Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4,372.60Accepted-Finance | ₹4,372.60 | L1 | Accepted-Finance L1 |
| 2 | L2₹4,710+₹337.40 (7.72%)Accepted-Finance MU KOYALI BU PO NAVLI TA RISOD DIST WASHIM | RISOD | WASHIM | MAHARASHTRA | 444505 | ₹4,710+₹337.40 (7.72%) | L2 | Accepted-Finance L2 |
| 3 | L3₹4,725+₹352.40 (8.06%)Accepted-Finance | ₹4,725+₹352.40 (8.06%) | L3 | Accepted-Finance L3 |
| 4 | Rejected-Technical MU PO WASHIM TA JI WASHIM MAHARASHTRA | WASHIM | WASHIM | MAHARASHTRA | - | - | Rejected-Technical insufficient document |
| Sl No | Description | Qty | Unit | Akash Vinayakrao Ghuge L3 | VAIBHAV PRADIP JADHAV L2 | NANDINI ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00Supplying murum | ||||||
| 1.01 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken). | 1 | Cum | 1,200 ₹1,200 | 1,100 ₹1,100 | 1,058.8 ₹1,058.8 Lowest |
| 1.02 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken). | 1 | cum | 1,200 ₹1,200 | 1,300 ₹1,300 | 1,125.2 ₹1,125.2 Lowest |
| 1.03 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . | 1 | cum | 100 ₹100 | 90 ₹90 | 88.4 ₹88.4 Lowest |
| 1.04 | Supplying Stone Dust aggregate at the road site. | 1 | cum | 1,300 ₹1,300 | 1,300 ₹1,300 | 1,213 ₹1,213 Lowest |
| 1.05 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | 1 | cum | 800 ₹800 | 800 ₹800 | 783.2 ₹783.2 Lowest |
| 2.00 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | 1 | cum | 100 ₹100 | 90 ₹90 | 82.2 ₹82.2 Lowest |
| 3.00 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete. | 1 | sqm | 25 ₹25 | 30 ₹30 | 21.8 ₹21.8 Lowest |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
3 Jun 2026, 5:00 pmClosed
Chief officer
MC WASHIM
SUPPLYING, SPREADING AND COMPACTION OF MURUM AND OTHER MATERIAL FOR MUNICIPAL COUNCIL WASHIM AT WASHIM DIST WASHIM.
2026_DMA_1305434_1
MCW/PWD/2026-27/y. maintainance
Open Tender
Civil Works
Item Rate
365 days
MC WASHIM
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹30,000
16 Sept 2026
27 May 2026
5 Jun 2026
27 May 2026
3 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supplying murum | |||||
| 1.01 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken). | - | Cum | 1,058.8 | - |
| 1.02 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken). | - | cum | 1,125.2 | - |
| 1.03 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . | - | cum | 88.4 | - |
| 1.04 | Supplying Stone Dust aggregate at the road site. | - | cum | 1,213.6 | - |
| 1.05 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | - | cum | 783.2 | - |
| 2 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | - | cum | 82.2 | - |
| 3 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete. | - | sqm | 21.8 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
tdmurum.pdf
Tender Documents • 2.54 MB
BOQ_2240789.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .