| Sl No | Description | Qty | Unit | SRISAIHARI CONSTRUCTIONS L1 | INTELECT TECHNOLOGIES L2 |
|---|---|---|---|---|---|
| 1.00Providing Cement Concrete Pavement in new ST colony in Chinnampathi H/O Mavuthampathi Phanchyat | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub-soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and depositing the surplus earth in all places shown by the departmental officers with initial leads and lifts, etc., including levelling the site complete complying with standard specifications and as directed. | 192 | Cum | 246.5 ₹47,328 Lowest | 248.46 ₹47,704.32 |
| 3.00 | Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers | 12 | Cum | 5,248.4 ₹62,980.8 Lowest | 5,300.5 ₹63,606 |
| 4.00 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting for plane surface in all cross bracings etc., | 480 | Sqm | 516.5 ₹2,47,920 Lowest | 521.16 ₹2,50,156.8 |
| 5.00 | Cement Concrete 1:3:6 mix using 20 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other albour charges etc., completed. | 60 | Cum | 5,639.9 ₹3,38,394 Lowest | 5,695.39 ₹3,41,723.4 |
| 6.00 | Supplying and filling in foundation, basement, etc with filling gritty Gravel in layers well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 90 | Cum | 476 ₹42,840 Lowest | 480.76 ₹43,268.4 |
| 7.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 120 | Cum | 1,725.5 ₹2,07,060 Lowest | 1,742.25 ₹2,09,070 |
| 8.00 | Cement Concrete 1:2:4 mix using 20 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other albour charges etc., completed. | 54 | Cum | 6,633.5 ₹3,58,209 Lowest | 6,699.33 ₹3,61,763.82 |
| 9.00 | Provision for Bitumen Pad | 1 | No | 4,000 ₹4,000 Lowest | 4,040 ₹4,040 |
| 10.00 | Provision for Name board charges | 1 | No | 4,500 ₹4,500 Lowest | 45,450 ₹45,450 |
Tender Value
₹15.7 L
EMD Value
₹16,000
Closing Date
14 Jul 2025, 3:00 pmClosed
Additional Collector (Dev), Coimbatore
DRDA, Coimbatore
Providing Cement Concrete Pavement in New ST colony in Chinnampathi H/O Mavuthampathi in Madukkarai Block - Package No TN 02-80 in Madukkarai Block of Coimbatore District under NRuM-Phase I 2016-2017 to 2018-19 Scheme
2025_RDTN_577954_1
DIPR/06/Tender/2016/B4 dated 23.06.2025
Open Tender
Civil Works
Item Rate
180 days
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹16,000
15 Oct 2025
4 Jul 2025
14 Jul 2025
4 Jul 2025
14 Jul 2025
4 Jul 2025
Amount
Providing Cement Concrete Pavement in new ST colony in Chinnampathi H/O Mavuthampathi Phanchyat
Earth work excavation for foundation in all soils and sub-soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and depositing the surplus earth in all places shown by the departmental officers with initial leads and lifts, etc., including levelling the site complete complying with standard specifications and as directed.
Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers
Supplying & Erecting centering for sides & soffits including necessary supports & strutting for plane surface in all cross bracings etc.,
Cement Concrete 1:3:6 mix using 20 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other albour charges etc., completed.
Supplying and filling in foundation, basement, etc with filling gritty Gravel in layers well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Cement Concrete 1:2:4 mix using 20 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other albour charges etc., completed.
Provision for Bitumen Pad
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction & maintenance) above this row in column "BB" for all works in this package}
INTELECT TECHNOLOGIES (BID ID -1400271)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .