all as specified and as directed | 103 | CUBIC METRE | - | - |
| 6 | Returning filling in hard/dense soil, incl spreading, levelling, watering and well ramming in layers n.exc 25cm, complete. | 353 | CUBIC METRE | - | - |
| 7 | Removing excavated soil exc 1.50 KM and n.exc 5 KM and depositing where directed at a level n.exc 1.50 M above the starting points all as specified. | 394 | CUBIC METRE | - | - |
| 8 | M&L for PCC 1:2:4, type B2 using 40mm graded stone aggregate as in foundations, filling and mass concrete, complete all as specified and directed. | 11.7 | CUBIC METRE | - | - |
| 9 | M&L M-30 Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete | 25.7 | CUBIC METRE | - | - |
| 10 | Use and waste formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter all as specified and as directed by engineer in charge. | 11 | SQUARE METRE | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
8374Tender.pdf
Tender Documents • 1.20 MB
BOQ_886389.xls
BOQ • 1.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .