Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Fee/PreQual/Technical/Finance | -33.11% | ₹5.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.0 L+₹1.8 L (34.5%)Admitted-Fee/PreQual/Technical/Finance ANANTNAG ANANTNAG JAMMU AND KASHMIR | ANANTNAG | JAMMU AND KASHMIR | 192101 | -10.06% | ₹7.0 L+₹1.8 L (34.5%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹10.1 L+₹4.8 L (92.9%)Admitted-Fee/PreQual/Technical/Finance | +29.00% | ₹10.1 L+₹4.8 L (92.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.8 L
EMD Value
₹19,000
Closing Date
8 Sept 2026, 6:00 pmClosed
executive engineer
Batamaloo
Kut Khul Construction of RS masonary wall on left side DS offtake of SunriKhul at RD1 29Km for a length of 10 metres
2026_IFC_322827_3
14
Open Tender
Civil Works
Percentage
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer IFC Division Srinagar
₹19,000
11 Sept 2026
31 Aug 2026
9 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 111.7 | cum | 592.9 | ₹66,226.93 |
| 2 | Dumping stone excl. cost of stones in horizontal on level. | 18.28 | Cum | 237.9 | ₹4,348.81 |
| 3 | Supply of stones (nallah) | 18.28 | Cum | 700 | ₹12,796 |
| 4 | Centering & shuttering incl. strutting, propping etc. & removal of form work for:- Foundations, footings, bases for columns | 6 | sqm | 286.35 | ₹1,718.1 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.2 | Cum | 5,202.9 | ₹16,649.28 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 9 | Cum | 7,788.4 | ₹70,095.6 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 495 | kgs | 123.2 | ₹60,984 |
| 8 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:
Cement mortar 1:6 (1 Cement : 6 coarse sand) | 59.6 | Cum | 7,677.35 | ₹4,57,570.06 |
| 9 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 6 | sqm | 346.7 | ₹2,080.2 |
| 10 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand)
Flush/Ruled Pointing | 30.9 | sqm | 297 | ₹9,177.3 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_1084602.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .