Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88,000.08Accepted-Finance ADHA JALLIM MAINPURI PHATAK ETAWAH | ₹88,000.08 | L1 | Accepted-Finance Accept |
| 2 | L2₹90,095.32+₹2,095.24 (2.38%)Accepted-Finance | ₹90,095.32+₹2,095.24 (2.38%) | L2 | Accepted-Finance Accept |
| 3 | L3₹98,476.28+₹10,476.20 (11.9%)Accepted-Finance ETAWAH AURAIYA UTTAR PRADESH UP | AURAIYA | UTTAR PRADESH | 206120 | ₹98,476.28+₹10,476.20 (11.9%) | L3 | Accepted-Finance Accept |
| 4 | L5₹1.0 L+₹14,561.92 (16.5%)Accepted-Finance BABA KEDARNATH ENTERPRISES | ₹1.0 L+₹14,561.92 (16.5%) | L5 | Accepted-Finance Accept |
| 5 | L6₹1.1 L+₹20,826.69 (23.7%)Accepted-Finance | ₹1.1 L+₹20,826.69 (23.7%) | L6 | Accepted-Finance Accept |
| Sl No | Description | Qty | Unit | ARVIND SINGH L8 | BABA PRESS AND TRADERS L7 | SHREE SHYAMLA TRADERS L5 | Uddeshya kumar L3 | KRISHNA CONSTRUCTION L4 | M/S Aseen Fauji Contractor L6 | SHAILENDRA SINGH L1 | M/S GIRAND SINGH CONTRACTOR L10 | A K INFRATECH L2 | Krishna construction L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt Clearance of drain including lift up to 1.5 m. and lead up to 30 m. including ramming and dressing By hydraulic excavator / JCB Machine .The earth from Clearence to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 4,190.48 | M3 | 27.6 ₹1,15,657.25 | 27.5 ₹1,15,234.01 | 24.48 ₹1,02,562 | 23.5 ₹98,476.28 | 24.1 ₹1,00,990.57 | 25.97 ₹1,08,826.77 | 21 ₹88,000.08 Lowest | 42.63 ₹1,78,640.16 | 21.5 ₹90,095.32 | 28.01 ₹1,17,375.35 |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
2 Jun 2026, 2:00 pmClosed
Executive Engineer
BDLGC, Etawah
Desilting of Bhadsan Drain From Km. 5.200 to Km. 8.100 For Year 2026-27
2026_UPIDC_1154039_2
03/EE/2026-27
Open Tender
Civil Works
Item Rate
15 days
Etawah
Please refer Tender documents.
2 documents required · 2 mandatory
₹767
₹4,000
19 Sept 2026
27 May 2026
2 Jun 2026
27 May 2026
2 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt Clearance of drain including lift up to 1.5 m. and lead up to 30 m. including ramming and dressing By hydraulic excavator / JCB Machine .The earth from Clearence to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 4,190.48 | M3 | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.35 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_2161781.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .