| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC | ₹7.3 L | L1 | Accepted-AOC Accept |
| 2 | L2₹7.9 LRejected-Finance | ₹7.9 L | L2 | Rejected-Finance Above Contractor Value |
| Sl No | Description | Qty | Unit | Ramasamy Construction L1 | R R Constructions L2 |
|---|---|---|---|---|---|
| 1.00 | 1. Maintanance of the road from Valikandapuram to Alzhagapuri road KM 0/0-3/440 (R-27) at Valikandapuram pt.Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 12.1 | m3 | 2,524 ₹30,540.40 | 2,650 ₹32,065 |
| 2.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 120.98 | m2 | 84 ₹10,162.32 | 95 ₹11,493.10 |
| 3.00 | Applying TACK COAT over BT surface at 2.50 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 120.98 | m2 | 19 ₹2,298.62 | 20 ₹2,419.60 |
| 4.00 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 796.5 | M2 | 34 ₹27,081 | 45 ₹35,842.50 |
| 5.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | 911.86 | m2 | 256 ₹2.3 L | 275 ₹2.5 L |
| 6.00 | 1. Maintanance of the road from Alzhagapuri to Sathanavadi road KM 0/0-2/918 (R-61) at Mettupalayam pt.Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 22.56 | m3 | 2,524 ₹56,941.44 | 2,650 ₹59,784 |
| 7.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 225.38 | m2 | 83 ₹18,706.54 | 85 ₹19,157.30 |
| 8.00 | Applying TACK COAT over BT surface at 2.50 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 225.38 | m2 | 19 ₹4,282.22 | 20 ₹4,507.60 |
| 9.00 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 614.54 | M2 | 33 ₹20,279.82 | 45 ₹27,654.30 |
| 10.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | 839.92 | m2 | 255 ₹2.1 L | 265 ₹2.2 L |
Tender Value
₹7.5 L
EMD Value
₹7,450
Closing Date
24 Oct 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER
PANCHAYAT UNION OFFICE VEPPANTHATTAI
Streets and land clan and green villaged live hood activites in 2 work in valikandapuram panchayat and mettupalayam panchayat in veppanthattai block
2025_RDTN_615854_1
A3/655/2025 16.10.2025
Open Tender
Civil Works - Roads
120 days
PANCHAYAT UNION OFFICE VEPPANTHATTAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7,450
Yes
6 Feb 2026
18 Oct 2025
24 Oct 2025
18 Oct 2025
24 Oct 2025
19 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.60 MB
PARTII.pdf
Tender Documents • 0.66 MB
BOQ_735866.xls
BOQ • 0.23 MB
PARTI.pdf
Tender Documents • 0.82 MB
Download all tender documents and submit your bid