Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹20.5 LAccepted-AOC | ₹20.5 L Quoted ₹20.6 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹20.9 LRejected-Finance | ₹20.9 L | L-2 | Rejected-Finance L-2 |
Updated dates
Tender Value
₹19.6 L
EMD Value
₹24,500
Closing Date
28 Mar 2026, 6:55 pmClosed
AE(C), RJML AREA
AREA OFFICE RAJMAHAL AREA, DHANKUNDA
Construction of RCC garland drain at Five tola at Bara Simra rehab site under Rajmahal Area. Ph-I.
2026_ECL_356718_1
ECL/RJML/AGM/AE(C)/ e-Ten/25-26/666 Dt-14.03.2026
Open Tender
Civil Works - Others
30 days
Bara Simra rehab site
Please refer Tender documents.
3 documents required · 3 mandatory
₹24,500
4 Jun 2026
14 Mar 2026
30 Mar 2026
14 Mar 2026
28 Mar 2026
14 Mar 2026
14 Mar 2026 - 17 Mar 2026
Item Description/ Heading
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth laed upto 50m and for all lift,as directed by Engineer-in-charge. All kinds of soil
Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Brick flat soiling
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Carriage of materials by mechanical transport including loading, unloading and stacking: Earth lead-1 km.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_369581.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.10 MB
Tendernotice_2.pdf
PDF • 1.38 MB
BOQ_369581.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid