| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC AT PO DUDHARI PO PS SEMILIGUDA DIST KORAPUT PIN 764036 | KORAPUT | ODISHA | 764036 | ₹14.2 L | L1 | Accepted-AOC KAILASH CHANDRA CHOUDHURY has won the lottery system and ranked as L1, the comm. have decided to award the Tender to him who bid 0 Perc. Less than the Tender Value which comes to Rs. 1416079.11 |
| 2 | L1₹14.2 LRejected-AOC | ₹14.2 L | L1 | Rejected-AOC CHANDRA HANTAL has ranked as L3 in Lottery system, who bid 0 Perc. Less than the Tender Value which comes to Rs. 1416079.11 |
| 3 | L1₹14.2 LRejected-AOC | ₹14.2 L | L1 | Rejected-AOC Jagabandhu Hantal has ranked as L2 in Lottery system, who bid 0 Perc. Less than the Tender Value which comes to Rs. 1416079.11 |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Due to applying for withdrawing from the bid. |
Tender Value
₹14.2 L
EMD Value
₹14,600
Closing Date
27 Apr 2026, 5:30 pmClosed
DISTRICT PROJECT COORDINATOR, SS, KORAPUT
DISTRICT PROJECT OFFICE, SAMAGRA SHIKSHA, SHIKSHASADAN, NEAR COLLECTORATE CAMPUS KORAPUT 764020
CONSTRUCTION OF 1 NO ADDITIONAL CLASS ROOM BUILDING AT MALIDOLIAMBO PS OF SEMILIGUDA BLOCK
2026_OPEPA_127952_1
IFB-DPC SS KPT ACR 133/134 OF 2024-25
Open Tender
Civil Works - Buildings
120 days
MALIDOLIAMBO PS OF SEMILIGUDA BLOCK
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹14,600
Yes
30 May 2026
9 Apr 2026
28 Apr 2026
9 Apr 2026
27 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work excavation foundation in hard of soil including stoney earth in foundation with all lifts,delifts and leads including dressing and leveling the bed and depositing excavating earth at place away from site including dewatering, shuttering, cost of labour,royalty and T and P sundries required for the work etc. complete as per direction of by the Engineer-in-Charge. | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Supply and filling of sand in foundation and tranches with well waterd and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost of sand, conveyance, loading and unloading, royalties and taxes of all materials and cost of all labour, sundries. T and P required for the work etc. complete in all respect as per direction by the Engineer-in-Charge. | 1 | Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Cement Concrete Proportion (1:3:6) in foundation and floor using 4 cm size clean hard black C.B granite stone metal of approved quality and from approved quarry including hoisting,lowering and lying concret in layers not exceeding 15 cm.(6") thick to the required level ramming, watering, curing etc. complete including cost of sand, conveyance, royalties and taxes of all materials and cost of all labour and T and P required for the work etc. complete in all respect as per direction by the Engineer-in-Charge. | 1 | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Random rubble stone masonry in c.m (1:6) with foundation ans plint by using hard black broken granite stone including bond stones from approved quarry including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necesssary projections watering and curing etc including cost, conveyance, royalties and taxes of all material and cost of labour and T and P required for the works etc complete in all respect as direction of Engineer-in-Charge. | 1 | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Fly Ash brick work masonry in cement mortar (1:6) in super structure using Fly Ash Bricks 23cm x 11cm x 8cm size having crushing strength not less than 35Kg/sqcm with dimension tolerance + 8 percentage including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royalties and taxes of all materials with all labour and T and P required for the work complete in all respect as per direction of Engineer-in-Charge Ground Floor | - | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | R.C.C work of M20 in following works using 12mm to 20 mm (1/2" to 3/4") size ( 20 mm not exceed 25 percentage) hard black broken granite stone chips approved quarry free from including hosting, lowering, lying and compacting concret, watering curing, centering, shuttering, conyeyance, royalities, taxes of all material with all labour and T and P, required for the works etc. complete in all respect but excluding the cost of conveyance oc M.S. rods ot Tor steel and binding wire of 18 to 20 guage and labour charges for straighting, cutting, bending, binding and tying the grills and placing it proper position and as per the direction of the Engineer-in-Charge. Column Base | - | Cum | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | Coloumn | - | Cum | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Plinth Beam | - | Cum | 1 | - | BI01010001010000000000000515BI0100001120 |
| 9 | Lintel | - | Cum | - | - | BI01010001010000000000000515BI0100001121 |
| 10 | Chajja | - | Sqm | 1 | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587349.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.50 MB
DTCNMalidoliambo.pdf
Tender Documents • 14.47 MB
BOQ_587349.xls
BOQ • 0.29 MB
NIT.pdf
Additional Documents • 8.49 MB
INVITIATION.pdf
Additional Documents • 1.07 MB
single.pdf
Additional Documents • 1.27 MB
Memorandum.pdf
Additional Documents • 1.07 MB
Download all tender documents and submit your bid