Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹51.0 L+₹33.2 L (122.9%)Accepted-AOC VILLAGE BUDMAJRA NEAR BALONGI SALES TAX BARRIER DISTRICT MOHALI PUNJAB | MOHALI | MOHALI | PUNJAB | L2 | Accepted-AOC L1 BIDDER REQUESTED NOT TO ISSUE WORK ORDER.AS SUCH WORK ORDER ISSUED TO L2 BIDDER AFTER TAKING APPROVAL FROM COMPETENT AUTHORITY. | |
| 2 | L1₹27.0 LRejected-AOC KRIPA BHAWAN SALT LAKE SECTOR V EP BLOCK PLOT NO Y20 KOLKATA WEST BENGAL 700091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | L1 | Rejected-AOC FIRM HAS INTIMATED THAT THEY HAVE QOUTED LOW RATES BY CLERICAL MISTAKE AND REQUESTED NOT TO ISSUE WORK ORDER AT THEIR QOUTED RATES | |
| 3 | L3₹60.5 L+₹33.5 L (123.9%)Rejected-AOC FLAT NO 10 2ND FLOOR SODDHI TERRECSES RAYKAR NAGAR DHAYARI PUNE 411041 | PUNE | PUNE | MAHARASHTRA | 411041 | L3 | Rejected-AOC BEING L3 BIDDER | |
| 4 | L4₹67.4 L+₹40.4 L (149.5%)Rejected-AOC 1 VISHVAS NAGAR GONIANA ROAD P O NFL BATHINDA 151 003 | BATHINDA | BATHINDA | PUNJAB | 151003 | L4 | Rejected-AOC BEING L4 BIDDER |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
16 Oct 2020, 11:30 amClosed
Superintending Engineer,MM-1
GHTP Lehra Mohabbat
BFP,CEP, CW Pumps, Vacuum Pumps, TACW Pumps, BACW Pumps, Boiler fill Pumps, Hotwell Make Up Pumps, Stator Water Make Up Pumps, ACW Pumps, SGDMCW Pumps etc. of 2x210 MW and 2X250 MW units of GHTP, Lehra Mohabbat
2020_POWER_53681_1
29/MM-I/TGP/GHTP/2020
Open Tender
Power/Energy Projects/Products
Tender cum Auction
365 days
Superintending Engineer, MM-1, GHTP Lehra Mohabbat
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
TIA
₹1.3 L
Yes
9 Nov 2020
18 Sept 2020
19 Oct 2020
18 Sept 2020
16 Oct 2020
18 Sept 2020
To attend various Routine, Preventive and Breakdown Maintenance jobs (Mechanical jobs) of Boiler Feed pumps, Condensate Extraction Pumps, CW Pumps, Vacuum Pumps, Turbine Aux. Cooling Water Pumps, BACW Pumps, Boiler fill Pumps, Hot-well Make Up Pumps and Stator Water make up Pumps, ACW Pumps, SGDMCW Pumps, TGDMCW Pumps, TG Cycle Make Up Pumps etc. of 2x210 MW & 2x250 MW Units falling under TG Pumps Maintenance Cell of GHTP Lehra Mohabat.
On lump sum basis as per scope of work in Section-VIII- A considering any one unit running and keeping balance three Units available for running as and when required (except during overhauling).
On lump sum basis as per scope of work in Section-VIII -A for running of all the four units (except during overhauling).
To attend to various jobs during annual overhaul pertaining to Boiler Feed pumps, Condensate Extraction Pumps, CW Pumps, Vacuum Pumps, Turbine Aux. Cooling Water Pumps, BACW Pumps, Boiler fill Pumps, Hot-well make up pumps and Stator Water make up Pumps, ACW Pumps, SGDMCW Pumps, TGDMCW Pumps, TG Cycle Make Up Pumps etc. of 2x210 MW & 2x250 MW Units falling under TG Pumps Maintenance cell on lump-sum basis on any one unit of GHTP Stage-I or Stage-II as per scope of work in Section-VIII -B.
CHOPRA ENGINEERING WORKS
SWAMINA INTERNATIONAL PRIVATE LIMITED
Gill Engineering Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .