Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.1 CrAdmitted-Finance | -5.01% | ₹6.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.3 CrAdmitted-Finance | -1.60% | ₹6.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹7.2 CrAdmitted-Finance | +11.10% | ₹7.2 Cr | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹12.9 L
Closing Date
7 May 2026, 6:00 pmClosed
SE PWD CIRCLE REASI
SE PWD CIRCLE REASI
Construction of road from (Phalini) Tuli to Dharmari via Banna/Thillo (Balance work) (under CRF Phase-I) L 5.00Kms
2026_PWDJK_308902_1
Fresh E-NIT No 04 of 2026-27 Dated 28-04-2026
Open Tender
Civil Works
Reasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Yes
SE PWD CIRCLE REASI
₹12.9 L
Yes
25 May 2026
28 Apr 2026
8 May 2026
28 Apr 2026
7 May 2026
28 Apr 2026
28 Apr 2026 - 7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil(50%) | 20,250 | cum | 188.75 | ₹38,22,187.5 |
| 0.0 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock(30%) | 12,150 | Cum | 378.35 | ₹45,96,952.5 |
| 0.0 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge. Hard Rock (Requiring Blasting )(20%) | 8,100 | cum | 669.7 | ₹54,24,570 |
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 mtr from cutting edge | - | cum | 252.05 | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1 | cum | 4,029.15 | ₹4,025.12 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) with 20% boulders | 1,894.1 | cum | 4,102.9 | ₹77,71,302.89 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 44.56 | cum | 7,091.6 | ₹3,16,001.7 |
| 0.0 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with
5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size | 66.24 | cum | 8,953.95 | ₹5,93,109.65 |
| 0.0 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete. 50 mm thick with 20mm nominal size stone aggregate. | 12.8 | Cum | 5,877.45 | ₹75,231.36 |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more. | 6,624 | kg | 79.25 | ₹5,24,952 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_1000524.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid