| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.2 LAccepted-AOC | 1 | Accepted-AOC LOWEST BIDDER | |
| 2 | 2₹18.8 L+₹60,940.61 (3.34%)Rejected-Finance | 2 | Rejected-Finance HIGHEST BIDDER |
Tender Value
₹18.5 L
EMD Value
₹18,500
Closing Date
28 Apr 2025, 3:00 pmClosed
BDO VP SATHY
BLOCK DEVELOPMENT OFFICE SATHY
Construction of Cremation shed,Compound wall and BT road at Ondiyur Mayanam in Sadumugai Village Panchayat in Sathyamangalam Panchayat Union of Erode District under AGAMT 2025-26
2025_RDTN_549087_1
3186/2024/B2 DATED 04/04/2025
Open Tender
Civil Works - Buildings
Item Rate
120 days
SATHY
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹18,500
Yes
7 Jul 2025
21 Apr 2025
28 Apr 2025
21 Apr 2025
28 Apr 2025
21 Apr 2025
Amount
Name of the Work :Construction of Cremation shed with Compound wall and BT road at Ondiyur mayanam H/O Sadumugai in Sathyamangalam Panchayat Union of Erode District, under AGAMT 2025-26
Earth work excavation in hard gravelly soil with initial lead and lift in narrow Trench as per SS20 B for Foundation.
Cement concrete 1:4: 8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Brick work in C.M.1:5 mix using country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc., complete.
Lintel , Roof slab
Supplying and fabrication of steel for R.C.C.works including cost and conveyance to site and all labour charges etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc., complete
Plastering in C.M.1:5 mix,12 mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Exterior emulsitoin two coats with best approved Emulsition including cost of Painting priming coat over new plastered surface and conveyance of all materials.
Sub Estimate for BT road
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
HM stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A DHANDAPANI (BID ID -1314439)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_655113.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .