Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | ₹9.2 L | L1 | Accepted-AOC Lowest rate |
| 2 | L2₹9.7 LRejected-Finance | ₹9.7 L | L2 | Rejected-Finance Highest rate |
| Sl No | Description | Qty | Unit | M.Rajadurai L2 | SELVARAJ PONPANDI L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
For first depth of 2m | 18.39 | cum | 300 ₹5,517 | 263 ₹4,836.57 |
| 2.00 | For Second depth of 1m | 0.36 | cum | 300 ₹108 | 263 ₹94.68 |
| 3.00 | Supplying and filling with sand including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification. | 1.35 | cum | 1,800 ₹2,430 | 1,777 ₹2,398.95 |
| 4.00 | Supplying and filling with excavated earth including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification. | 14.56 | cum | 50 ₹728 | 45 ₹655.20 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
1.50m to 4.50m Below GL | 0.9 | cum | 5,600 ₹5,040 | 5,538 ₹4,984.20 |
| 6.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
PLANE SURFACE:-
Below GL | 7.47 | sqm | 1,100 ₹8,217 | 1,095 ₹8,179.65 |
| 7.00 | Above GL (0.000 - +3.300m) | 10.49 | sqm | 1,100 ₹11,539 | 1,095 ₹11,486.55 |
| 8.00 | Above GL (+5.300 - +6.300m) | 19.99 | sqm | 1,202 ₹24,027.98 | 1,202 ₹24,027.98 |
| 9.00 | CURVED SURFACE:-
Above GL (0.000 - +3.300m) | 43.97 | sqm | 1,642 ₹72,198.74 | 1,642 ₹72,198.74 |
| 10.00 | SQUARE COLUMN:-
Below GL | 5.6 | sqm | 1,314 ₹7,358.40 | 1,314 ₹7,358.40 |
Tender Value
Refer Docs
EMD Value
₹11,450
Closing Date
4 Feb 2026, 3:00 pmClosed
Block Development Officer (B.Pt.), Vallioor
Block Development Office, Vallioor
Construction of 10,000 Litres capacity OHT and Extension of Pipeline at T.Valliyoor in T. Valliyoor Village Panchayat, Valliyoor Panchayat Union.
2026_RDTN_650112_2
RIDF-XXXI 25-26 - 4 nos
Open Tender
Civil Works
T.Vallioor Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,450
9 Mar 2026
2 Feb 2026
4 Feb 2026
2 Feb 2026
4 Feb 2026
2 Feb 2026
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B For first depth of 2m
For Second depth of 1m
Supplying and filling with sand including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.
Supplying and filling with excavated earth including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete 1.50m to 4.50m Below GL
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. PLANE SURFACE:- Below GL
Above GL (0.000 - +3.300m)
Above GL (+5.300 - +6.300m)
CURVED SURFACE:- Above GL (0.000 - +3.300m)
SQUARE COLUMN:- Below GL
Above GL (0.000 - +3.300m)
Above GL (+3.300 - +4.300m)
Above GL (+4.300 - +5.300m)
Above GL (+5.300 - +6.300m)
Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete.
Providing and laying in position, Standardised Concrete Mix M-30 Grade in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cementcontent of 400 kg/m3 and maximum water cement ratio of 0.45, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m') 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). 1.50m to 4.50m Below GL
0m to 1.50m Below GL
Above GL (0.000 - +4.500m)
Above GL (+4.500 - +7.320m)
Above GL (+7.320 - +10.980m)
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete.
Exterior Emulsion painting two coats with best approved quality and colour emulsion paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Fabrication, Supply, delivery and fixing in position of outside M.S.ladder of 0.45m wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c/c welded, jointed etc., providing with one coat of Red Oxide paint for providing access to Roof top with suitable inclined length, bottom anchorage and including transportation charges etc., complete.
Supplying and fixing of CI manhole frame and cover of size 0.60mx0.60mwith suitable 50x50x6mm MS angle fixed along edges etc., complete.
SUB ESTIMATE I (RWHS & PLATFORM) Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B. For first depth of 2m
For Core wall
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete
Plastering with CM 1:5 mix using to 12mm thick including all cost and conveyance of all materials and all labour charges etc., complete.
Collection and supply of 40mm HBG metal and filling in to the recharge pits including cost and conveyance to the site and all labour charges for filling as per standard specifications.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
SUB ESTIMATE II (PIPE LINE & PUMPSET) Supply and delivery of 75mm 6KSC PVC Pipe
Earth work excavation with an initial lead and lift in hard stiff clay, black cotton, hard red earth, sub murram gravel, stone and earth mixed boulders as per SS20B for pipe laying work.
Refilling the excavated portions for Pipe Laying works with excavated earth as per ss20 B etc., complete.
Labour charges for Laying of GI, PVC rigid pipes with lead of 200m lowering into trench, laying in proper grade, alignment, jointing PVC coupler with specials and tested to the required pressure including conveyance of water upto 1km lead during the testing etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_779467.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_779467.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid