| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical | Accepted-Technical Accept |
Tender Value
₹10.1 L
EMD Value
₹20,300
Closing Date
21 Sept 2026, 10:30 amClosed
EE Hamirpur
EE Hamirpur
SH Providing wood work Replacement of Main Gate including wicket gate replacement of ceiling of Kitchen and Corridoor tile work painting distempering and other minor repair
2026_PWD_143356_5
EE Letter No 6430-69 dated 10-09-2026
Open Tender
Civil Works
Percentage
60 days
Hamirpur
Please refer Tender documents.
13 documents required · 13 mandatory
₹500
₹20,300
30 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, hold fasts etcetera complete and stacking within 20 metre (Twenty millimetre) lead not exceeding area 3 sq. metre (Three square metre) and below including entire carriage of material with in all leads, lifts, drawings, technical specifications as per direction by Engineer-in-Charge including other incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 10 | Per square metre | 150 | ₹1,500 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material including entire carriage of material with in all leads, lifts, drawings, technical specifications as per direction by Engineer-in-Charge including other incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 0.51 | Per cubic metre | 850 | ₹433.5 |
| 3 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material for thickness of tiles 10 mm to 25 mm (Ten millimetre to twenty five millimetre) including entire carriage of material with in all leads, lifts, drawings, technical specifications as per direction by Engineer-in-Charge including other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 88.64 | Per square metre | 40 | ₹3,545.6 |
| 4 | Dismantling cement asbestos or other hard board in ceiling or partition wall including stacking of serviceable materials and disposal of un-serviceable materials within all lead and lifts (Frame work such as joists, beams to be measured and paid for separately) as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 32.02 | Per square metre | 40 | ₹1,280.8 |
| 5 | Dismantling dressed stone work ashlar face stone work, marble work of precast concrete work manually/by mechanical means including stacking of serviceable and disposal of underviceable material as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1.52 | Per square metre | 1,300 | ₹1,976 |
| 6 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms within all leads including getting out the excavated soil and disposal of surplus excavated soil as directed, within all leads and lifts ordinary rock and all kinds of soil including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 10.13 | Per cubic metre | 300 | ₹3,039 |
| 7 | Centering and shuttering including strutting, propping etcetera and removal of form work for Foundations, footings, bases for columns including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 19.2 | Per square metre | 300 | ₹5,760 |
| 7.01 | Centering and shuttering including strutting, propping etcetera and removal of form work for Columns, piers, abutments, pillars, posts and struts including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 9.6 | Per square metre | 350 | ₹3,360 |
| 8 | Providing and laying in position cement concrete of specified grade 1:4:8 (one cement : four coarse sand : eight graded stone aggregate) 40mm ( forty millimetre) nominal size graded stone aggregate for all works upto plinth level including the cost of centering and shuttering including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 10.4 | Per cubic metre | 5,000 | ₹52,000 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete,1:1.5:3 (one cement : one point five coarse sand : three graded stone aggregate 20 mm (twenty millimetre) nominal size) in Foundation footings bases of columns and the like and mass concrete excluding the cost of centering, shuttering, finishing and reinforcement upto plinth level including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 8.4 | Per cubic metre | 7,000 | ₹58,800 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
SBDResthouseHamirpur.pdf
Tender Documents • 4.71 MB
BOQ_213058.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .