| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.0 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹24.6 L+₹60,360.03 (2.51%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹24.8 L+₹79,198.50 (3.30%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹30.2 L+₹6.2 L (25.6%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹32.3 L+₹8.3 L (34.5%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹38.4 L
EMD Value
₹77,000
Closing Date
18 Jun 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Balance Interlocking tiles work at Village- Alipura, YEA. WC-06
2026_YEIDA_1157329_42
YEA/GM(PROJECT)/2026/517 DT-04/06/2026
Open Tender
Civil Works
Fixed-rate
120 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹975
₹77,000
14 Oct 2026
9 Jun 2026
19 Jun 2026
9 Jun 2026
18 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and Laying in Position cement concrete with 4cm gauge approved stone ballast coarse sand and cement in the proportion of 8:4:1 including supply of all material labour tools and plants etc required for all completion of work (item code 5.4.3) | - | Cum | - | - |
| 2 | B/W with bricks of class 150 in foundation & plinth in CM 1:4 (Based on UP PWD SOR 2020) Cement mortar 1:4 ( 1cement :4 Coarse sand) | 1 | Cum | - | - |
| 3 | Dry brick on edge flooring in required pattern with bricks of class designation 15.0 on a bed including filling joints with sand with common burnt clay non modular bricks (DAR/11.2/AR/YEIDA) | - | Sqm | - | - |
| 4 | 12 mm cement plaster of mix: 1:6 (1 cement: 6 fine sand) (DAR/13.4.2/UPPWDSOR 2020) | - | Sqm | - | - |
| 5 | supply of good earth in embankment in ordinary soil embankment to be done in 20 cm layers breacking clods, watering, rolling each layer by 1/2 T wooden or steel rammer, rolling every third and top most layer of roller 8 tonne and including ramming, dressing the surface of required levels and slops and including 1.50 mtr. lift and all lead (earth shall be brought from a place which is beyond Noida area) including cartage of earth by mechnically transport and T&P etc required for proper completion of work. (earth shall be arranged by the contractor at his own cost.) (UPPWD SOR 2020) | 1 | Cum | - | - |
| 6 | Providing and laying 80 mm thick factory made cement concrete interlocking paver block (ISI Marked) made by block making machine with strong vibratory compaction of approved size design, shape, laid in required color and pattern over and including average 50 mm thick compacted bed coarse sand and filling the joints with fine sand all complete as per direction of Engineer -in-charge with conforming (UP PWD SOR 2020) (New SOR Based DSR 16.68) | - | Sqm | - | - |
| 7 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with Vibratory power roller to achieve the desired density, complete as per clause 401 (Based on SOR UP PWD 2020) | 1 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.09 MB
42.pdf
Tender Documents • 1.23 MB
BOQ_2171219.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .