Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-AOC | ₹17.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.5 L+₹524.91 (0.03%)Rejected-Finance | ₹17.5 L+₹524.91 (0.03%) | L2 | Rejected-Finance L2 |
Tender Value
₹20.6 L
EMD Value
₹42,000
Closing Date
25 Mar 2026, 12:00 pmClosed
EEREDBIJNOR
EEREDBIJNOR
2-Drain construction work from Dev Singh s house in Narullapur towards Shri Ram s house.
2026_REDUP_1123651_2
2393/EE/RED/DATE-05.03.2026
Open Tender
Civil Works
Percentage
120 days
EEREDBIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹42,000
Yes
EEREDBIJNOR
21 Aug 2026
11 Mar 2026
25 Mar 2026
11 Mar 2026
25 Mar 2026
11 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move). as per Sl.251(a) | 386.01 | Cum. | 190 | ₹73,341.9 |
| 2 | Cement Concrete with 4 cm stone balast, Coarse sand & Cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. in Fdn incl all as per SI-281 | 33.6 | Cum. | 6,507.5 | ₹2,18,652 |
| 3 | S/L of 125 micron polythene sheet over base of concrete in i/c all. | 288 | Cum. | 19 | ₹5,472 |
| 4 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2;4 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire.complete all as per SI No 284(a). | 105.3 | Cum. | 7,647.5 | ₹8,05,281.75 |
| 5 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.as Sl.504 | 82.66 | qtl | 7,790 | ₹6,43,921.4 |
| 6 | S/F sign board i/c all comp. at site. | 1 | No. | 2,992.5 | ₹2,992.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_2093444.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .